Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Wildflower Station Townhomes 2 Multifamily Residential Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Antioch

NAICS

237210 - Land SubdivisionView NAICS

Place of Performance

Hillcrest Avenue, Wildflower Station Place, Antioch, CA, 94531

Set-Aside

NONE

Documents

(1)

Wildflower Townhomes Notice of Exemption 11-6-25

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Antioch
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Antioch
Office AddressN/A
Contacts
Kathryn WattProject Applicant
Zoe MeridethPlanning Manager

Full Description

Show more
The Wildflower Townhomes Project (proposed project) would consist of a Vesting Tentative Subdivision Map that would subdivide the project site into 19 lots, each of which would contain one townhome building, associated sidewalks, and landscaping. The proposed project would include the development of a total of 159 units, consisting of “Row Townhomes” (63 units) and “Back to Back” (B2B) (96 units). All units would have at least one private deck, a storage area of at least 250 cubic feet, and an attached garage. Five Row Townhome floorplan types would be offered with two bedrooms and 2.5 baths, ranging in size from 1,135 square feet (sf) to 1,238 sf. Two B2B floorplans are offered: a two-bedroom (en suite) plan that is 1,293 sf, and a three-bedroom plan that is 1,381 sf. Both B2B floorplans include 2.5 bathrooms. Primary access to the project site would be provided by two entrances: one from Wildflower Drive at the southern end of the project site onto Wildflower Station Place, and one from Hillcrest Avenue at the northeast corner of the site to the private street Hillcrest Commons. Automatic gates are proposed as an option at both entrances, pending approval from the current homeowners on Wildflower Station Place, and their homeowner’s association (HOA). The entire site would be fenced with tubular steel, non-climb fencing located at the top of slope along Hillcrest Avenue and Wildflower Drive. A pedestrian/resident-access-only gate in the fencing would be provided between Buildings 10 and 11, with stairs and an accessible ramp to lead to the public sidewalk and the crosswalk on Hillcrest Avenue. Additionally, separate parcels are proposed for the internal roadway network and private common areas. Along the northern project site boundary, a bio-retention area is planned. Common open space is located at the center of the proposed development, at the main entry from Wildflower Station Place. The central common area would include amenities with seating, picnic tables, a large shade structure, a play area for children, and a multipurpose turf area. Such amenities would serve as recreation areas for future residents. Mailboxes and areas for bicycle parking would be located to the west of the common open space.

Similar Contracts

Same NAICS industry code

NAICS: 237210
New
SLED
PLNP2024-00105 435 W. Delano Street Parcel Map
Solicitation # PLNP2024-00105
This project, identified as PLNP2024-00105 and located at 435 West Delano Street in the Rio Linda/Elverta community of Sacramento County, involves the division of a 5-acre lot into two residential parcels under AR-2 Agricultural-Residential zoning. Parcel 1 will be approximately 2.8 net acres, and Parcel 2 will be approximately 2.0 net acres, featuring a 1.4-acre designated buildable area for a residential homestead. Both lots will utilize individual private water wells and septic systems, and each will include one shipping container for private storage. The project requires a Parcel Map for the division and a Design Review to ensure compliance with Sacramento County Countywide Design Guidelines. To facilitate the new configuration, the project includes the removal of several trees and the relocation or removal of existing accessory structures. Access to Parcel 2 will be established via a 20-foot-wide ingress/egress easement through Parcel 1, and a fire department turnaround will be constructed on Parcel 2 according to SacMetro Fire District standards. A 10-foot-wide Public Utility Easement will also be established along the project frontage. The project has been granted a Notice of Exemption from further environmental review under CEQA Guidelines Section 15183, as it remains consistent with existing zoning and the General Plan Update EIR.
Sacramento County

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237210
New
SLED
Harvest Estates Residential Project; TSM 2025-01, ANX 2025-01, GPA 2025-01, REZ 2025-01, ENV 2025-02
Solicitation # ENV 2025-02
The Harvest Estates Residential Project is a comprehensive land-use development in Kerman, California, managed by the City of Kerman Community Development Department. The project involves the annexation of approximately 88.89 acres from Fresno County into the city limits, incorporating a General Plan Amendment, rezoning, and a vesting tentative subdivision map. The primary development consists of a 180-lot single-family residential subdivision on 31.28 acres, including internal streets, sidewalks, utility improvements, and drainage facilities. Additionally, the project includes a commercial remainder parcel and a 1.1-acre neighborhood park authorized via a conditional use permit, which will feature picnic areas, a shaded play structure for children, lawn areas, and pedestrian paths. The project has undergone environmental review under CEQA, resulting in a Mitigated Negative Declaration and a subsequent Notice of Determination certifying that the project will not have a significant effect on the environment. Key administrative actions include the detachment of approximately 38.93 acres from the Kings River Conservation District as approved by Fresno LAFCo. The development is bounded by West Nielsen Avenue to the north, North Del Norte Avenue to the west, West Whitesbridge Road to the south, and North Vineland Avenue to the east. Project coordination is led by City Manager John Jansons and the Community Development Department, with technical support from Precision Civil Engineering.
City of Kerman

POSTED

4 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS