Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 26, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Construct Canton Dam Auxiliary Spillway at Canton, Oklahoma.

Awarded
W912BV-14-R-0039Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 12 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Auxiliary Spillway Channel Excavation Phase II project at Canton Lake, Oklahoma, is a Design-Bid-Build construction effort focused on removing the soil plug to enable lake flows into the new auxiliary spillway. The scope of work includes excavating and reshaping sections of the dam embankment, placing rock spalls, bedding, and rip rap, and constructing cast-in-place reinforced concrete diaphragm walls using the polymer slurry-trench method. These walls will be stabilized with post-tensioned high-strength steel anchors. To facilitate these installations, the contractor must construct a cofferdam and lateral support berm while managing necessary dewatering for deep-hole and near-lake excavations. Additional requirements include modifying or installing dam safety instrumentation, such as toe drain systems, and applying grass to soil plug disposal locations. Final excavation must be verified via survey to ensure adherence to specified tolerances. This unrestricted contract, identified by NAICS code 237990 and FSC Y1KA, has an estimated value between 25 million and 50 million dollars. While there are no small business set-asides, a small business subcontracting plan is required prior to the award.

General Info

Contract Value

$29,834,565.1

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

OK

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Apr 30, 2014 to May 6, 2014. The notice description changed.

Deadline changed

Response deadline changed from May 6, 2014 to May 15, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Tulsa
ContactsNo contacts available
OfficeTULSA, OK, 74137-4290, USA
Office AddressTULSA, OK, 74137-4290, USA
ContactsNo contact information available

Full Description

Show more
The Auxiliary Spillway Channel Excavation Phase II project at Canton Lake, Oklahoma removes the remaining soil plug that prevents lake flows into the new auxiliary spillway (currently under construction). This is a fully-designed construction project (Design-Bid-Build) and will be solicited as a single phase Request for Proposal (RFP). Work also required excavating and/or re-shaping some sections of the existing dam embankment (both lake side and downstream side). Rock spalls, bedding, and rip rap placement on both embankment and channel slopes is required. Diaphragm walls shall be constructed to tie original (primary) spillway walls to the new auxiliary spillway walls. The diaphragm walls will be cast-in-place, reinforced concrete walls by slurry-trench method using polymer slurry. The diaphragm wall will be stabilized by post-tensioned anchors composed of high strength pre-stressing steel strands. Anchors shall be drilled through soil or rock and grouted in place. A cofferdam (potentially between 13 to 21 feet high) and lateral support berm (approximately 35 feet high) shall be constructed to support the diaphragm wall tie-in. Appropriate dewatering efforts for deep-hole and near-lake excavations will be necessary. Dam safety instrumentation such as toe drain systems shall be modified and/or installed as specified in the contract documents. Disposal locations of soil plug material will need grass applications as specified within the contract documents. When the soil plug removal is complete, a survey shall be used to verify excavation is complete within acceptable tolerances, per the contract documents. This project will be solicited as quote mark unrestricted quote mark with no small business set-asides: a small business subcontracting plan will be required prior to award. The applicable NAICS code is 237990. Range of magnitude is $25M-$50M. The product service code (FSC) is Y1KA.

More opportunities from Department Of Defense → W076 Endist Tulsa

Same awarding agency

NAICS: 237990
New
Federal
Webbers Falls Excitation System Replacements
Solicitation # W912BV26RA029
Solicitation W912BV26RA029 is a Request for Proposal issued by the Department of Defense, specifically the US Army Corps of Engineers Tulsa District, for the design and installation of three excitation systems at the Webbers Falls Powerhouse in Oklahoma. The project scope includes the demolition of existing equipment and the supply of three identical full inverting potential source rectifier exciters, each featuring a rectifier assembly, a power potential transformer, and microprocessor digital controllers capable of operating in high humidity and temperatures up to 40 degrees Celsius. Key deliverables include the hardware, comprehensive O&M data packages, field test reports, spare parts, and training for maintenance personnel. The performance period is 300 calendar days from the date of the notice to proceed. This is a partial small business set-aside under NAICS code 237990. Proposals are evaluated on an acceptable or unacceptable basis across three factors: past performance (requiring experience in specific categories within the last five years), a detailed work plan and schedule, and minimum small business participation percentages, including 16 percent aggregate and 11 percent for small disadvantaged businesses. The contract requires strict adherence to electrical and safety standards such as NFPA 70 and IEEE C2, as well as military standards for shipment and storage. Additionally, the prime contractor must possess a Facility Clearance, and personnel must comply with DoD 8570.01-M training and cybersecurity requirements. Payment requests are to be processed electronically via Wide Area WorkFlow.
Other Heavy and Civil Engineering Construction

POSTED

about 17 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS