Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

White River by Earlimart Stream Gauge Vegetation Removal

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources is seeking vegetation removal services at the White River by Earlimart (WRE) stream gauge located in Tulare County, California. The project is situated east of Highway 99 and southeast of the City of Earlimart on the right bank of the White River adjacent to Road 168. The primary objective is to maintain station access and ensure proper operation by removing vegetation from the bubbler line and staff gauge within the dry channel, extending from the levee road to the current waterline, and covering 10 feet both upstream and downstream of the gauge station. The scope of work requires the use of hand tools and a weed eater for all vegetation removal. This project is classified under NAICS code 561730 and is designated as a forecast. It is categorically exempt under section 15301 for existing facilities, as the work involves maintenance without expansion and does not affect sensitive biological or cultural resources. The project is managed by Senior Engineer Hossein Aghazeynali.

General Info

Vegetation removal near White River stream gauge to maintain access and support water monitoring.

Agency

California Water Resources, Department of

NAICS

561730 - Landscaping ServicesView NAICS

Place of Performance

Road 168 and Avenue 32, CA, 93215

Set-Aside

NONE

Documents

(1)

Notice of Exemption for White River by Earlimart Stream Gauge Vegetation Removal

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Hossein AghazeynaiSenior engineering, Water Resources

Full Description

Show more
Hand tools and a weed eater will be used to remove vegetation from the bubbler line and staff gauge within the dry channel of the White River, from the levee road to the current waterline, and from 10 feet upstream and downstream of the WRE stream gauge station. The work is necessary to maintain access to the station and for proper operation of the station. Local farmers, residents, and local jurisdictions will benefit.

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
Snow Plowing and Ice Management in Bangor, ME
Solicitation # snow-plowing-ice-management-bangor-me
Arbor E&T dba EQUUS Workforce Solutions is soliciting quotes from licensed and insured providers for comprehensive snow plowing and ice management services at the Penobscot Job Corps Center located at 1375 Union Street, Bangor, Maine. The contract period runs from October 15, 2026, through April 30, 2027, with the possibility of annual renewals upon mutual written agreement. Bids are due by 12:00 Noon on Friday, September 4, 2026. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. The scope of work requires the contractor to clear all parking spaces, drive lanes, and primary perimeter walkways to a minimum width of 4 feet, ensuring surfaces are cleared to bare pavement. Services are automatically triggered by 4.0 inches of snow accumulation, and all primary areas must be clear by 6:00 AM on weekdays, weekends, and holidays. Following plowing, premium rock salt must be applied to the primary asphalt road, parking lots, and sidewalks. Contractors must conduct a joint pre-season inspection with the Facility Supervisor before October 15, 2026, to document existing property damage. Safety and compliance requirements include the use of high-visibility safety vests and vehicle strobe lights during all operations. Contractors must provide a Certificate of Insurance proving at least $1,000,000 in Commercial General Liability insurance, naming the client as an additional insured. Pricing should be submitted based on per-event and hourly rates. The primary point of contact for this solicitation is David Landry, F&A Director.
Arbor E&T, LLC

POSTED

about 10 hours ago

DEADLINE

in about 2 hours
View Details