Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WMF Rob Brook Bridge Replacement

Awarded
12445526Q0070Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 10 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 11 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The US Forest Service is soliciting quotations for the reconstruction of the Rob Brook Road Bridge on the White Mountain National Forest under solicitation number 12445526Q0070, a combined synopsis and solicitation issued as a Request for Quotation in accordance with FAR Part 12. This is a total small business set-aside under NAICS code 237310 for Highway, Street, and Bridge Construction, with an estimated contract value between $1,000,000 and $5,000,000. The project involves demolishing the existing 28-foot bridge structure and constructing a new 44-foot bridge using steel stringers reclaimed from a prior forest bridge, concrete abutments and wingwalls supported by micropiles, a timber deck with a wearing surface, and structural components fabricated to specific standards including AASHTO M270 Grade 50W weathering steel, copper naphthenate-treated timber conforming to AWPA UCC4, and epoxy-coated reinforcing steel meeting ASTM A-615. The work is to be completed within 150 days of the Notice to Proceed, with a firm deadline of December 30, 2026, and site activities must comply with FHWA Standard Specifications for Construction of Roads and Bridges, FP-14 Edition. All tree cutting is restricted to the period between August 16th and April 14th. The contractor is responsible for providing all labor, equipment, permits, transportation, and incidental services, and must comply with Davis-Bacon Act wage requirements, Executive Order 13706 for paid sick leave, and Executive Order 13658’s hourly minimum wage of $13.65 for covered workers from May 11 through December 31, 2026. Bond premiums must be included under Line Item 151.01 Mobilization and cannot be billed separately. The contractor must submit detailed plans including safety, traffic control, spill prevention, quality control, and subcontractor lists within ten days of award, and provide weekly certified payroll reports, progress certifications, quantity measurements, and certificates of payment with invoices. Advance written notifications are required for mobilization, site closure, stream impacts, excavation, and structural deliveries, with timelines ranging from 48 hours to 21 days. Materials must meet strict specifications, including aggregate and stone screen reports prior to placement

General Info

RFQ for small business to replace Rob Brook Road Bridge, Campton NH; quotes due July 1, 2026.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Campton, NH, USA

Set-Aside

SBA

Documents

14

Amendment 0001 to Solicitation 1244552600070 for WMF Rob Brook Bridge Replacement

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 12445526Q0070 for WMF Rob Brook Bridge Replacement

PDF, High priority: read this firstamendment
High

C04_1-12445526Q0070-Att5-Specs - Forest Service Construction Specifications FP-14

PDF, High priority: read this firstspecifications
High

C04_1-12445526Q0070 Schedule of Items for WMF Rob Brook Bridge Replacement

XLSX, High priority: read this firstschedule-of-items
High

C04_1-12445526Q0070 Statement of Work for WMF Rob Brook Bridge Replacement

PDF, High priority: read this firstsow
High

C05_1-12445526Q0070 Statement of Work for WMF Rob Brook Bridge Replacement Rev1

PDF, High priority: read this firstsow
High

RFQ 12445526Q0070 Questions & Answers

PDF, High priority: read this firstq-and-a
High

RFQ 12445526Q0070 Questions & Answers

PDF, High priority: read this firstq-and-a
High

Rob Brook Road Bridge Replacement Plans 7-18-2023

PDF, High priority: read this firstspecifications
High

Rob Brook Road Bridge Replacement Plans and Specifications

PDF, High priority: read this firstspecifications
High

Solicitation 12445526Q0070 WMF Rob Brook Bridge Replacement IFB

PDF, High priority: read this firstifb
High

SOW WMF Rob Brook Bridge Replacement Rev2

PDF, High priority: read this firstsow
High

Wage Determination for New Hampshire Highway Construction

PDF, High priority: read this firstwage-determination
High

C04_1-12445526Q0070-Att4-AccessMap.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 1, 2026 to Jul 15, 2026. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa East 13 Usda-Fs
Contacts1 person available
OfficeAtlanta, GA, 303092449, USA
Office AddressAtlanta, GA, 303092449, USA
Contacts
Matthew (Matt) Killian

Full Description

Show more

Q&A Memorandum #2 (Final): Uploaded 9 July 2026
-------------------------------------------------------------------------------


Solicitation Amendment 0002, Issued 30 June 2026, implements the following changes:
 


1) The Period of Performance is revised from "NTP + 150 days" to "NTP + 440 days" and the Period of Performance end date is extended from 30 December 2026 to 10 November 2027



2) The Statement of Work (SOW) is updated via attachment C05_1-12445526Q0070_0002-Att1-SOW_Rev2. This update revises the Period of Performance and incorporates reference and access to the applicable USACE General Permit #23.



3) The QUESTION deadline is extended to 1300 EDT on 06 July 2026



4) The QUOTE due date is extended to 1700 EDT on 15 July 2026



All other solicitation documents, terms, and conditions remain unchanged.


-------------------------------------------------------------------------------
Q&A Memorandum: Uploaded 23 June 2026
-------------------------------------------------------------------------------


Solicitation Amendment 0001, Issued 18 June 2026, implements the following changes:



1) Statement of Work (SOW) is updated via attachment C05_1-12445526Q0070_0001-Att1-SOW_Rev1. The following changes have been made:



"Tree cutting shall only be performed within the following calendar window: November 1 and April 14th"



is revised and replaced with:



"Tree cutting shall only be performed within the following calendar window: Trees shall be cut between August 16th to April 14th."



All other solicitation documents, terms, and conditions remain unchanged..
-------------------------------------------------------------------------------


This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445526Q0070 is issued as a Request for Quotation (RFQ) for WMF Rob Brook Bridge Replacement.



PROJECT SUMMARY: The USFS is pursuing a Purchase Order for the reconstruction of Rob Brook Road Bridge on the White Mountain National Forest. Work includes but is not limited to demolition of the existing 28' bridge structure, proper disposal of all materials, and construction of the new 44' bridge. Services shall be performed by the awardee in accordance with the specifications, terms, and conditions of this solicitation, including those found in the solicitation attachments.



SET-ASIDE: This solicitation is set aside 100% for Small Business entities under NAICS 237310 - Highway, Street, and Bridge Construction (Size Standard: $45M).



PROJECT LOCATION: Saco Ranger District, White Mountain National Forest. See solicitation and its attachments for additional location details.



PROJECT MAGNITUDE: between $1,000,000 and $5,000,000



SOLICITATION POINT OF CONTACT: Matthew (Matt) Killian, Contracting Officer contact@example.gov



PLEASE REVIEW ALL SOLICITATION MATERIALS IN-FULL, INCLUDING ALL INSTRUCTIONS TO OFFERORS, PRIOR TO SUBMITTING A QUOTATION. LATE QUOTATIONS AND/OR QUOTATIONS THAT DO NOT COMPLY WITH SAID INSTRUCTIONS MAY BE DETERMINED NON-REPONSIVE AND ELIMINATED FROM AWARD CONSIDERATION.

More opportunities from Department Of Agriculture → Csa East 13 Usda-Fs

Same awarding agency

NAICS: 238390
New
Federal
Doniphan and Salem Drop Ceilings Installation
Solicitation # 12445527Q0003
Solicitation 12445527Q0003 is a Request for Quotation issued by the USDA Forest Service for the removal and replacement of ceiling tiles at the Salem Ranger District office and the installation of a new ceiling tile and track system at the Eleven Point Ranger District office in Doniphan, Missouri. This acquisition is a total set-aside for small business concerns under NAICS code 238390. The project requires the contractor to provide all labor, materials, and supervision to install metal suspension systems, as PVC and CeilingMAX systems are strictly prohibited. Technical specifications mandate that tiles meet NRC ≥ 0.55 and CAC ≥ 30 ratings, with Class A surface-burning characteristics required for specific areas in Doniphan. The scope also includes the disconnection and reconnection of electrical fixtures and the provision of independent structural support. The contract is a Firm Fixed Price award to be granted to the lowest priced, responsive, and responsible quoter. Performance must commence within 14 calendar days of the notice to proceed, with a total period of performance of 60 calendar days. Contractors must comply with Davis-Bacon Act wage determinations for the applicable Missouri counties and adhere to FAR 52.228-13 payment protections for awards between 35,000 and 150,000 dollars. Key deliverables include the completed ceiling systems and daily progress reports with photographs submitted to the Contracting Officer's Representative. Quotes must be submitted electronically to the designated point of contact by the established deadline, including a signed SF-1442 and a completed Schedule of Items.
Other Building Finishing Contractors

POSTED

6 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS