Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 3, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--ELIMINATE PHANTOM SILOS, PN AFGS126001, WYOMING, MONTANA AND CALIFORNIA

Awarded
W9128F-13-R-0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Eliminate Phantom Silo project is a Department of Defense initiative under the New START Treaty between the United States and Russia, focused on rendering 103 ICBM Launch Facilities and 9 Missile Alert Facilities non-usable. The work is distributed across Wyoming, Montana, and Vandenberg Air Force Base in California. The project requires strict oversight by Treaty Compliance Officers and National Technical Means teams to verify non-use status through accurate scheduling and reporting of the removal inventory. The scope of work involves a two-phase process at each Launch Facility, including the removal of launch doors, filling tubes with debris and gravel, installing concrete caps, and grading the surrounding one-acre sites. At Missile Alert Facilities, infrastructure will be dismantled and below-ground access points obstructed. The contractor is responsible for performing Environmental Baseline Surveys and importing approximately 200,000 cubic yards of fill material. Estimated costs for the demolition and construction are between 20 million and 30 million dollars.

General Info

Contract Value

$14,320,894

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NE, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice type changed from Presolicitation to Special Notice. The response deadline was removed. The notice description changed.

Notice updated

Notice type changed from Special Notice to Presolicitation. Response deadline added: Apr 17, 2013. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
ContactsNo contact information available

Full Description

Show more
This is a Fully-Designed Project. The Eliminate Phantom Silo project is a part of the New START Treaty between the United States and Russia. The project will require observation and oversight by Treaty Compliance Officers and National Technical Means 'NTM' teams for the agreed to periods of time to perform observance and recording/verification of non-use status on each designated ICBM Launch Facility 'LF' identified under the project. Project will demand accurate scheduling, reporting and management of the entire removal inventory as identified by Treaty Offices. Project requires 103 ICBM LF to be rendered as non-usable and 9 Missile Alert Facilities 'MAF' to have their infrastructure and limited below grade elements demolished. LF and MAF are located in rural areas throughout Wyoming '50 LF, 4 MAF', Montana '50 LF, 5 MAF' and on Vandenberg AFB, California '3 LF'. Work includes running heavy equipment operations throughout 103 LF and 9 MAF encompassing a grid area of approximately 70 miles east-west by 65 miles north-south in WY, 70 miles east-west by 65 miles north-south in MT and 3 California sites located on Vandenberg AFB. The work at each LF will be phased in two separate phases. The first phase will deal specifically with treaty compliance and LF elimination by means of launch door removal and disposal, filling of ICBM launcher tube with debris, rubble and imported gravel to render as non-usable, and other dismantling and demolition of surrounding launcher silo infrastructure. The second phase will require a concrete cap over the launcher tube with access points to other on-site below grade support structures filled and rendered non-usable. The entire LF site 'each approximately one acre' will be graded to a final specified grade. As part of the second phase, the MAF building structure will remain intact, but the overall site will require infrastructure dismantlement, disposal of support equipment, concrete capping and utilizing fill material to obstruct some below ground access areas. The Contractor will have access to material salvage at the LF and MAF sites. Prior to conducting any operations at the LF and MAF, the Contractor will be required to perform Environmental Baseline Surveys for each LF and MAF, no abatement or removal of recorded materials is required as they are to be abandoned in place. It is estimated that approximately 200,000 CY of various fill material 'i.e., earth, gravel, aggregates, etc.' will be required for import and use throughout the sites to complete the work. Other site work in WY and MT for each LF includes the removal of all topside appurtenances outside of the vehicle pad area, but within the project limits 'i.e., pull boxes, markers, antenna poles and bases'. All surface items are to be removed to existing grade with removal of exterior shafts and vents to a minimum of six-feet below grade and capped with concrete. The contractor will be required to weld the Launcher Equipment Building 'LEB' blast door closed and LEB access shaft filled to obstruct access. All topside man hatch access will be concrete capped. The final grading shall include gravel fill on the back side of the silo to match with existing grade. Each LF will final graded to drain freely and conform to natural surroundings. Site work in California will include filling of launcher tube with debris, rubble, imported earth and gravel. The contractor will complete backfill operations, construct concrete caps, and complete other site demolition items. Existing hard surface 'asphalt and concrete' located on the sites will remain in place. LEB access will be obstructed/removed and/or filled to eliminate any future access. The estimated demolition/construction cost of this project for basic and all options is between $20,000,000 and $30,000,000.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a firm-fixed-price requirement issued by the US Army Corps of Engineers Omaha District for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The scope of work specifically covers facilities G7140 and H7140 and includes conducting a teleconference kick-off meeting, performing external tank and visual containment area inspections, and testing alarms and Automatic Tank Gauge equipment. The contractor is required to provide a certified API 653 Inspector and a Project Manager to ensure compliance with industry standards including API 653, API RP 575, NFPA 30, and NFPA 326. Key deliverables consist of draft and final reports for each facility along with completed API Std 653 checklists, with all work to be completed by March 20, 2027. This acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 541990. Proposals must be submitted as a single PDF document not exceeding five pages, excluding the price worksheet and administrative pages, and must be sent to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by November 13, 2026. Award decisions will be based on the most advantageous offer, evaluating technical capability, inspector certifications, relevant project experience, and price reasonableness. Contractors must adhere to strict installation security requirements for personnel and vehicle access and comply with DFARS 252.204-7012 regarding the safeguarding of covered defense information.
All Other Professional, Scientific, and Technical Services

POSTED

about 15 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS