Winter Storms 2024-25 Damaged Site – West Soda Rock Lane

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Sonoma is undertaking emergency repairs to a 100-foot segment of West Soda Rock Lane at Postmile 12.60 near Healdsburg, California, following severe storm and flooding damage during the 2024–25 winter season. The project, funded entirely by local funds and administered by the Sonoma County Department of Public Infrastructure, involves reconstructing the failed roadway embankment through excavation and subgrade benching, installation of rock slope protection with geotextile fabric, grouted rock slope protection including a fully grouted keyway, and reconstruction of the roadway surface using aggregate base and asphalt concrete. The work is limited to the existing right-of-way with no expansion of facility capacity and must be completed within 45 working days, roughly equivalent to two and a half months. The project qualifies for categorical exemptions under the California Environmental Quality Act, specifically Sections 15269(b)–(c) for emergency repairs and 15301(c) and 15302(c) for reconstruction of existing infrastructure, which expedite approval and eliminate the need for environmental impact reports. Inspection and acceptance occur at the project site under the oversight of the county, with compliance required to standard civil engineering practices and the CEQA exemption criteria. The project was approved on June 17, 2025, and the notice of exemption was filed on July 22, 2025. Anthony Moore, Construction Engineer, serves as the primary point of contact, though no formal Contracting Officer’s Representative or Procurement Contracting Officer is designated. There is no publicly disclosed contract value, no federal funding or FAR contract clauses applied, and no solicitation or bidding process was conducted as the work is authorized under emergency exemptions and directly executed by the county. Administrative fees such as a $50 environmental filing fee have been paid, but no invoicing systems or payment office details are specified, and no federal socioeconomic certifications, unique entity identifiers, or packaging and marking requirements are applicable.

General Info

Sonoma County emergency-repairs 100-foot road segment using local funds, no bidding, CEQA exemptions apply.

Agency

California → Sonoma County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Healdsburg, CA

Set-Aside

NONE

Documents

(2)

Notice of Exemption for West Soda Rock Lane Storm Damage Repair

PDFnotice-of-exemption

Sonoma County Winter Storms 2024-25 Damaged Site Repair Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
Anthony MooreConstruction Engineer

Full Description

Show more
The County of Sonoma has proposed the 2024-25 storm damage repair project at West Soda Rock Lane (Postmile 12.60), located near Healdsburg, California. The Project will be funded by local funds and undertaken by the Sonoma County Department of Public Infrastructure. The purpose of the Project is to repair the portion of West Soda Rock Lane at approximately PM 12.60 that failed during the 2024-25 storms and flooding. The County proposes to repair approximately 100 feet of roadway along West Soda Rock Lane. The project proposes to construct storm damage slide repair work along West Soda Rock Lane at PM 12.60. The work includes reconstructing the downslope roadway embankment by excavating native soil and establishing subgrade benching, placing rock slope protection and fabric, placing grouted rock slope protection, a fully grouted keyway, and finally reconstructing the roadway structural section of aggregate base and asphalt concrete and other items of work needed to restore the road to a functional condition. The project has 45 working days, which is a construction duration of roughly 2-1/2 months.