Y--EO14398 REHAB WATERLINE FOR FIRE FLOW - GLBA

Awarded
140P9726R0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract solicitation, titled Y--GLBA REHAB WATERLINE, is a total small business set-aside under FAR 19.5 for the rehabilitation of water distribution lines to meet fire flow requirements in Alaska, issued by the National Park Service, Alaska Regional Office. The solicitation, numbered 140P9726R0002, was posted on July 17, 2026, with a response deadline of August 6, 2026, and targets a firm-fixed-price contract to upsize existing waterlines, install new connections to the main distribution system, and reinstall service lines, fire hydrants, gate valves, and related appurtenances. The work must comply with detailed technical specifications, construction drawings, and seismic testing requirements outlined in over 200 pages of attachments, and is governed by the Davis-Bacon Act under Wage Determination AK20260001. The contractor must submit a comprehensive proposal via email, adhering to strict formatting rules including a 30 MB file size limit, a required subject line format, and inclusion of a technical narrative, construction schedule, past performance documentation, and pricing for two base line items: waterline rehabilitation and service entrance upgrades. All proposals must be from small businesses currently registered in SAM with an active CAGE code and validated annual representations, and must conform without alteration to all solicitation terms. Performance must begin within ten calendar days of award and be completed within 335 calendar days, with an estimated period of performance from June 1, 2026, to October 31, 2026. The project requires the contractor to maintain a robust safety program, provide performance and payment bonds in SF25-23a and SF25A-23a formats, and carry general liability and builder’s risk insurance—though the latter is not reimbursable by NPS. All materials must be delivered and handled per stringent packaging and handling standards including manufacturer-sealed containers, avoidance of damaging lifting equipment, and compliance with ASTM and EPA recycling requirements for packaging materials. The contract mandates full compliance with Buy American provisions, prohibitions on trafficking in persons, and nondisclosure agreements for classified information. Evaluation will be based on a best value trade-off approach considering technical capability, past performance in Alaska, safety program strength, and price reasonableness, with proposals failing any compliance gate eliminated from consideration. Payment will be processed electronically through the U.S

General Info

Small business set-aside for waterline rehab improving fire flow, deadline June 8, Alaska.

Contract Value

$4,535,039

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

AK, USA

Set-Aside

NONE

Award Issued Date

Documents

19

Alaska Building and Heavy Construction Wage Determination AK20260001

PDF, High priority: read this firstwage-determination
High

Amendment 0001 to Solicitation 140P9726R0002 for Waterline Rehabilitation

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 140P9726R0002

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 140P9726R0002

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 140P9726R0002

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation 140P9726R0002

PDF, High priority: read this firstamendment
High

B08 Attachment 1 - Division 1 Technical Specifications for Glacier Bay Water Service Rehab

PDF, High priority: read this firstspecifications
High

B08 Attachment 2 - Construction Drawings

PDF, High priority: read this firstconstruction-drawings
High

B08 Attachment 3 - Statement of Structural Tests and Special Inspections

PDF, High priority: read this firstsow
High

B08 Attachment 5 - Submittal List for Rehab Water Lines at Bartlett Cove Housing

PDF, High priority: read this firstsubmittal-list
High

NPS Denver Service Center CM-16 Submittal Form

PDF, High priority: read this firstsubmittal-form
High

Pre-Solicitation Synopsis 140P9726R0002 for Waterline Rehabilitation

PDF, High priority: read this firstpresolicitation
High

Q&A Log for GLBA Rehab Waterline Solicitation 140P9726R0002

PDF, High priority: read this firstq-and-a
High

Solicitation 140P9726R0002 Rehabilitate Waterline System for Fire Suppression Service

PDF, High priority: read this firstifb
High

Solicitation B08 - Water Distribution System Improvements

PDF, High priority: read this firstrfp
High

Standard Form 25A Payment Bond

PDF, High priority: read this firstpayment-bond
High

Standard Form 25 Performance Bond

PDF, High priority: read this firstperformance-bond
High

Past Performance Questionnaire 140P9724R0001

DOCX, Low prioritypast-performance
Low

Report on Limitations on Subcontracting for Contract 140P9726R0002

XLSX, Low prioritysubcontracting-worksheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Deadline changed

Response deadline changed from Jun 8, 2026 to Jun 24, 2026.

Notice updated

Response deadline changed from Jun 24, 2026 to Aug 6, 2026. The notice description changed.

Deadline changed

Response deadline changed from Aug 6, 2026 to Aug 20, 2026.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Alaska Regional OFFICE(97000)
Contacts1 person available
OfficeANCHORAGE, AK, 99501, USA
Office AddressANCHORAGE, AK, 99501, USA

Full Description

Show more
EO14398 REHAB WATERLINE FOR FIRE FLOW - GLBA

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional system. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include traffic control, SWPPP, construction surveying, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is managing the solicitation for this project and is specifically seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support various specialty trades. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding portal. Primary points of contact for coordination and outreach are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key scope elements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, concluding with by-pass pumping, testing, and commissioning. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and the total of unit price products. Bids must include a bid bond, MWBE documentation, and a completed bid form. The contract is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Payment is processed monthly via applications for payment, with a 30-day due date following presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of open and covered concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements involve the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, and modifications to sluice and slide gates. The project also entails installing platforms for access, rerouting sump pump discharge lines, performing excavation and trench work, and conducting surveying around the reactors. This solicitation is specifically targeting Small Business, Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified subcontractors, with a particular emphasis on DBE, MBE, WBE, and SBE firms. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Quotes are due by November 17, 2026, at 2:00 PM PT, and must include the subcontractor's bond rate and any redlines to the Garney Standard Purchase Order and Subcontract forms.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Department Of The Interior → Alaska Regional OFFICE(97000)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS