This Solicitation opportunity from Florida was posted on May 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Wills Branch Creek Dredging - Rebid
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive dredging operations at Wills Branch Creek, requiring the contractor to supply all labor, materials, and equipment necessary for excavation, transportation, and disposal of sediment from the creek as detailed in the project plans. Additionally, the scope includes installing and maintaining temporary turbidity controls to mitigate environmental impact during construction, as well as clearing the banks of debris and vegetation, with specific provisions for replacing rubble rip rap slope protection as indicated in the plans. The work must commence within ten days of receiving written notice from the owner and is expected to be completed within 365 days, including Sundays and holidays. Contractors are encouraged to submit detailed schedules if off-hours work is necessary to meet deadlines. This project, titled "Wills Branch Creek Dredging - Rebid," is a solicitation posted on May 29, 2025, with a response deadline of July 3, 2025. It falls under the NAICS code 237990 and is managed by the Jacksonville office of Florida. The project size is estimated between $500,000 and $2,000,000. The primary point of contact is Benjamin Kemp, reachable via email at [email hidden] or by phone at [phone hidden]. The contract aims to ensure efficient and environmentally responsible dredging operations within the specified timeframe, adhering to all project specifications and environmental controls.
General Info
Agency
Place of Performance
FL, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
• Dredging / excavating, transportation, and disposal of material from Wills Creek as indicated in the contract plans. • Installation and maintenance of temporary turbidity controls associated with the project construction. • Clearing the banks of all debris and vegetation, including the replacement of rubble rip rap slope protection as called out in the contract plans.
The CONTRACTOR shall begin work within ten (10) calendar days, including Sundays and holidays, after the date of written notice from the owner to begin work, and shall complete the Base Bid work within 365 calendar days including Sundays and holidays, after the expiration of such ten (10) day notice. If the Bidder determines that off-hours work is anticipated to complete the project within such allotted times, a schedule therefore shall be attached to this proposal as required by Section 20.3.4 of the General Conditions.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
