Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

WINDSHIELD PANEL,AI

Active
N0038326RHA48Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the repair, overhaul, and refurbishment of F/A-18 E/F and EA-18G windshield panel assemblies, specifically part number 74A350002-1035 with NSN 1560-01-569-1186, to be performed by SierraCin Corporation/PPG at their facility in Sylmar, California. All work must restore units to a Ready for Issue (RFI) condition in strict accordance with approved technical data, including Boeing drawings, PPG specifications such as drawings 271510-03 and 271520-63, and process specification ER17-043, as directed by F/A-18 FST Engineering. The contractor is solely responsible for providing all tools, test equipment, facilities, labor, and materials unless explicitly designated as Government Furnished Material; the use of MIL-W-81381 wire is prohibited and must be replaced with SAE-AS22759 series wire. First article testing is mandatory, requiring 14 days’ notice to the Government, with witnessed inspections at key stages including after coatings applications and final assembly, and the contractor bears all costs associated with failed or resubmitted tests. Configuration management is tightly controlled, requiring prior written approval from the Procuring Contracting Officer for any changes to drawings, specifications, repair methods, or facilities, and all modifications must align with NAVSUP WSS clause NAVICPIA18. Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) determinations require formal DCMA concurrence before any action, with no price adjustments permitted absent explicit Government authorization. The contractor must adhere to ISO 9001/SAE AS9100 quality systems, maintain ANSI/NCSL Z540.3 calibration standards, and implement rigorous receiving inspection protocols for all purchased materials. Cannibalization is strictly prohibited unless approved by NAVSUP WSS and the BDE, and all repaired items must be stored in an enclosed, protected environment. Inspection and acceptance occur at origin, and all contractual documents are deemed issued upon electronic transmission. The solicitation closed on April 17, 2026, and the contract is issued under N00383-22-G-SH01 with Rachel M. Opperman as the point of

General Info

Repair and refurbish F/A-18 E/F and EA-18G windshield assemblies per strict technical, quality, and regulatory standards at Sylmar, CA.

Agency

Department Of Defense → Navsup Weapon Systems SupportView Agency

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support
View Agency Profile
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE & RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1A || ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| THE PURPOSE OF THIS AMENDMENT IS TO INCREASE THE QTY ON PD N0038325U3502 FOR NIIN 015691186 TO A QTY OF 6. THE PURPOSE OF THIS AMENDMENT IS TO UPDATE THE TOTAL QTY TO 25. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. Early and incremental deliveries accepted. All terms and conditions are in accordance with BOA:N00383-22-G-SH01 INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN POC: RACHEL.M.OPPERMAN.CIV@US.NAVY.MIL \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: WINDSHIELD PANEL,AI ;74A350002-1025; P/N, ;1560-014471104; NSN, ;TECH DATA FOUND IN BOEING EDAL; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. WINDSHIELD PANEL,AI ;SIERRACIN CORPORATION; Company Name , ;12780 SAN FERNANDO RD, SYLMAR, CA 91342-3728; Address , ;12035; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: WINDSHIELD PANEL,AI ;1560-01-569-1186; NSN , ;74A350002-1035; Part Number, Shall be performed IAW: WINDSHIELD PANEL,AI ;Repair manuals and specifications as indicated by the F/A-18 E/F and EA-18G FST Engineers; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS Additional comments to the Statement of Work F/A-18 E/F & EA-18G Windshield Frame Assembly Repair and Refurbishment 74A350002 1.SCOPE This SOW defines the requirements associated with the repair/refurbishment of F/A-18 E/F and EA-18G framed windshield assemblies. Repair of the assemblies includes all facets of refurbishment from component repair and replacement and various coatings applications. The intent of this SOW is to establish an oversight document in generating a PPG process specification derived from historical and current F/A-18 A-D major and minor repair documents. The scope of the effort is being accomplished in conjunction with F/A-18 FST Engineering 2. Qualification PPG will receive a framed windshield assembly unit, P/N 74A350002, intended for repair to the -1039, NSN XXXX-XX-XXX-XXXX configuration. Qualification to repair government furnished assets will be given through first article acceptance to the deliverables listed below. FRCSW will qualify PPG's process of a finished assembly via in-process and final inspections with both visual inspections and data analysis. 3.Deliverables PPG shall repair the asset in accordance with the following: a) PPG drawings and specification 1.271510 (frame drawing), PN 271510-03 2.271520 (frame/windshield drawing),PN271520-63 3.ER17-043 (process specification) b) IAW Boeing drawing 74A350002 c) First article inspection of framed windshield assembly at the following stages: 1. After MMS-443, MMS-487 coatings application per drawing 74R350002 prior to type 2 primer, MMS-419, and topcoat application 2. Final assembly - top coated and sealed d) MMS-443, MMS-487, and MMS-419 coating applied per drawing 74R350002. PPG shall provide the following coating data: 1. Material Certificate of Conformance 2. Material thickness data measured per FRCSW drawing 137344 specified locations 3. Density data report (via ASTM D7XX witness panels) 4.MMS-419 thickness to be reported. 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: WINDSHIELD PANEL,AI ;74A350002-1035; P/N, ;1560-01-569-1186; NSN, ;As stipulated by the F/A 18 FST Engineers.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. WINDSHIELD PANEL,AI ;SIERRACIN CORPORATION/PPG; Company Name , ;12780 SAN FERNANDO RD SYLMAR, CA, 91342-3728; Address , ;12035; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE Qualification to repair government furnished assets will be given through FIRST ARTICLE acceptance to the deliverables indicated. FRCSW will qualify PPG'sprocess of a finished assembly via in-process and final inspections with both visual inspections and data analysis. 1 Lot not separately priced in ITIMP c)First article inspection of framed windshield assembly at the following stages: 1.After MMS-443, MMS-487 coatings application per drawing 74R350002 prior to type 2 primer, MMS-419, and topcoat application 2.Final assembly - top coated and sealed FRCSW will qualify PPG's process of a finished assembly via in-process and final inspections with both visual inspections and data analysis. 4.1 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.1.1 Dimensional test (special) ;APPLIES; 4.1.2 Requirements of: ;Statement of work and all instructions as indicated by the F/A 18 Engineers; 4.1.3 Form ;APPLIES; 4.1.4 Fit ;TBD; 4.1.5 Function ;TBD; 4.1.6 Compliance with drawing ( ;76301; ) ;74A350002 Assembly 271510 (frame drawing), PN 271510-03 271520 (frame/windshield drawing), PN 271520-63; , Revision ;As indicated; and specifications referenced therein. 4.2 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.3 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.4 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.4.1 The QAR shall be present to witness all First Article Testing. 4.4.2 The following additional personnel shall witness the First Article Testing: ;FRCSW ENGINEERING NAVSUP WSS DCMA; 4.5 Disposition of FAT samples 4.5.1 ; ; Sample(s) may be destroyed during testing. 4.5.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.6 Test Sample Coating Instructions 4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.7 Notice to Government of Testing at the contractors facility. 4.7.1 FAR 52.209-3 applies (A) The contractor shall present ;1; ; unit(s) of the following CAGE( ;76301; ; ), Part Number ;74A350002; ; , Revision ;Latest; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;FRCSW NAVSUP WSS code N23.7: mark.fitting@navy.mil; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Similar Contracts

Same NAICS industry code

NAICS: 336413
New
DIBBS
PISTON, HYDRAULIC AC
Solicitation # SPE4A7-26-T-612C
The contract specifies the procurement of two hydraulic pistons for air conditioning systems under NSN 1650-01-517-7844 and part number 11463841 from RANDOLPH & BALDWIN, INC. Delivery is required FOB origin within 171 days, with no variance allowed in quantity, and inspection and acceptance are to occur at the manufacturer’s location. All items must comply with DLA’s Master List of Technical and Quality Requirements, which supersede all other standards including ASTM D3951, and packaging must follow MIL-STD-129 and RP001 guidelines. Sampling and inspection adhere to MIL-STD-1916 or ASQ H1331 with zero non-conformances required unless otherwise stated, and critical, major, and minor attributes are assigned verification levels VII, IV, and II respectively. Quality management systems must meet ISO 9001:2015, and measuring equipment must meet RT001 standards. Physical identification and bare item marking are mandatory per RQ017. The contract references revision B of drawing NR 18876 dated 08/13/1997 and revision D dated 07/02/1985, with a newer revision dated 03/14/2024 governing the current requirement. The item must be delivered to the DLA Distribution facility in New Cumberland, PA, with the original required delivery date set for January 27, 2027, and an anticipated ship date of January 31, 2027. The contract was solicited under SPE4A7-26-T-612C, classified under NAICS 336413, with Jamiah Sutton as the primary point of contact.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 336413
New
DIBBS
VIBRATION ISOLATOR,
Solicitation # SPE4A7-26-T-612K
The contract pertains to the procurement of 605 units of a vibration isolator, identified by NSN 1680-01-552-5433 and part number 51037 from TECH PRODUCTS CORP, under solicitation SPE4A7-26-T-612K. Delivery is required within 67 days of order placement, with FOB origin terms and inspection and acceptance occurring at the destination. The quantity is fixed with no tolerance for variance, and packaging must comply with ASTM D3951 while adhering strictly to MIL-STD-129 for marking and labeling, with palletization governed by DLA’s RP001 packaging requirements. The DLA Master List of Technical and Quality Requirements supersedes any conflicting standards. Sampling follows MIL-STD-1916 or ASQ H1331 with zero non-conformances required unless otherwise stated, and attributes are classified with verification levels VII, IV, and II for critical, major, and minor characteristics respectively. The item is designated as a critical application component and must be physically marked per RQ017. Cybersecurity compliance mandates a CMMC Level 2 self-assessment, and government identification must be removed from non-accepted supplies. The delivery address is DLA Distribution Jacksonville, and transportation guidelines reference DLAD Proc Notes C19 and C20. The original delivery requirement is set for December 12, 2026, with a needed ship date of July 15, 2026. The contract falls under NAICS code 336413 and is managed by the Department of Defense’s ASC Supplier Oper AE and AF Division.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 336413
New
DIBBS
CONTRACTOR FIRST ARTIC
Solicitation # SPE4A7-26-T-611G
The contract pertains to the procurement of a Hydraulic Motor-Pump, identified by part number 4110820-1 from Triumph Actuation Systems LLC, with a corresponding NSN of 1650012936045, and includes a separate first article test requirement under NSN 0001S00000053. The item is designated as a Critical Application Item and must fully comply with stringent technical and quality standards referenced from the DLA Master List, including requirements for configuration change management, inspection and acceptance at origin, and physical identification per MIL-STD-130 for Item Unique Identification. Packaging and marking must adhere to MIL-STD-2073-1E and MIL-STD-129, respectively, with specific packaging codes and methods outlined under DLA packaging directives. The contract mandates zero tolerance for quantity variance and requires delivery FOB origin, with inspection and acceptance also occurring at the origin. Sampling and quality verification follow MIL-STD-1916 or comparable zero-based plans, with critical attributes assigned a verification level of VII and an AQL of 0.1. A separate line item exists for the First Article Test, requiring one unit to be submitted for testing, with no separate charge implied if not priced explicitly. Delivery must be completed within 613 days of contract award, with a required ship date set for September 29, 2025, to the designated DLA Distribution facility in New Cumberland, Pennsylvania. All terms are governed under the referenced DLA procurement directives and federal acquisition regulations, including clauses related to first article testing and contractor compliance.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 336413
New
DIBBS
PLATE, STRUCTURAL, AIRCR
Solicitation # SPE4A7-26-T-611D
The contract pertains to the procurement of six structural aircraft plates, specifically identified as a seal assembly for fixed leading edge slats, with NSN 1560-01-281-6333 and purchase request number 7017739703. The item is subject to strict export control under either ITAR or EAR, meaning any transfer, including mere disclosure of technical data to foreign persons regardless of location, requires prior authorization from the Department of State or Commerce. DFARS 252.225-7048 governs the handling of this controlled data, and only DLA contractors with approved US/Canada Joint Certification Program certification, completed training on proper handling of DOD export-controlled technical data, and approved access through the DLA questionnaire are permitted to receive it. The solicitation, numbered SPE4A7-26-T-611D, was posted on August 4, 2026, with a response deadline of August 12, 2026, and is designated as a total small business set-aside under NAICS code 336413. Performance is required at Robins Air Force Base, Georgia, with a delivery window of 171 days after order. The contracting office is the Department of Defense’s ASC Supplier Oper AE and AF Division, with Mahlon Marcus as the primary point of contact. The procurement is managed under federal acquisition protocols and is accessible through the DIBBS system, with strict compliance required for handling sensitive technical data tied to national security.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 336413
New
DIBBS
SLIDE, ESCAPE, AIRCRAFT
Solicitation # SPE8E6-26-Q-0610
The contract pertains to the procurement of seven units of a critical safety item, specifically an aircraft escape slide designated by NSN 4240-01-075-6640 and part number 16D22231-103, supplied by Air Cruisers Company, LLC. The item is classified as a Commercial Off the Shelf (COTS) product and is subject to stringent quality and packaging requirements mandated by the Defense Logistics Agency. All supplies must conform to MIL-STD-129 for marking, including lot and serial numbers, contractor and manufacturer CAGE codes, and part numbers, with no use of plastics for wrapping, cushioning, or dunnage whenever permissible. Packaging must comply with MIL-STD-2073-1E and RP001 DLA Packaging Requirements, ensuring full physical and mechanical protection during transport and storage. The product is designated as a Critical Safety Item by the Air Force, requiring strict adherence to technical and quality standards referenced from the DLA Master List, including compliance with SAE AS9100 and DLA Directive Procurement Note C03 for supply chain traceability documentation retention. Inspection and acceptance occur at origin, with sampling governed by MIL-STD-1916 or ASQ H1331, employing zero-defect acceptance criteria unless otherwise specified. The contractor must provide FAA airworthiness approval documentation and fulfill all documentation requirements for source approval requests. Delivery is due within 90 days after award, with FOB Origin terms and no variance allowed in quantity. Hazardous materials handling must follow DLAD Procurement Note C19, and shipment must be directed to the designated DLA Distribution Depot in Tinker AFB, Oklahoma. The contract mandates full compliance with Federal Aviation Administration airworthiness standards, retention of technical data per the Technical Data Package Revision A, and control of covered defense information under RD003. All waivers or deviations must be submitted to the DSC Contracting Officer for approval, with noncompliance potentially affecting contract acceptance.
DEPOT OKLAHOMA

POSTED

about 4 hours ago

DEADLINE

in 6 days
View Details
NAICS: 336413
New
DIBBS
ROLLER ARM, CONTROL
Solicitation # SPE4A7-26-T-610T
This contract is for the procurement of 26 Roller Arms, Control, identified by part number 6PA30 and NSN 1680-01-192-6832, supplied by Honeywell Sensing and Control with CAGE code 91929. The items are classified as a critical application item and must comply with stringent quality and security requirements, including CMMC Level 2 Cybersecurity Self-Assessment and tailored higher-level contract quality standards applicable to both manufacturers and non-manufacturers. All supplies must meet DLA packaging requirements, adhere to MIL-STD-2073-1E and MIL-STD-129 for packaging and marking, and be delivered FOB origin with zero variance in quantity. Inspection and acceptance occur at the destination, and any non-accepted items must have government identification removed. The contract mandates strict configuration change management through engineering change proposals and variance requests. Delivery is due within 171 days of the contract award, with an original required delivery date of May 1, 2027, and a need ship date of January 31, 2027. Pricing is set at $26.00 per unit for a total contract value of $676.00. Transportation and shipping instructions are governed by DLA procedural notices, and the delivery address is DLA Distribution Jacksonville, Florida. The solicitation number is SPE4A7-26-T-610T, issued by the Department of Defense under NAICS code 336413, with responses due by August 12, 2026.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 336413
New
DIBBS
DRY FIRE MAGAZINE, P
Solicitation # SPE2DS-26-T-306A
The dry fire magazine is a non-functional training aid designed exclusively for resetting the trigger assembly of a 9mm pistol during marksmanship drills. It has precise dimensional requirements: length between 5.05 and 5.07 inches, height between 1.56 and 1.58 inches, width between 1.19 and 1.21 inches, and a cubic measure of 9.53 cubic inches. It is incapable of holding any ammunition and serves solely as a mechanical training device to simulate magazine insertion and trigger manipulation without live rounds. The unit of issue is each, and the item is identified by NSN 6910-01-708-4254 with a procurement quantity of 20 units. This acquisition is governed by DLA packaging and technical requirements referenced in the DLA Master List of Technical and Quality Requirements, with compliance determined by the version in effect on the solicitation or award date. Removal of government identification from non-accepted supplies is mandated under RQ011. The contract solicitation, numbered SPE2DS-26-T-306A, was posted on August 4, 2026, with responses due by August 10, 2026. The procurement falls under NAICS code 336413 and is managed by the Department of Defense’s Medical Supply Chain MD Surg FSF. Delivery is required within 20 days of award, and performance is specified to occur at FPO, ZIP 96673. The primary point of contact for inquiries is Tiffany Parker, reachable via email and phone provided.
MEDICAL SUPPLY CHAIN MD SURG FSF

POSTED

about 4 hours ago

DEADLINE

in 6 days
View Details
NAICS: 336413
New
DIBBS
STRAP, WEBBING
Solicitation # SPE4A7-26-T-613B
The contract pertains to the procurement of STRAP, WEBBING with part number 051497-141 and NSN 1680-01-646-6238, for a quantity of 15 units at a unit price of $15.00, totaling $225.00. Delivery is required FOB origin with a lead time of 171 days, and the item must be delivered by January 31, 2027, with an original required delivery date of June 10, 2027. Inspection and acceptance occur at origin, and the supplier must comply with all DLA Master List of Technical and Quality Requirements, which supersede any conflicting standards. Sampling must follow MIL-STD-1916, ASQ H1331 Table 1, or a comparable zero-based plan, with critical, major, and minor attributes assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 respectively; unspecified attributes are treated as major. Acceptance requires zero non-conformances in the sample unless otherwise stipulated. The product must be marked and labeled per MIL-STD-129 and packaged per ASTM D3951, with palletization conforming to DLA packaging requirements. All government identification must be removed from non-accepted items. The unit of issue is each, and packaging quantity per unit pack is specified in the contract. The delivery destination is the DLA San Joaquin facility in Tracy, CA, and transportation instructions are governed by DLAD Proc Notes C19 and C20. The solicitation number is SPE4A7-26-T-613B, released on August 4, 2026, with a response deadline of August 12, 2026, under NAICS code 336413 and managed by the Department of Defense.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 336413
New
Federal
17--ACTUATOR,UPLOCK, IN REPAIR/MODIFICATION OF
Solicitation # N0038325QT470
This contract involves the procurement of two actuators, specifically designated as NSN 7R-1710-016657872-P8, TDP version 001, with a delivery term FOB origin. The contractual documents related to this procurement, including contracts, purchase orders, task orders, delivery orders, and modifications, are considered issued once they are transmitted via mail, facsimile, or electronic methods such as email. The government's acceptance of the contractor's proposal signifies a bilateral agreement to issue these documents as outlined. Early and incremental deliveries are accepted and preferred, indicating flexibility in the delivery schedule to accommodate the government's needs. The solicitation, titled "17--ACTUATOR, UPLOCK, IN REPAIR/MODIFICATION OF," was posted on August 5, 2025, with a response deadline of September 5, 2025. The procurement is managed by the Department of Defense’s Naval Supply Systems Command Weapon Systems Support office in Philadelphia, PA. The primary point of contact is Destiny N. Wiatr, reachable via email and phone, who oversees the contractual process. The procurement process is conducted under a presolicitation type, with no specified set-aside or NAICS code, emphasizing its open nature. The contract aims to support the repair and modification of uplock actuators, crucial components likely used in military or defense-related applications.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 9 hours ago

DEADLINE

in 13 days
View Details
NAICS: 332721
New
Federal
53--BUSHING,SLEEVE
Solicitation # N0038326QLA93
This contract involves the procurement of a bushing sleeve identified by NSN 1R-5365-016836577-QE and referenced as ST4M166-14-010, with a quantity of one unit to be delivered FOB origin. The part is classified as flight critical and requires prior Government source approval due to the unique design capability, proprietary manufacturing knowledge, and technical data held exclusively by approved sources, none of which are economically available to the Government. Only previously approved sources have been solicited, and new sources must submit detailed qualification documentation per NAVSUP Weapon Systems Support Source Approval Information Brochures for either spares or repair, depending on their experience. Proposals lacking complete submissions or evidence of prior approval submission will be rejected. The approval process for new sources cannot be completed in time to meet urgent Fleet support requirements, necessitating the use of sole-source procedures under FAR 6.302-1. Any offeror not currently approved must provide all required technical and capability data concurrently with their proposal. The Government retains sole discretion to determine whether competition is warranted based on responses received within 45 days, or 30 days if awarded under an existing Basic Ordering Agreement. The acquisition is subject to Free Trade Agreements and the Buy American Act—Free Trade Agreements—Balance of Payments Program clause, as well as the World Trade Organization Government Procurement Agreement clause. The Government is not employing the commercial item acquisition policies under FAR Part 12, though interested parties may still propose commercial alternatives within 15 days of notice. Technical documentation such as military specifications, standards, and Qualified Product Lists can be accessed via the ASSIST-Online database or through the DODSSP in Philadelphia. All responses must be directed to the designated point of contact, Kimberly Flores, with submissions evaluated solely to inform the procurement decision. The place of performance and delivery terms do not alter the mandatory approval requirements tied to the part’s critical function and exclusive technical data rights.
Precision Turned Product Manufacturing

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332710
New
Federal
LOAD CELL,AIRCRAFT,
Solicitation # N0038326QPC24
This contract solicits four aircraft load cells with NIIN 015396227 and part number 1220-QF-12.5K, requiring quotes to be submitted via email to dana.n.knittel.civ@us.navy.mil by the deadline of September 3, 2026. The solicitation is issued under N0038326QPC24 by the Naval Supply Systems Command Weapon Systems Support, with performance to be conducted at the Philadelphia, Pennsylvania location. All offers must include full compliance with mandatory source approval requirements outlined in the NAVSUP WSS Source Approval Brochure, and proposals lacking complete documentation will be disqualified. Government source approval is mandatory prior to award, and failure to obtain timely approval may result in the award being deferred to meet fleet support needs. Early and incremental deliveries are preferred. The contract includes several applicable clauses, such as a 12-month warranty with 60 days to report defects, Buy American Act requirements, security prohibitions, and mandatory use of Workflow Pro’s Assist Module. The offeror must also adhere to the mandatory use of the Invoice and Receiving Report Combo type with TBD routing details, and comply with equal opportunity and royalty provisions. The NAICS code is 332710, and the contract falls under a Department of Defense procurement with an emphasis on national defense and energy program priorities.
Machine Shops

POSTED

about 9 hours ago

DEADLINE

in 30 days
View Details
NAICS: 336413
New
Federal
FAIRING ASSEMBLY
Solicitation # N0038325QT514
This contract pertains to the repair, overhaul, and testing of a Fairing Assembly, with the work to be performed primarily by The Boeing Company at their facility in Seattle, Washington. The scope includes disassembly, cleaning, inspection, component repair or replacement, reassembly, and testing to restore the items to a serviceable condition, known as Ready for Issue (RFI). The contractor is responsible for providing all necessary parts, materials, tooling, and facilities, ensuring compliance with applicable standards such as MIL-STD-130 and the Boeing drawing specifications. The contract emphasizes strict adherence to configuration management, quality control in accordance with ISO 9001/SAE AS9100, and proper storage and handling procedures. Key contractual elements include specific repair turnaround times, procedures for handling items beyond economical repair, missing parts on induction, and over and above repairs, with detailed requirements for documentation, approvals, and change management. The contract also mandates that all work be performed in a controlled environment, with quality assurance provisions and calibration systems in place. Payment and invoicing will follow the Wide Area Workflow system, with early and incremental deliveries preferred. The contract is managed by the Department of the Navy’s Naval Supply Systems Command, with primary contact via email and phone, and the solicitation was posted on SAM.gov with a response deadline of September 8, 2025.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 9 hours ago

DEADLINE

in 13 days
View Details
NAICS: 336413
New
Federal
SUPPORT,STRUCTURAL
Solicitation # N0038326QTB99
The contract, titled SUPPORT, STRUCTURAL, is solicited under number N0038326QTB99 by the Naval Supply Systems Command Weapon Systems Support, a branch of the Department of Defense, with the primary office located in Philadelphia, Pennsylvania. The solicitation was posted on August 4, 2026, and responses are due by September 3, 2026, at 8:30 PM Eastern Time. The NAICS code 336413 indicates this procurement is for ship and boat building and repairing services. All contractual documents are considered officially issued upon electronic transmission or mailing, and early or incremental deliveries are both accepted and preferred. The point of contact is Destiny N. Wiatr, reachable via email at Destiny.n.wiatr.civ@us.navy.mil, with a secondary telephone number provided for inquiries. The contract incorporates multiple mandatory federal provisions and certifications, including those related to the Buy American Act, Free Trade Agreements, and Balance of Payments Program requirements, all effective as of February 2024. It mandates the use of Workflow Pro (WFP) Mod Assist Module under the N79 PAC designation and enforces the Navy's policy on AbilityOne support contractor information release. Additional clauses address Security Prohibitions and Exclusions, Equal Opportunity for Workers with Disabilities, and Annual Representations and Certifications under specific deviations effective in February 2026. The contractor must comply with National Defense Priority Ratings and adhere strictly to Item Unique Identification and Valuation standards. Payment instructions are to be submitted through Wide Area Workflow, using Invoice and Receiving Report formats, with payment processed under the N00383 designation. Royalty information and contractual issuance protocols are also explicitly defined.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 9 hours ago

DEADLINE

in 30 days
View Details
New
Federal
28--CABLE ASSEMBLY,CIA,- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QPC20
The contract pertains to a flight-critical cable assembly and similar replacement parts designated by NSN 7R-2840-015911511-SX, with a quantity of four units to be delivered FOB origin. Acquisition is restricted to previously approved sources due to essential proprietary technical data, unique design capabilities, and specialized manufacturing or repair knowledge held exclusively by those sources, which the Government cannot economically obtain elsewhere. Source approval by the Navy’s Design Control Activity is mandatory prior to contract award, and no full and open competition is permitted due to the item’s critical nature and insufficient publicly available technical data. Only firms previously qualified by the Government may submit proposals; new sources must submit comprehensive documentation as outlined in the NAVSUP Weapon Systems Support Source Approval Information Brochures for spares or repair, and failure to provide complete data will result in disqualification. If evaluation timelines prevent approval of a new source before delivery requirements, award may proceed based on fleet operational needs using only qualified sources. All offers must meet qualification criteria at the time of award as per FAR clause 52.209-1, and the Government is not applying commercial item acquisition policies under FAR Part 12. Additional technical specifications and standards can be obtained through ASSIST-Online or the DODSSP, and inquiries must be directed to the named point of contact.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
CMIDS PLATE
Solicitation # N0038326QTB96
The contract pertains to the procurement of CMIDS PLATE under solicitation number N0038326QTB96, issued by the Naval Supply Systems Command Weapon Systems Support within the Department of Defense. The solicitation was posted on August 4, 2026, with a response deadline of September 3, 2026, and is classified under NAICS code 333998. The primary point of contact is Destiny N. Wiatr, reachable via email at Destiny.n.wiatr.civ@us.navy.mil and telephone at 215-697-3528, with the office located in Philadelphia, Pennsylvania. Contractual documents are considered officially issued upon electronic transmission, including email, fax, or mail, and government acceptance of the contractor’s proposal forms a binding agreement. Early and incremental deliveries are encouraged and preferred. The contract incorporates multiple mandatory federal clauses and compliance requirements, including the mandatory use of Workflow Pro (WFP) Mod Assist Module, adherence to Buy American and Free Trade Agreements, and certification for Balance of Payments Program compliance. Security prohibitions and exclusions, equal opportunity provisions for workers with disabilities, and specific naval directives regarding AbilityOne contractor information release are fully applicable. The contract also enforces Notice of Priority Rating for national defense and emergency preparedness purposes, and requires strict compliance with Item Unique Identification and Valuation standards effective January 2023. Payment instructions are linked to Wide Area Workflow, with invoice and receiving report details to be confirmed, and royalty information and annual representations are required per applicable deviations and amendments effective through 2026.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 9 hours ago

DEADLINE

in 30 days
View Details
NAICS: 335929
New
Federal
61--CORD,ELECTRICAL
Solicitation # N0038326QFB02
The U.S. Navy’s NAVSUP Weapon Systems Support in Philadelphia is proceeding with a sole-source procurement for 18 electrical cords, part number 06600-00839-110 and NSN 1R-6145-016986237-H5, under authority of 10 U.S.C. 3204(a)(1) and FAR 6.302, due to the exclusive nature of the item and the government’s lack of ownership or rights to the data required to source it elsewhere. The delivery term is FOB origin, and the acquisition will be conducted through the existing Basic Ordering Agreement N00383-26-G-P401 with Sikorsky, as no alternative suppliers can meet the requirement. All responsible entities may submit capability statements, but only Sikorsky is anticipated to provide an acceptable offer, and no competition will be pursued unless compelling contrary evidence arises. Any firm not already approved to manufacture the item must submit a Source Approval Request, though the procurement will not be delayed for such approvals. The acquisition will follow FAR Part 15 procedures, excluding commercial item policies under FAR Part 12 due to the custom, non-commercial nature of the item. The solicitation is not a small business set-aside and will be managed electronically through NECO, with no hard copies or phone requests accepted. Submissions of qualifications must be sent via email to the designated point of contact by the September 18, 2026 deadline, and responses received within 45 days of the synopsis posting may be considered for future competitive intent assessments.
Other Communication and Energy Wire Manufacturing

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334517
New
Federal
FMS REPAIR REQUIREMENT FOR THE COUNTRY OF AUSTRALIA NIIN: 016893937 I P/N: 720200-05-00
Solicitation # N0038325Q0137
NAVSUP Weapon Systems Support (NAVSUP WSS) in Philadelphia has issued a solicitation to identify parties capable of providing repair services for a specific component, designated by NSN 5855-01-689-3937 and part number 720200-05-00, used in the F-18 aircraft. The repair requirement is intended to support Foreign Military Sales (FMS) for Australia. This procurement is conducted under the authority of FAR 6.302-1, indicating that the Government plans to negotiate with only one source, though all interested and qualified sources are encouraged to submit capability statements by 2:00 PM Eastern Time on October 30, 2025. The Government may exercise discretion in its decision to open the contract to competition, and only sources approved through the established Source Approval Request procedures will be considered without delay to the award. If a prospective contractor is not yet an approved source, they must submit a detailed package as described by the NAVSUP-WSS Source Approval Information Brochure for Repair. The contract opportunity, posted under solicitation number N0038325Q0137, is not set aside for small business or other specific categories, though it is classified as an 8(a) Sole Source under NAICS 334517. The place of performance is Fort Worth, Texas, and any questions or proposals should be directed to the primary point of contact, Hayden Young, at the provided email and phone number. Additional information and procedures for source approval can be found on the NAVSUP Weapon Systems Support Business Opportunities webpage.
Irradiation Apparatus Manufacturing

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 334515
New
Federal
66--OHMMETER
Solicitation # N0038326QPC25
The item identified by NSN 1R-6625-015427487-TX, titled 66--OHMMETER, is a commercial, nondevelopmental, off-the-shelf product requiring Government source approval prior to contract award due to its flight-critical nature or insufficient technical data to support full and open competition. Only previously approved sources have been solicited, and any offeror not already approved must submit comprehensive documentation as outlined in the NAVSUP Weapon Systems Support Source Approval Information Brochures, including evidence of production experience with identical or similar items. Proposals lacking complete source approval data or proof of prior submission will be disqualified. Delivery is FOB origin for nine units, and award is contingent on the offeror, product, or manufacturer meeting all qualification criteria at the time of award per FAR clause 52.209-1. The solicitation emphasizes that delays in source approval may not hinder award if Fleet operational needs necessitate timely procurement. Technical specifications and standards can be accessed via ASSIST-Online or the DODSSP, though drawings, patterns, and deviation lists are not available through these channels. All inquiries should be directed to the primary point of contact, Dana N. Knittel, at the NAVSUP Weapon Systems Support office in Philadelphia, PA.
Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details