Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 20, 2005. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Replace Military Family Housing, Phase 11, Project Number QJVF059001R1, Minot AFB, ND

Awarded
W9128F-05-R-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236115
New
26-139 Panic Hardware Installation & correcting egress door swing
Solicitation # 26-139
Solicitation 26-139 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates, Inc. to correct non-compliant door swing and clearance conditions at four electrical rooms in Edinburgh, Indiana. The project requires the removal and reinstallation of commercial door leaves, frames, and hinges to ensure doors swing outward in the direction of egress, preventing encroachment into corridors and maintaining required electrical working clearances. The contractor must furnish and install listed panic hardware allowing one-motion emergency exit and perform all necessary patching and finishing to match adjacent surfaces. All work must adhere to NFPA 101 Life Safety Code, NFPA 70 National Electrical Code 2020, and local Indiana building and fire codes. Proposals must be submitted as a single lump sum contract with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Mandatory requirements for bidders include attending a site visit on November 4, 2026, providing a valid Indiana Contractor's License, and certifying compliance with Davis Bacon Act wage rates. The successful contractor must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Work must commence within 14 days of the Notice to Proceed, and final acceptance is contingent upon a substantial completion walk-through and the submission of certified payroll records and a completed SF 1413.
Atterbury Job Corps. – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 236115
New
SLED
F&W, Residential House, Resident Fish Hatchery - Sturgeon
Solicitation # RFP-Template_format_fixed_CCT_Sturgeon-Residence-10-1-2026-xbmk.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for the design, site development, and construction of a move-in-ready residence at the Sturgeon Fish Hatchery site in Bridgeport, Washington. The project entails the creation of a code-compliant, one-story dwelling of approximately 1,598 square feet featuring three bedrooms, two bathrooms, and an attached two-car garage. The contractor is responsible for all labor, engineering, permits, and utilities, with the Teton floor plan by Adair Homes serving as the design reference. Proposals must be submitted by 3:00 p.m. PST on October 30, 2026, and must include a detailed cost proposal, a realistic project schedule, and a statement of qualifications. Award selection is based on a criteria evaluation process that considers total proposed cost, personnel qualifications, project understanding, experience, and Tribal Employment Rights Office (TERO) preferences. Preference is heavily weighted toward Colville Business Enterprises, and a responsible Indian Offeror may be awarded the contract if their price is within 10 percent of the lowest non-Indian offer. Financial requirements include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Final acceptance of the project requires a certificate of occupancy, completion of all punch-list items, and the provision of warranties and owner training.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in about 21 hours

General Info

Contract Value

$38,917,881

NAICS

236115 - New Single-Family Housing Construction (except For-Sale Builders)

Place of Performance

NE

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jan 19, 2005 to Feb 9, 2005. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
ContactsNo contact information available

Full Description

Show more
On or about 01 December 2004, the Omaha District Corps of Engineers will issue a Request for Proposal (RFP) for the Design/Build of REPLACE MILITARY FAMILY HOUSING, PHASE 11-12, MINOT AFB, NORTH DAKOTA. Proposals will be received on or about 19 Janu ary 2005. This solicitation is unrestricted and open to both large and small business participation. Site Visit/Pre-Proposal Conference A site visit and Pre-Proposal conference will be held at Minot AFB on 16 December 2004 from 9:00 a.m. until 12:00 noon. Assembly will take place in the DG Room of the Jimmy Dolittle Center. The conference will begin promptly at 9:00 a.m. addressing proje ct questions and discussion and last until 10:30 a.m. The site visit is scheduled from 10:30 a.m. until 12:00 noon. For information on base access and scheduling your Pre-Proposal visit, contact the following: Minot AFB Project Office, U.S. Army Corps of E ngineers, Telephone: +1 (555) 000-0000. FAX +1 (555) 000-0000. DO NOT submit requests for plans and specifications to the site visit personnel listed above. See Ordering below. Phase 11-12 Work (Approx. quantities) The FY05, Phase 11 work consists of demolition of 168 existing housing units and replacing with 142 new units. FY06, Phase 12 work consists of demolition of 332 existing housing units and replacing with 223 new units. New units shall be duplex configurat ion for JNCO and SNCO grades. FGO and SOQ units shall be detached single-family dwellings. Design and construction consists of grade mixes of SNCO, FGO and SOQ three and four bedroom units throughout Phase 11. Phase 12 mix is JNCO and FGO units consistin g of 2-bedroom plus, three and four bedroom units. Infrastructure work includes utility upgrades, road improvements, playgrounds, landscaping, etc. All units will require double-car garages, central air conditioning, refrigerators, garbage disposals, dis hwashers, water heaters, range/ovens, automatic garage door openers, carbon monoxide detectors and smoke detectors. RFP Evaluation Firms participating in the RFP will submit technical requirements in accordance with Section 00110: PROPOSAL SUBMISSION AND EVALUATION. Submissions will be evaluated based on the best value approach considering technical elements for evaluation (e.g., Expe rience, Past Performance, Project Management, Concept Design (Housing and Site), Utilization of Small Business, and Price. An adjectival method of evaluation will be used to evaluate the technical factors. Price will be comparatively evaluated for reason ableness. The estimated combined construction cost of Phases 11 and 12 is between $60,000,000 and $80,000,000. Phase 11 will be the base award and Phase 12 will be an option. Contractor's Quality Control will be a requirement in this contract. Large business concerns submitting bids for services exceeding $500,000 or for construction exceeding $1,000,000, shall comply with Federal Acquisition Regulation 52.219-9 regarding the requirement for a subcontracting plan. The U.S. Army Corps of Enginee rs considers the following goals reasonable and achievable for fiscal year 2005: (a) Small Business: 50.9% of planned subcontracting dollars. (b) Small Disadvantaged Business: 8.8% of planned subcontracting dollars*. (c) Women Owned Small Business: 7.2% of planned subcontracting dollars*. (d) Service-Disabled Veterans: 0.5% of planned subcontracting dollars*. (e) Hubzones: 2.9% of planned subcontracting dollars*. *- Small business concerns owned and controlled by. The selected Offeror will be required to commence work 10 days after notice to proceed is given and complete the work within the Offerors proposed schedule for the contract. Offerors Schedule will include all design, design reviews, and construction com pletion. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and pa yment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. The RFP documents are available on Compact Disk (CD-ROM) and will be provided free of charge. It has been determined that the number of Compact Disks be limited to one (1) per firm. Plans and Specifications will not be provided in a printed hard copy forma t. Contractors may view and/or download this project from the Internet at the following Internet address: http://ebs-nwo.wes.army.mil/] Ordering of RFP on CD-ROM shall be by registering on the Omaha District website: http://ebs-nwo.wes.army.mil/. To register on the Omaha District website, go to the Solicitation Registration section of the synopsis and click on the link for Registering. If any of the information changes during the advertisement period, you must make changes through the Omaha District web address. Failure to provide the above information and any changes may cause a delay in receiving CD-ROM and amendments. Questions rega rding the ordering of the same should be made to: +1 (555) 000-0000. Telephone calls regarding Small Business matters should be made to: +1 (555) 000-0000. Telephone calls on contents of the RFP should be made to the Project Manager at: +1 (555) 000-0000 or Specifica tion Section at: +1 (555) 000-0000. Commander U.S. Army Engineer District, Omaha ATTENTION: CENWO-CT-M 106 South 15th Street Omaha, NE 68102 1618

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a total small business set-aside for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The project focuses on facilities G7140 and H7140 and is structured as a firm-fixed-price contract with a final delivery deadline of March 20, 2027. The scope of work requires a certified API 653 inspector to conduct external inspections, visual assessments of containment areas, and verification of alarms and Automatic Tank Gauge equipment. Deliverables include a teleconference kick-off meeting, completed API Std 653 checklists, and the submission of draft and final reports that identify any appurtenances not complying with DoD Standard AW 78-24-27. The government will award the contract to the responsible offeror deemed most advantageous based on technical capability, experience, and price reasonableness. Proposals must be submitted as a single PDF not exceeding five pages, excluding the cover page, price worksheet, and certifications. Required submission materials include the inspector's certification, a one-page resume, and past performance references. Due to the work being performed on a closed military installation, all personnel must undergo identity proofing and vetting unless they possess a current government security clearance. Quotes must be submitted electronically to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by the response deadline of November 13, 2026.
All Other Professional, Scientific, and Technical Services

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS