Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on December 30, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--BLM-CO Gunnison Gorge Recreation Site Improvements

Awarded
140L5422Q0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

General Info

Contract Value

$185,338.5

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

13

Attachment_1_-_Plans_1.pdf

PDF

Attachment_1_-_Plans.pdf

PDF

Attachment_2_-_Specifications_1.pdf

PDF

Attachment_2_-_Specifications.pdf

PDF

Attachment_3_-_Bid_Schedule_1.pdf

PDF

Attachment_3_-_Bid_Schedule.pdf

PDF

Attachment_4_-_Wage_Determination.pdf

PDF

Attachment_5_-_Pre-Bid_Records_0001.pdf

PDF

Attachment_6_-_Questions_and_Anwers_0002.pdf

PDF

Attachment_7_-_Plans_Clarification_0002.pdf

PDF

Sol_140L5422Q0001_Amd_0001.pdf

PDF

Sol_140L5422Q0001_Amd_0002.pdf

PDF

Sol_140L5422Q0001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Southwest District Office
Contacts1 person available
OfficeMONTROSE, CO, 81401, USA
Office AddressMONTROSE, CO, 81401, USA

Full Description

Show more
BLM-CO Gunnison Gorge Recreation Site Improvements This is a presolicitation synopsis for recreation site improvements in accordance with the attachments. Note, the required NEPA clearance is not yet complete, but we expect it will be soon. The project is fully funded. The Government estimates the rough order of magnitude for this project to be between $100,000 - $250,000. PROJECT DESCRIPTION: The work includes, but is not limited to; road maintenance and reconstruction, earthwork, parking expansion, installation of picnic tables, fire rings, tent pads, bollards, repainting existing cabanas, and construction of a cabana. LOCATION: The project is located about 15 miles east of Delta, CO. The work is distributed at three different existing recreation areas located within the Gunnison Gorge National Recreation Area. Pre-Bid Site Tour: A hosted pre-bid site tour is scheduled for 30 November at 10:00. Meet at the Gunnison Forks Recreation Area. We will start there and travel to two other nearby sites. PROJECT DESCRIPTION: The work includes, but is not limited to; road maintenance and reconstruction, earthwork, parking expansion, installation of picnic tables, fire rings, tent pads, bollards, repainting existing cabanas, and construction of a cabana. LOCATION: The project is located about 15 miles east of Delta, CO. The work is distributed at three different existing recreation areas located within the Gunnison Gorge National Recreation Area. Basic Contracting Requirements: 1. Active Registration - www.sam 2. Invoicing and Payment - www.ipp.gov - 14 Day Prompt Pay 3. FAR Part 36 - Construction Provisions and Clauses 4. FAR Part 13 - Simplified Acquisition Procedures 5. Davis-Bacon Act Wage Requirements for Mesa County 6. Bonding - Bid (20% of total bid), Performance and Payment 7. Possibility of new COVID-19 Safety Protocols - https://www.saferfederalworkforce.gov/ 8. Total Small Business Set -Aside for NAICS 237990 - Size Standard: $39.5M 9. Award Basis - Low Price Technically Acceptable with a through review of your technical response. Note: For a sufficient technical response, you must provide a detailed and tailored plan addressing this specific project which lists your resources, equipment, personnel, recent and relevant past performance, plan of operations, supervision plan, safety plan, etc. A simple recap of the SOW or blanket statement of "will comply with SOW" is not adequate and will most likely be deemed "not technically acceptable". It does not need to be long or fancy, just needs to adequately explain your plan. POC: Contracting Officer Robert Hall - contact@example.gov - +1 (555) 000-0000

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS