Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wood Post and Cable Barrier Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract entails the installation of modern wood post and cable safety barriers featuring tensioned cables and engineered anchoring systems, designed to meet current safety and performance standards. This work includes the complete removal and disposal of existing outdated barrier systems to ensure a seamless transition to the new infrastructure, with all components properly secured and calibrated for long-term durability and reliability. The project is focused on enhancing roadway safety within the City of Roseville, specifically in the 95747 zip code area, and requires precision in both placement and tensioning to comply with industry-engineered specifications. The contract is classified as a subcontract under NAICS code 238990, with a response deadline of August 5, 2026, and was posted on July 28, 2026. It is procured by the City of Roseville within the state of California, and all work must be performed at the designated location in Roseville. The procurement does not specify a set aside type or organization type, and while no point of contact is listed, interested parties can access further details through the provided BidAmerica link. Contractors must be prepared to handle all logistical, technical, and regulatory requirements associated with demolition, installation, and system integration under tight performance benchmarks.

General Info

Install modern wood post and cable barriers in Roseville, CA, replacing outdated systems by August 5, 2026.

Place of Performance

Roseville, CA, 95747, USA

Set-Aside

NONE

Documents

This scope was carved out of 13-195.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

On-Call Fencing Construction Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Roseville
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of wood post and cable safety barriers with tensioned cables and engineered anchoring, including removal of outdated systems.

More opportunities from California → City of Roseville

Same awarding agency

NAICS: 238210
SLED
Electrical Services
Solicitation # 01-099
The City of Roseville is soliciting proposals from qualified electrical contractors to provide general estimating, maintenance, repair, replacement, installation, design, and engineering services on an as-needed basis. The scope of work includes the maintenance and installation of transformers, backup batteries, underground cables, circuit breakers, outlets, fixtures, appliances, surge suppressors, and security and emergency lighting. All work must be performed by journey-level electricians, adhere to federal, state, and local safety regulations, and comply with the Americans with Disabilities Act. Contractors must hold a C-10 Electrical Contractor license and ensure that all installed equipment matches the brand and grade currently used by the City or an approved equivalent. The contract is for an initial term of one year, with the City reserving the option to renew for up to four additional one-year terms. Award selection is based on a formal evaluation of the firm's experience and qualifications, proposed cost, and overall proposal quality, with potential interviews for top candidates. Proposers must provide a cost proposal detailing hourly rates for standard, overtime, and emergency work, as well as material and subcontractor markups. This is a prevailing wage project requiring a faithful performance bond and a public works labor and materials payment bond. Proposals are due by December 1, 2026, and must include specific certifications, proof of registration with the California Secretary of State, and a non-collusion declaration.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

11 days ago

DEADLINE

in 18 days
View Details
NAICS: 238210
SLED
Roseville Electric Utility - Electrical Maintenance
Solicitation # 07-133
The City of Roseville is soliciting proposals for Electrical Maintenance Services to support its power plant sites, specifically the Roseville Energy Park and the Roseville Sunset Energy Center. The selected contractor will provide qualified personnel, supervision, tools, calibrated test equipment, and technical support to inspect, maintain, test, troubleshoot, repair, and replace electrical equipment. This is a prevailing wage project requiring strict adherence to California safety orders and the provision of all necessary personal protective equipment. The initial contract term is five years with a Not To Exceed amount, allowing for price renegotiations based on market fluctuations or catastrophic events. Proposals are due by December 16, 2026, and will be evaluated based on the firm's experience and qualifications, the proposed project plan, and cost. The successful bidder must provide 100 percent Faithful Performance and Labor and Materials Bonds using City forms. Required submission documents include a Proposer's Certification, Levine Act Disclosure, Non-collusion Declaration, and proof of registration with the California Secretary of State and the Department of Industrial Relations. The contract includes standard provisions for indemnification, independent contractor status, and a 30-day written notice for termination.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

15 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS