Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on July 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WSU Wenatchee Sunrise Orchard Solar Array

Closed
2371-2025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

22 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Board of Regents of Washington State University is soliciting sealed bids for the construction of a 0.5-acre solar array at the Sunrise Research Orchard located at 75 Sunrise Court, Rock Island, WA 98850. The project requires full construction including excavation and foundation placement for the racking system, installation of solar panels according to approved drawings, and extension of electrical lines from the existing transformer to the new array. The system is designed to generate electricity for on-site use or to feed surplus power back into the PUD grid, supporting research objectives. Substantial Completion must be achieved within 250 days of the Notice to Proceed, and all bids must be structured around this timeline. The estimated project cost ranges between $1,000,000 and $1,200,000, with a single optional alternate to install an additional solar array over an existing orchard area on site. Bids are due by 2:00 p.m. on August 6, 2026, followed by a virtual bid opening at 2:30 p.m. the same day. A non-mandatory virtual pre-bid meeting is scheduled for July 22, 2026, at 10:00 a.m. via Zoom, and a non-mandatory site walk will occur on July 27, 2026, at 11:30 a.m. The solicitation number is 2371-2025, posted on July 11, 2026, and all proposals must be submitted through the designated public purchase portal. Primary point of contact for inquiries is Craig Cole, reachable at [phone hidden] or [email hidden]. This procurement is categorized as a state-level education solicitation under Washington State University’s authority.

General Info

Construct 0.5-acre solar array at Rock Island, WA, within 250 days, budget $1M–$1.2M, bid due August 6, 2026.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

11

Advertisement for Bid 2371-2025 Solar Array Construction WSU Wenatchee

PDF, High priority: read this firstifb
High

Form of Proposal - Part B for WSU Wenatchee Sunrise Orchard Solar Array

PDF, High priority: read this firstform-of-proposal-part-b
High

WSU Wenatchee Sunrise Orchard Solar Array Form of Proposal - Part A

PDF, High priority: read this firstform-of-proposal
High

WSU Wenatchee Sunrise Orchard Solar Array Project Manual 2371-2025

PDF, High priority: read this firstproject-manual
High

Drawings_2 - WSU Wenatchee Sunrise Orchard Solar Array Civil 100

PDF, Low priorityother
Low

Drawings_4 - WSU Wenatchee Sunrise Orchard Solar Array Structural

PDF, Low priorityother
Low

WSU Wenatchee Sunrise Orchard Solar Array Electrical Drawings

PDF, Low prioritydrawings
Low

Bid Bond Response Information Form

OCTET-STREAM

Bid Bond Response Information Form

OCTET-STREAM

Drawings_1 - COVER SHEET.pdf

PDF

Drawings_5 - WSU Sunrise Orchard - Solar Array - Micropile Design Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington State University
Contacts1 person available
OfficeN/A
Organization / AgencyWashington State University
Office AddressN/A

Full Description

Show more
Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: Construct a solar array at WSU TFREC’s Sunrise Research Orchard. The array will be approximately 0.5 acres in size. Scope includes the necessary excavation and placement of foundations for the racking system. Construct the racking system and install solar panels per the construction drawings. Extend the electrical lines from the transformer up to the new location and install all the equipment indicated. The purpose will be to generate power from the panels and either use the electricity on site, or back-feed the electricity into the PUD power grid and conduct the desired research. Substantial Completion shall be achieved 250 days following Notice to Proceed. Proposals MUST BE based on this Contract Time. Project Physical address: 75 Sunrise Court, Rock Island, WA 98850 Bid Estimate: $1,000,000.00 to $1, 200,000.00 Alternate No.1 There will be a single alternate to add another solar array area over an existing orchard on site. Bid Deadline: August 6, 2026, prior to 2:00 p.m., virtual bid opening at 2:30 p.m. Non-Mandatory Virtual Pre-Bid Meeting: July 22, 2026, at 10:00 a.m., via zoom. Non-Mandatory Site Walk: July 27, 2026, at 11:30 a.m.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS