Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Wilmington Town Beach (Lake Raponda) Erosion Mitigation Project

Active
76154State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Windham County Natural Resources Conservation District is seeking bids from qualified contractors for the Wilmington Town Beach Erosion Mitigation Project at Lake Raponda in Vermont. Funded by the Mount Ascutney Regional Commission Enhancement Design and Implementation Block Grant, the project focuses on implementing water quality improvements and erosion control. The scope of work includes the installation of grass pavers, infiltration steps, a bioswale, a dry-stacked stone walk, a stone bridge, a plunge pool, a dry swale, a check dam, benches, and various plantings. This solicitation, identified by number 76154, was posted on September 16, 2026, with a response deadline of October 2, 2026, at 10:00 AM. The project is managed under the Vermont Department of Economic Development. Interested parties must refer to the construction drawings provided by DuBois&King, Inc. and follow the specific bid submission instructions to be considered for the contract.

General Info

Bids for Wilmington Town Beach erosion mitigation project due October 2, 2026.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressVT, USA

Full Description

Show more
Windham County Natural Resources Conservation District (WCNRCD), with financial assistance provided by the Mount Ascutney Regional Commission Enhancement Design and Implementation Block Grant, requests bids from qualified contractors to implement water quality improvements at the Green Mountain Beach in Wilmington, VT.. Details of the project are provided on the following pages and in the attached construction drawings prepared by DuBois&King, Inc.. A project timeline is provided below. Instructions for submission of the bid sheet are provided below. This project consists of a variety of practices at the Green Mountain Beach on Lake Raponda to reduce erosion and protect water quality. Practices include grass pavers, infiltration steps, a bioswale, a dry-stacked stone walk, stone bridge, plunge pool, dry swale, check dam, benches and plantings. Please review the attached bid set designs and full specs for project details.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. This firm-fixed-price contract, with an estimated value between 1 million and 5 million dollars, involves three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, including clearing, grubbing, and stone rework. The period of performance is 200 calendar days from the receipt of the Notice to Proceed, and the project is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Technical requirements include the use of a third-party qualified surveyor for multi-beam hydrographic surveys to verify channel depths and the adherence to strict stone quality standards. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Bids must be submitted in sealed envelopes to the Fort Shafter office by the deadline, as electronic submissions are not permitted. Failure to meet the performance schedule may result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 237110
New
SLED
Clarifiers Rehabilitation Project
Solicitation # 76148
The City of Essex Junction is soliciting sealed bids for the Clarifiers Rehabilitation project at the Water Resource Recovery Facility located at 35 Cascade Street, Essex Junction, Vermont. The scope of work involves the rehabilitation of Primary Clarifier 1 and Secondary Clarifier 1, specifically focusing on the repair and coating of all steel in immersion, including walls, rake arms, drums, and piping, as well as the resurfacing, lining, and grout injection of concrete floors to stop water infiltration. An optional Add Alternate A is included for the rehabilitation of all atmospheric steel on Primary Clarifier 1. The contract will be awarded to the qualified responsive bidder providing the lowest total base bid. Bids must be submitted by 1:00 p.m. local time on October 1, 2026, and must include a bid guaranty of at least five percent of the bid amount via a bid bond or certified check. Successful bidders are required to provide performance and labor and material payment bonds equal to 100 percent of the agreement amount within ten days of the award. The project is anticipated to start on May 31, 2027, with a total completion timeframe of 120 calendar days following the Notice to Proceed. Contractors must provide a trained Quality Control Inspector and adhere to strict surface preparation and coating standards, including SSPC-SP1, SSPC-SP10, and SSPC-PA2. Progress payments will be made monthly based on certified estimates of work performed.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS