This Solicitation opportunity from Georgia was posted on April 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Wolffork Valley Water Distribution System Expansion
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Rabun County Water & Sewer Authority is soliciting sealed bids for the expansion of the Wolffork Valley Water Distribution System in Rabun County, Georgia. The project involves two main sections: Section A, which includes the installation of approximately 16,160 linear feet of 8-inch ductile iron pipe, along with associated fire hydrants, gate valves, and related infrastructure; and Section B, which encompasses the construction of roughly 652 linear feet of storm piping, asphalt milling, roadway backfilling, paving, and roadway restoration. Bidders must submit their proposals by 9:00 a.m. on May 14, 2024, at the specified address, with late submissions not considered. The project details specify a comprehensive scope covering water distribution and roadway improvements, requiring contractors to furnish all necessary materials, labor, tools, and equipment. For general inquiries and procurement documents, contact Joyce Sapp, while technical questions should be directed to Zack Bryan. The contract is associated with NAICS code 221320, indicating a focus on water supply and irrigation systems, and is managed by the Georgia-based Rabun County Water & Sewer Authority. The project aims to enhance water infrastructure and roadway conditions within the specified area, with the bidding process open to qualified contractors seeking to contribute to local infrastructure development.
General Info
Agency
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Sealed bids will be received by the Rabun County Water & Sewer Authority, (OWNER), for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of Wolffork Valley Water Distribution System Expansion in Rabun County, Georgia.
Bids will be received at 137 Hiawassee Street, Clayton, GA 30525 until 9:00 a.m. on May 14, 2024. Any bid received after said time and date of bid opening will not be considered by OWNER.
This Project shall consist of two (2) sections, Section A and Section B.
Section A Consists of, but is not limited to the following major elements:
Construction of approximately 16,160 L.F. of 8-inch DIP, 230 L.F. of Jack and Bore, 434 L.F. of Horizontal Directional Drilling, thirty four (34) each fire hydrant assemblies, nineteen (19) each 8-inch gate valves, and related appurtenances.
Section B consists of, but is not limited to the following major elements:
Construction of approximately 652 L.F. of Smooth Lined HDPE Storm Piping, Milling of approximately 15,381 S.Y. of existing asphalt, Backfilling GAB in the 15,381 L.F. waterline trench located in the roadway, installing 15,381 S.Y. of 19mm SuperPave asphalt and roadway striping, 443 L.F. of gravel roadway restoration, and related appurtenances.
For general information and purchasing documents regarding this project, you may call Joyce Sapp at +1 (555) 000-0000 or email contact@example.gov. For technical questions regarding this project, you may call Zack Bryan at +1 (555) 000-0000 or email contact@example.gov
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
