Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on March 3, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--FY09 M/D DETROIT RIVER

Awarded
W911XK-09-B-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Butte Slough Outfall Gates Repairs, Sacramento River State Plan Flood Control Facilities
Solicitation # 26-10
Solicitation 26-10, Contract C51700, is issued by the California Natural Resources Agency, Department of Water Resources, for repairs to the Butte Slough outlet structure located at the confluence with the Sacramento River in Colusa and Sutter Counties. The scope of work includes selective demolition, the installation of steel piles and piers, and the replacement of the inlet catwalk. The contractor is responsible for installing seven Department-furnished slide gates and seven electrical actuators. Key operational requirements include managing in-water work, implementing dewatering and fish rescue plans, and adhering to a project-specific spill prevention, containment, and cleanup plan. The contract will be awarded to the lowest responsible bidder, with specific preferences available for certified small businesses, California companies, and Disabled Veteran Business Enterprises. Bidders must provide bid security via cash, check, or bond, and the successful awardee must furnish performance and payment bonds equal to the total bid amount. Compliance with various environmental permits is mandatory, including the Clean Water Act Sections 401 and 404 and the CDFW Lake and Streambed Alteration Agreement. Additionally, the contractor must employ a CDFW-approved Designated Biologist to oversee environmental compliance and conduct mandatory on-site education for all personnel. Bids must be submitted in sealed envelopes to the California Natural Resources Agency Headquarters in Sacramento by 2:00 P.M. on December 2, 2026.
California Natural Resources Agency, Department of Water Resources

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation W911XK-09-B-0001 is a sealed bid procurement issued by the Department of Defense through the US Army Corps of Engineers, Detroit District, for the FY09 maintenance dredging of the Detroit River in Michigan. The project involves the removal of approximately 90,000 cubic yards of material, with an estimated construction cost ranging between 1 million and 5 million dollars. This contract is designated as a total small business set-aside under NAICS code 237990 and FSC code Y216, adhering to a small business size standard of 18.5 million dollars for dredging operations. The procurement process included a solicitation issued on January 23, 2009, with a final response deadline in late February. According to Amendment 0001, the project requirements specify a 10-day window for the commencement of work and a 90-day completion period for the base period. Payment structures for the contract are based on a combination of lump sum mobilization and unit price dredging items. The project is managed by the Contracting Division of the Detroit District, USAED, located in Detroit, Michigan.

General Info

Contract Value

$1,791,335.4

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MI, USA

Set-Aside

NONE

Award Issued Date

Documents

3
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstifb
High
ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Detroit
ContactsNo contacts available
OfficeDETROIT, MI, 48226-5000, USA
Office AddressDETROIT, MI, 48226-5000, USA
ContactsNo contact information available

Full Description

Show more
FY09 Maintenance Dredging of the Detroit River, Michigan Approximately 90,000 cubic yards of material. The estimated cost of construction is between $1,000,000 to $5,000,000. This procurement is RESTRICTED TO SMALL BUSINESS CONCERNS. The FSC Code is Y216, NAICS Code - 237990. The Small Business Size Standard is $18.5 million for dredging. The solicitation will be available on or about 12 January 2009. POC: Sharon A. Lawrence at +1 (555) 000-0000 or e-mail contact@example.gov.

More opportunities from Department Of Defense → W072 Endist Detroit

Same awarding agency

NAICS: 237990
New
Federal
Duluth Vessel Yard Phase III Repairs
Solicitation # W911XK27BA001
Solicitation W911XK27BA001 is a firm-fixed-price construction contract issued by the U.S. Army Corps of Engineers, Detroit District, for Phase III repairs at the Duluth Vessel Yard Historic District. This project is a total small business set-aside and involves comprehensive infrastructure upgrades, including the installation of electrical distribution systems, exterior LED lighting, cast-in-place concrete work, structural metal fabrications, and automated access control barriers. Key deliverables include steel sheet pile encapsulation, bollard anchors, and reinforced concrete work. The project must commence within 10 calendar days of the notice to proceed, with a final completion deadline of August 15, 2028, assuming a notice to proceed date of January 12, 2027. To be eligible for award, bidders must demonstrate responsibility by submitting a preliminary work plan, a preliminary equipment plan detailing marine plant and piling systems, and evidence of prior project experience in marine piling. Mandatory requirements include a CMMC Level 1 self-assessment in the Supplier Performance Risk System and compliance with Davis-Bacon wage rates and Buy American standards. The contract specifies strict packaging and marking requirements for reinforcing bars and paints, and mandates the use of Appleton Powertite connectors for safety. Bids must be submitted via the PICE portal, and the successful offeror will be required to provide performance and payment bonds if the contract price exceeds 150,000 dollars.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS