Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 28, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Demolition of Pier 360 Solomons,Demolition of Fuel Pier 51 NAS Patuxent River

Awarded
N4008013R3019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the Pennsauken Community Pool Improvements project, solicitation number 2026-BID-15. The scope of work involves the rehabilitation, construction, and general improvement of the community pool, including site clearing, reinforced concrete flooring and wall construction, sandblasting the pool interior, and the installation of shade structures and electrical conduits. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction and comply with the Americans with Disabilities Act of 1990. The contract will be awarded to the lowest qualified responsible bidder. Bids must be submitted electronically via the OpenGov Procurement Portal. Per Addendum #01, the submission deadline is November 10, 2026, at 10:30 AM, and submissions must include a signed Acknowledgment of Receipt of Changes. Required documentation includes a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, and a Public Works Contractor Registration Certificate. The contract period is one year, with a possible one-year extension. Awarded contractors must comply with the New Jersey Prevailing Wage Act, mandatory affirmative action language, and provide a two-year maintenance bond. Payment is processed through the Township's governing body meeting cycle, contingent upon the submission of certified payrolls and itemized invoices.
Procurement

POSTED

about 12 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by Volusia County, Florida, to restore beach access at Seaview Avenue in Daytona Beach following destruction by Hurricane Ian. The project scope includes the demolition of damaged infrastructure and the construction of a new reinforced and unreinforced concrete vehicular ramp, a pedestrian sidewalk, curbing, and a composite sheet pile bulkhead with a concrete cap. The estimated construction cost is 1,213,413.00 dollars, with bids due electronically by November 5, 2026. Award will be granted to the lowest responsive and responsible bidder based on price, verified references, and demonstrated experience with similar projects. The project is subject to strict regulatory and technical requirements, including a Florida Department of Environmental Protection coastal construction permit that mandates specific protections for turtle nesting and lighting restrictions. Contractors must comply with FDOT traffic control standards, OSHA safety regulations, and federal provisions including the Davis-Bacon Act and E-Verify. Required deliverables include a payment and performance bond, comprehensive insurance coverage, and an as-built survey. Contract administration involves a 30-day payment cycle for undisputed invoices and a specific sales tax exemption procedure for materials. The County maintains the right to inspect all finished work, providing the contractor 20 days to remedy any punch list items before final acceptance.
Coastal

POSTED

about 13 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This contract, issued by Navfacsyscom Washington, requires the contractor to perform the complete demolition and debris removal of Pier 360. The scope of work includes the mobilization of a crane barge, debris barge, tug or pusher boat, and necessary personnel. To protect the environment, the contractor must deploy a turbidity curtain that extends to the river bottom to enclose the demolition area. Key tasks involve removing security fencing, mooring hardware, utility conduits, the pier deck, and all piles. While most piles must be fully extracted, those damaged by fire or age may be cut at the mud line. The concrete bulkhead and five square concrete encasements are to be abandoned in place. The project incorporates strict verification and site security measures. The contractor must conduct both pre-demolition and post-demolition side scan sonar surveys, followed by a dive inspection to verify the removal of debris. Upon completion, a permanent barrier must be constructed across the pier access road to restrict vehicle access to the shoreline. Additionally, the contractor is required to provide a pre-priced option for five extra days of debris removal should the final surveys indicate that further cleanup is necessary.

General Info

Contract Value

$2,555,479

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

DC, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Washington
ContactsNo contacts available
OfficeWASHINGTON NAVY YARD, DC, 20374-5018, USA
Office AddressWASHINGTON NAVY YARD, DC, 20374-5018, USA
ContactsNo contact information available

Full Description

Show more
The Contractor shall mobilize a crane barge, debris barge, tug/pusher boat, and personnel and other necessary equipment, of sufficient capacities and quantities to perform the demolition of Pier 360 and subsequent removal and disposal of the associated debris. On site mobilization shall include deployment of a turbidity curtain. This curtain shall be installed in such a fashion as to enclose areas to be demolished and extend vertically in the water column to make full contact with the river bottom. 4.1.2. Pier Demolition The demolition of Pier 360 shall include the following: 1. Conduct a pre-demolition side scan sonar survey of the pier footprint. a. The Contractor shall perform this survey as a means of determining the general location and quantity of debris that may reside beneath Pier 360. Hardcopies of pertinent side scan images shall be provided to the Government in 8 ½ by 11 inch format within 3 working days of completing the side scan sonar survey. 2. Remove and dispose of existing security fence. 3. Place a temporary security fence across opening to Pier 360 to prevent unauthorized access to the work site. 4. Removal of the pier mooring hardware that includes fourteen double-bitt bollards and twelve cleats. 5. Removal of all loose metals and debris currently residing on the pier. 6. Cut, remove, and disposal of all utility conduits, cabling, piping, light poles, and utility boxes on the pier. The utility lines shall be severed at the pier/shoreline interface (Section J, Attachment E, Photos 8 and 10). The Contractor is directed to remove these utilities with minimal disturbance to the shoreline. 7. Removal of the pier deck, curbs, wales, deck stringers, cross bracings, and pile caps. 8. Removal of all piles that include vertical, batter, and fender piles. Piles shall be fully extracted from the bottom. Due to the severe condition of a number of bearing and fender piles, resulting from fire damage and age deterioration, it is anticipated that the contractor will not be able to successfully remove these piles by vibratory hammer or straight pull methods. In such cases the contractor will cut the piles at the existing mud line. 9. Concrete bulkhead and encasements. a. The pier is anchored to the shoreline by a concrete bulkhead and a series of five 18-inch square concrete encasements. The bulkhead and encasements shall be abandon in place. 10. Remove all pier related debris along the adjacent shoreline. 11. Conduct a post-demolition side scan sonar survey of the pier footprint. a. The Contractor shall perform this survey as a means of determining the general location and quantity of any large pieces of debris that may remain in the Pier 360 footprint. Hardcopies of pertinent side scan images shall be provided to the Government in 8 ½ by 11 inch format within 3 working days of completing the side scan sonar survey. Upon review of the survey results by the Government, discussions will be held with the Contractor to determine if further debris removal efforts are required. 12. Conduct a post-demolition dive inspection survey of the pier footprint. a. The Contractor shall perform a dive survey of the demolition site to ground-truth data obtained from the side scan sonar survey. 13. Construct a permanent barrier across the pier access road. a. The Contractor shall submit a proposal to the Contracting Officer recommending an appropriate barrier to permanently restrict vehicle access to the shoreline at the location of the pier/shoreline interface (Section J, Attachment E, Photo 11). b. This barrier will be erected upon completion of the demolition work. 14. The Contractor will provide to the Government, as part of their contract cost proposal, a pre-priced option for 5 additional days of debris removal time. This option addresses the potential for further debris removal efforts following the final side scan sonar survey. 4.1.3. Containment of Demolition Debris As mentioned in 4.1.1., above, the Contractor shall utilize a silt curtain throughout the course of this demolition project. The silt curtain will be allowed to enclose only a portion of the work site, but must be of sufficient depth to remain in contact with the river bottom at all times.

More opportunities from Department Of Defense → Navfacsyscom Washington

Same awarding agency

NAICS: 221122
New
Federal
Notice of Intent to Sole Source – NSA Annapolis, Maryland UESC
Solicitation # N40080-27-R-9901
The Naval Facilities Engineering Systems Command intends to award a Utility Energy Service Contract to Baltimore Gas and Electric Company for an energy resilience project at Naval Support Activity Annapolis, Maryland. Estimated at 45 million dollars, the project involves the design, construction, and financing of a Combined Heat and Power cogeneration plant and an integrated microgrid capable of island-mode operation. Key technical components include three natural gas-fired turbines supporting a 19 MW peak electrical demand, an absorption chiller at the Lejeune Chilled Water Plant, the relocation of the 13C-1 electrical substation, and necessary natural gas and electric grid infrastructure upgrades. The government is pursuing a sole-source procurement because Baltimore Gas and Electric Company is the franchised utility provider with the necessary legal authority and control over the existing infrastructure required for the project. While the government has identified this firm as the only responsible source, it is accepting capability statements from other qualified entities until November 10, 2026. To be considered, respondents must demonstrate the legal authority to provide utility services to the installation, the ability to execute infrastructure modifications, and the capacity to provide the required project financing.
Electric Power Distribution

POSTED

4 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS