Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Winter Storms 2024-25 Damaged Site – West Soda Rock Lane

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Sonoma Department of Public Infrastructure is undertaking the 2024-25 storm damage repair project at West Soda Rock Lane (Postmile 12.60) near Healdsburg, California. Funded by local funds, the project aims to restore approximately 100 feet of roadway that failed during recent storms and flooding. The scope of work includes excavating native soil, establishing subgrade benching, installing rock slope protection with geotextile fabric, placing grouted rock slope protection with a fully grouted keyway, and reconstructing the roadway structural section using aggregate base and asphalt concrete. The project is scheduled for completion within 45 working days, representing a construction duration of approximately two and a half months. It has been granted exemptions under the California Environmental Quality Act (CEQA) for emergency repairs and minor alterations to existing facilities, specifically under sections 15269, 15301, and 15302. Anthony Moore, Construction Engineer, serves as the primary point of contact for the lead agency. The project is focused on restoring the road to a functional condition within the existing right-of-way without expanding the facility's capacity.

General Info

Sonoma County emergency-repairs 100-foot road segment using local funds, no bidding, CEQA exemptions apply.

Agency

California → Sonoma County

Place of Performance

Healdsburg, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
Anthony MooreConstruction Engineer

Full Description

Show more
The County of Sonoma has proposed the 2024-25 storm damage repair project at West Soda Rock Lane (Postmile 12.60), located near Healdsburg, California. The Project will be funded by local funds and undertaken by the Sonoma County Department of Public Infrastructure. The purpose of the Project is to repair the portion of West Soda Rock Lane at approximately PM 12.60 that failed during the 2024-25 storms and flooding. The County proposes to repair approximately 100 feet of roadway along West Soda Rock Lane. The project proposes to construct storm damage slide repair work along West Soda Rock Lane at PM 12.60. The work includes reconstructing the downslope roadway embankment by excavating native soil and establishing subgrade benching, placing rock slope protection and fabric, placing grouted rock slope protection, a fully grouted keyway, and finally reconstructing the roadway structural section of aggregate base and asphalt concrete and other items of work needed to restore the road to a functional condition. The project has 45 working days, which is a construction duration of roughly 2-1/2 months.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
PLEASURE ISLAND PARKING LOT PAVEMENT IMPROVEMENT PROJECT
Solicitation # P27-002
The City of Port Arthur, Texas, is soliciting bids for the Pleasure Island Parking Lot Pavement Improvement Project, which involves the construction of an asphalt parking lot replacement. The project requires the contractor to provide all necessary labor, materials, equipment, and superintendence to deliver the installation in full operating condition. Key deliverables include the installation of electrical conduits, concrete wheel stops, and the digging and grading of drainage swales, as well as ADA-compliant striping and signage. The work must be completed within 90 calendar days, and the award will be based on the time required for completion and the technical standards of the bid. Bidders must provide a bid guarantee of at least five percent and are required to furnish payment and performance bonds if the contract exceeds 50,000 and 100,000 dollars, respectively. The contract is subject to the Davis-Bacon Act and Executive Order 11246 regarding equal employment opportunity. Additionally, respondents must certify that they do not boycott Israel and are not listed on the Texas Comptroller's website as doing business with Iran, Sudan, or foreign terrorist organizations. A five percent retainage will be held from progress payments until final acceptance of all work. Successful bidders must submit a construction schedule within seven calendar days of notice and a detailed progress schedule and cost breakdown within fifteen days of contract execution.
City of Port Arthur

POSTED

about 14 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS