Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from South Carolina was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wimbee Creek Trestle Demolition

Closed
060426State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

Beaufort County is seeking to address safety concerns by removing and properly disposing of the deteriorated Wimbee Creek Fishing Pier, which is no longer safe for public use. This project is a precursor to the construction of a new fishing pier currently in the design phase. The solicitation, titled "Wimbee Creek Trestle Demolition," was posted on April 28, 2026, and responses are due by June 4, 2026. The contract is managed by the South Carolina Law Enforcement Division (SLED) under the Engineering agency of Beaufort County. The work is to be performed within South Carolina, with the county office located in Beaufort, SC. Primary contact for the project is Mark Johnson, a Projects Engineer, with Gillian Murray as the secondary contact and Senior Buyer. Interested parties can find more details and submit responses through the specified procurement portal.

General Info

Beaufort County seeks demolition and disposal of unsafe Wimbee Creek Fishing Pier by June 4, 2026.

Documents

6

Exhibit A - Wimbee Creek Fishing Pier Demo Plans 2026

PDF, High priority: read this firstspecifications
High

IFB #060426 - Wimbee Creek Trestle Demolition

PDF, High priority: read this firstifb
High

IFB #060426 - Wimbee Creek Trestle Demolition

PDF, High priority: read this firstifb
High

Wimbee Creek Fishing Pier Demolition Specifications

PDF, High priority: read this firstspecifications
High

Exhibit 4 - Monthly Compliance Status Report

PDF, Low priority1 page · compliance-report
Low

Exhibit_B_-_Abutment_Photographs.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Engineering
Contacts2 people available
OfficeBeaufort, SC, 29902, USA
Organization / AgencySouth Carolina → Engineering
Office AddressBeaufort, SC, 29902, USA
Contacts
Mark JohnsonProjects Engineer
Gillian MurraySenior Buyer

Interested Companies (35)

EnviroPro SolutionSalisbury, NC
AuSable EnterprisesBluffton, SC
Willie Keitt and SonsORANGEBURG, SC

See All 35 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Wimbee Creek Fishing Pier has been found to be in a deteriorated condition that is not safe for public use. Beaufort County desires the pier to be removed and properly disposed of in preparation for the construction of a new fishing pier that is being designed.

More opportunities from South Carolina → Engineering

Same awarding agency

NAICS: 237310
New
SLED
Beaufort County 2027 Resurfacing
Solicitation # IFB 111726
The Beaufort County 2027 Resurfacing project, solicitation IFB 111726, is a formal sealed bid effort to maintain county roads and assist the South Carolina Department of Transportation (SCDOT) in ensuring roadway safety. The scope of work includes road preparation, milling asphalt pavement for transitions, restoring shoulders to prevent drop-offs larger than two inches, and applying thermoplastic pavement markings and raised pavement markers. All work must adhere to the SCDOT 2025 Standard Specifications for Highway Construction and the 2009 Manual on Uniform Traffic Control Devices. Performance deadlines are set for June 1, 2027, for all SCDOT roads and September 30, 2027, for all Beaufort County roads. The contract will be awarded to the lowest responsible bidder based on the total price for items listed in the schedule, which includes significant quantities of asphalt surface course and milling. Bidders must submit electronic proposals via the OpenGov Procurement Portal by November 17, 2026, including a bid bond for five percent of the total bid amount. Awarded contractors are required to provide performance and payment bonds within fourteen days of notification. Key administrative requirements include the use of an independent third-party SCDOT Certified Level 1 inspection laboratory, submission of monthly applications for payment, and strict adherence to Small and Minority Business Participation reporting through monthly compliance status reports.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS