WSU Wenatchee Sunrise Orchard Solar Array

Closed
2371-2025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, maintain, and decommission a solar generating facility at the Royalston Landfill, located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility size between 1 and 6 MW AC, with the potential for battery energy storage systems. The Town aims to establish a long-term agreement, not to exceed 30 years, through a site lease, Power Purchase Agreements, or other financial structures that provide revenue, energy savings, and host community benefits. Proposals are due by October 8, 2026, and must include a conceptual site plan, a detailed project schedule, and a financial structure. The selection process will be based on the most advantageous proposal, weighing price and qualifications, including technical and management capacity, past performance on similar projects, and the merits of the proposed plan of services. Key requirements include the appointment of a primary staff member registered as a Massachusetts Professional Engineer (Civil) for at least 10 years and a project history of at least three similar completed projects. Developers are responsible for all permitting, utility interconnection risks, and the protection of the landfill cap and forest resources. Mandatory submissions include comprehensive certifications regarding non-collusion, tax compliance, and non-discrimination, as well as the provision of decommissioning financial security and significant insurance coverage, including at least 5 million dollars in commercial general liability.
TORTH - Town of Royalston - Town Hall

POSTED

2 days ago

DEADLINE

in 26 days
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-132882
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, finance, construct, operate, and decommission a Solar Generating Facility (SGF) at the Royalston Landfill, located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility capacity between 1 and 6 MW AC, with the Town specifically open to proposals up to 5 MW AC and the potential inclusion of Battery Energy Storage Systems (BESS). The objective is to establish a long-term agreement, not to exceed 30 years, through a land lease, Power Purchase Agreement (PPA), or other financial structures that provide sustainable revenue, energy savings, and financial benefits to the Town. The selected developer will be responsible for all project-related costs, including permitting, interconnection, and maintenance, while ensuring the integrity of the landfill cap in accordance with Massachusetts Department of Environmental Protection (MassDEP) regulations. Key requirements include the submission of a conceptual site plan, an independent timber appraisal by a Massachusetts Licensed Forester, and the provision of decommissioning financial security via a surety bond or letter of credit. Proposals are evaluated based on a combination of price, technical and management capacity, past performance, and the expertise of key personnel, including a requirement for a primary staff member to be a registered Massachusetts Professional Engineer (Civil) with at least 10 years of experience. The deadline for submission is October 8, 2026, at 12:00 PM EST.
TORTH - Town of Royalston - Town Hall

POSTED

16 days ago

DEADLINE

in 26 days
NAICS: 221114
SLED
City Owned Solar Development – Brand LandfillThe City of Glendale and Glendale Water & Power are implementing the Brand Park Solar Photovoltaic System Project, which involves the construction and operation of a city-owned 1.815 megawatt ground-mount solar system. The project is located on a 2.1 acre portion of a 219 acre parcel at 1601 West Mountain Street in Glendale, California, situated within Pomeroy Canyon and the southern Verdugo Mountains. The installation will be placed on a manufactured flat pad of an inactive landfill, requiring only minor site preparation and leveling without significant grading. The infrastructure consists of 3,300 ground-mounted PV panels, transformers, inverters, and combiner panels reaching heights of approximately 6 feet 6 inches, with electrical distribution lines installed on new wood utility poles along existing access roads. The project is categorized as exempt from the California Environmental Quality Act under CEQA Guidelines Sections 15303 and 15304. To ensure environmental compliance and the protection of biological resources, the project requires adherence to a Biological Resources Assessment prepared by TRC. Mandatory pre-construction surveys must be completed before building permits are issued and construction begins, specifically targeting nesting birds, raptors, the Least Bell's vireo, special status wildlife, Crotch's Bumble Bee, and the Western Spadefoot Toad. The project is managed by the City of Glendale with primary coordination through the Principal Planner and Business Transformation Manager.
City of Glendale

POSTED

17 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Santa Barbara Community College District Solar Power Array & Battery Energy Storage System MicrogridThe Santa Barbara Community College District is implementing a solar power array and battery energy storage system microgrid at the Cliff Campus in Santa Barbara, California. This project involves the installation of 1.6 megawatts of carport-mounted solar arrays, battery energy storage systems, transformers, inverters, and related electrical infrastructure. The work will be concentrated within existing parking facilities on the East and West Campuses, specifically targeting Parking Lots 1A, 1B, 4A, 4B, 4C, and 4D. The primary objectives of the installation are to provide 8 to 24 plus hours of energy resilience, reduce the district's carbon footprint, and lower long-term energy costs through renewable energy generation. The Board of Trustees of Santa Barbara City College has determined that the project is exempt from the California Environmental Quality Act pursuant to Categorical Exemption Class 1 for Existing Facilities, as the project occurs within previously developed areas with no expansion of use or new land disturbance. Project administration is managed by the Santa Barbara Community College District, with key coordination involving Rachel Hollander and Chris Renbarger. The project is classified under NAICS code 221114 and was formally documented via a Notice of Exemption dated June 4, 2026.
Santa Barbara Community College District

POSTED

17 days ago

DEADLINE

N/A

AI Contract Overview

Show more

The Board of Regents of Washington State University is soliciting sealed bids for the construction of a 0.5-acre solar array at the Sunrise Research Orchard located at 75 Sunrise Court, Rock Island, WA 98850. The project requires full construction including excavation and foundation placement for the racking system, installation of solar panels according to approved drawings, and extension of electrical lines from the existing transformer to the new array. The system is designed to generate electricity for on-site use or to feed surplus power back into the PUD grid, supporting research objectives. Substantial Completion must be achieved within 250 days of the Notice to Proceed, and all bids must be structured around this timeline. The estimated project cost ranges between $1,000,000 and $1,200,000, with a single optional alternate to install an additional solar array over an existing orchard area on site. Bids are due by 2:00 p.m. on August 6, 2026, followed by a virtual bid opening at 2:30 p.m. the same day. A non-mandatory virtual pre-bid meeting is scheduled for July 22, 2026, at 10:00 a.m. via Zoom, and a non-mandatory site walk will occur on July 27, 2026, at 11:30 a.m. The solicitation number is 2371-2025, posted on July 11, 2026, and all proposals must be submitted through the designated public purchase portal. Primary point of contact for inquiries is Craig Cole, reachable at (509) 335-9035 or craig.cole@wsu.edu. This procurement is categorized as a state-level education solicitation under Washington State University’s authority.

General Info

Construct 0.5-acre solar array at Rock Island, WA, within 250 days, budget $1M–$1.2M, bid due August 6, 2026.

Agency

Washington State UniversityView Agency

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

(11)

Advertisement for Bid 2371-2025 Solar Array Construction WSU Wenatchee

PDFifb

Drawings_2 - WSU Wenatchee Sunrise Orchard Solar Array Civil 100

PDFother

Bid Bond Response Information Form

OCTET-STREAM

Drawings_4 - WSU Wenatchee Sunrise Orchard Solar Array Structural

PDFother

WSU Wenatchee Sunrise Orchard Solar Array Project Manual 2371-2025

PDFproject-manual

Drawings_5 - WSU Sunrise Orchard - Solar Array - Micropile Design Drawings.pdf

PDF

WSU Wenatchee Sunrise Orchard Solar Array Electrical Drawings

PDFdrawings

WSU Wenatchee Sunrise Orchard Solar Array Form of Proposal - Part A

PDFform-of-proposal

Bid Bond Response Information Form

OCTET-STREAM

Form of Proposal - Part B for WSU Wenatchee Sunrise Orchard Solar Array

PDFform-of-proposal-part-b

Drawings_1 - COVER SHEET.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington State University
Contacts1 person available
OfficeN/A
Organization / Agency
Washington State University
View Agency Profile
Office AddressN/A

Full Description

Show more
Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: Construct a solar array at WSU TFREC’s Sunrise Research Orchard. The array will be approximately 0.5 acres in size. Scope includes the necessary excavation and placement of foundations for the racking system. Construct the racking system and install solar panels per the construction drawings. Extend the electrical lines from the transformer up to the new location and install all the equipment indicated. The purpose will be to generate power from the panels and either use the electricity on site, or back-feed the electricity into the PUD power grid and conduct the desired research. Substantial Completion shall be achieved 250 days following Notice to Proceed. Proposals MUST BE based on this Contract Time. Project Physical address: 75 Sunrise Court, Rock Island, WA 98850 Bid Estimate: $1,000,000.00 to $1, 200,000.00 Alternate No.1 There will be a single alternate to add another solar array area over an existing orchard on site. Bid Deadline: August 6, 2026, prior to 2:00 p.m., virtual bid opening at 2:30 p.m. Non-Mandatory Virtual Pre-Bid Meeting: July 22, 2026, at 10:00 a.m., via zoom. Non-Mandatory Site Walk: July 27, 2026, at 11:30 a.m.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS