Winter Storms 2024-25 Damaged Site – Cavedale Road

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Sonoma is undertaking emergency repairs to Cavedale Road at Post Miles 11.11 and 11.23 near Agua Caliente, California, following severe storm and flood damage during the 2024–25 winter season. The work involves reconstructing approximately 90 linear feet of roadway at PM 11.11 and 120 linear feet at PM 11.23, with extensive earthwork including excavation, subgrade benching, installation of rock slope protection with geotextile fabric and a fully grouted keyway, drainage improvements, guardrail placement, and reconstruction of the roadway surface using aggregate base and asphalt concrete. At PM 11.11, a 90-foot soldier pile retaining wall with concrete lagging will be constructed to stabilize the slope, and limited tree removal is necessary to facilitate construction. The project is funded entirely by local county funds and is being managed by the Sonoma County Department of Public Infrastructure, with a total construction duration of 60 working days, approximately three months. All work is being executed under state environmental exemptions under CEQA Sections 15269, 15301, and 15302, which classify the effort as an emergency repair and replacement of existing infrastructure without expansion. The project site is the sole place of performance, and inspection and acceptance will occur on-site under the oversight of the county’s Public Infrastructure department. No federal contracting mechanisms, FAR clauses, or federal funding sources apply; the effort is a purely local initiative with no formal solicitation, contract line items, or pricing details released. The sole point of contact for the project is Anthony Moore, Construction Engineer, reachable at the county’s offices in Santa Rosa, with no designated contracting officer or government representative assigned beyond the local project team.

General Info

Sonoma County conducts emergency road repairs on Cavedale Road using local funds, including retaining wall, drainage, and asphalt reconstruction.

Agency

California → Sonoma County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Sonoma, CA

Set-Aside

NONE

Documents

(2)

NOE Appendix D Cavedale-signed

PDF

Sonoma County Winter Storms 2024-25 Damaged Site Cavedale Road Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
Anthony MooreConstruction Engineer

Full Description

Show more
The County of Sonoma has proposed the 2024-25 storm damage repair projects at Cavedale Road (Postmile 11.11 & Post Mile 11.23), located near Agua Caliente, California. The Project will be funded by local funds and undertaken by the Sonoma County Department of Public Infrastructure. The purpose of the Project is to repair portions of Cavedale Road at approximately Postmiles 11.11 & 11.23 that failed during the 2024-25 storms and flooding. The County proposes to repair approximately 90 feet of roadway along Cavedale Road at PM 11.11 and approximately 120 linear feet on Cavedale Road at PM 11.23. The project proposes to construct storm damage slide repair work along Cavedale Road at Post Mile 11.11 and Post Mile 11.23. The work includes reconstructing the downslope roadway embankment by excavating native soil and establishing subgrade benching, placing rock slope protection and fabric, placing grouted rock slope protection, a fully grouted keyway, drainage improvements, guardrail, and finally reconstructing the roadway structural section of aggregate base and asphalt concrete and other items of work needed to restore the road to a functional condition. The work at Post Mile 11.11 also includes a 90 feet length soldier pile retaining wall with concrete lagging. Limited tree removal is also required to facilitate the work. The project has 60 working days, which is a construction duration of roughly 3 months.