Wright Davis Scenic River Land - Gravel Parking Lot Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Place of Performance
OH, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Create cut for entrance off State Route 534 and install appropriately sized culvert to meet ODOT specifications (see PERMITTING).
Install driveway entrance using specs for the gravel parking area. The driveway should be wide enough for two-way traffic and should be curved (slightly widened) in both directions where it ties into State Route 534 to assist drivers entering and exiting with visibility.
Tree removal
The parking area location has been sited to minimize the need for tree clearing. Invasive species such as bush honeysuckle, multiflora rose, privet, and others may be removed. For all standing trees left, damage should be prevented.
NO trees may be removed without prior approval. Trees that are removed may be left on the property within the woods away from the property boundary. Brush should be piled for the benefit of wildlife, and so it does not impede future access to the site.
Grade parking area. Ensure proper drainage. A berm should be created around the parking area to better define the area and prevent loss of gravel. Material from on site should be used for this. A 5’ buffer strip should be left in place on the east side of the ditch.
Install gravel lot. The gravel lot should have space for 10 parked cars. It should have enough room for two-way traffic entering and exiting, with sufficient room to back out of parking spots. The parking area should have a base of geo-textile fabric. Appropriate drainage should be incorporated to prevent ponding on the surface. Gravel should be limestone with 2&3’s on the bottom, then 57’s with 304’s on top. Contractor will design the parking lot configuration or layout and present that to the Assistant Regional Scenic River Manager for approval.
Disposal of materials
All excavated materials should be used in construction of the parking area and the berm. Any debris, including the fence posts and cable shall be disposed of and not left on-site.
Site remediation
Restore and stabilize any disturbed areas to natural contours. Seed all disturbed areas outside of the parking area with a native seed mix appropriate to the site conditions and straw mulch. The seed mix must be approved by the Assistant Regional Scenic River Manager. The mix may be provided by DNAP staff. Repair ruts and other damage on property.
Install new property signage. The Assistant Regional Scenic River Manager will provide the new sign. The contractor should construct a pressure treated wood frame for the sign which will stand on 6x6 inch posts. The configuration should be consistent with the current signage. The appropriate location shall be approved by the Assistant Regional Scenic River Manager.
Permitting and other Action
The contractor will provide all permitting services which may include but is not limited to the following: Right of Entry Needed for access to property. Coordination with ODOT is necessary to tie into State Route 534 and a Curb Cut Permit may be required. Due diligence is required to identify other potential permits, certifications, or permissions needed for the project.
OTHER CONSIDERATIONS Contractor will provide all materials and supplies unless specified otherwise in the Scope of Work. A sediment and erosion control plan shall be implemented including the use of properly entrenched silt fence or other barrier not to include straw bales. A spill prevention plan must be implemented. Equipment must be cleaned prior to entering the site to prevent the spread of invasive species. This includes tires, tread, and tracks. Final Plans shall be submitted for approval prior to starting construction.
TIMELINEWork may begin immediately upon approval of plans by Assistant Regional Scenic River Manager. Project must be completed prior to June 25, 2024. All changes to the timeline for any reason will need to be discussed with the appropriate Assistant Regional Scenic River Manager- Northeast Ohio.CONTACTJeffry HayesAssistant Regional Scenic Rivers Manager-Northeast OhioDivision of Natural Areas and PreservesOhio Department of Natural ResourcesE: contact@example.gov: 614-546-8067Delivery Wright Davis Scenic River Land, State Route 534 and State Rd., Harpersfield Twp., Ashtabula County, OH. Jeffry Hayes, +1 (555) 000-0000, contact@example.gov/Delivery Date: June 25, 2024Site Visit & Point of ContactPrior to submitting a bid response, offerors are encouraged to visit the Wright Davis Scenic River Land on April 10 at 1:00 pm.Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS