GRCA 318719 North Rim & Springs Rehabilitation Pro
Open
140PP027R0005Federal
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The North Rim and Roaring Springs Rehabilitation Program is a comprehensive infrastructure project at Grand Canyon National Park, Arizona, managed by the National Park Service Denver Service Center. The program focuses on replacing and rehabilitating obsolete water, wastewater, and power systems to meet current code and water quality regulatory requirements. Key deliverables include the rehabilitation of the Roaring Springs Pumphouse and associated raw water pipelines, the construction of a North Rim Water Treatment Plant, the replacement of the sewer collection system, and extensive power upgrades. Power improvements involve adding a fourth standby generator at the Power Distribution Center, replacing transformers and junction boxes across the North Rim campus, and installing new power and fiber communications between the pumphouse and Manzanita, as well as a new solar power system at Cottonwood Campground.
This project will be awarded as a Firm-Fixed-Price contract with an estimated magnitude exceeding 10 million dollars and an anticipated performance period of 1,460 calendar days from the Notice to Proceed. The government will utilize a best value continuum trade-off process to evaluate offers based on technical capability, past performance, and price. There is no set-aside for this procurement, and the size standard is 45 million dollars. Prospective offerors must possess a Unique Entity ID and active SAM registration. Bid, performance, and payment bonds are required for the contract. The formal solicitation is expected to be released on or after November 5, 2026.
General Info
NPS infrastructure project for North Rim water, sewer, and power upgrades over $10M.
HighAI Summary for Bid Bond Form for Solicitation PSP Volume II: This document is a Bid Bond form associated with Solicitation PSP Volume II. It includes instructions for execution, obligations, and conditions binding the Principal and Surety(ies) to the United States Government. The bond guarantees the bid submission and obligates the Principal to execute contractual documents and provide required bonds if the bid is accepted. The form details the penal sum, types of organizations, signatures, and corporate seals required. It also outlines procedures for individual and corporate sureties, including co-surety arrangements and liability limits. The document is authorized for use when a bid guaranty is required and includes instructions for proper completion and submission.
XLSX
XLSX, High priority: read this first4 pages · bid-schedule
HighAI Summary for CLIN Price Sheet - Rehabilitate North Rim Utility Infrastructure: Contract Price Schedule for solicitation 140PP027R0005 dated 3-13-18, regarding the rehabilitation of North Rim Utility Infrastructure at Grand Canyon National Park. The document contains a detailed CLIN structure including base items for pipelines, water treatment, and power distribution, as well as optional items for wastewater and power distribution. It specifies requirements for lump-sum and unit-priced entries.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for General Survey Control (North Rim): Dated May 2026, this document provides technical survey control data for the North Rim area, including point tables with northing, easting, and elevation coordinates. It also includes detailed engineering specifications for pipe zone bedding, trench details, and valve installation requirements.
PDF
PDF, High priority: read this first42 pages · specifications
HighAI Summary for Geotechnical Investigation Report - GRCA 318719: Rehabilitate North Rim Utility Infrastructure: Geotechnical Engineering Investigation report dated August 11, 2025, prepared by GEI Consultants, Inc. for HDR Engineering, Inc. The document provides geotechnical findings and design recommendations for the Inner Canyon portion of the Grand Canyon National Park utility infrastructure project, including power pole replacement, fire water tank construction, and slope stabilization.
PDF
PDF, High priority: read this first162 pages · specifications
HighAI Summary for Geotechnical Investigation Report - Rehabilitate North Rim Utility Infrastructure: Geotechnical Investigation Report dated August 11, 2025, prepared by GEI Consultants, Inc. for HDR Engineering, Inc. regarding the GRCA 318719 project to rehabilitate North Rim utility infrastructure at Grand Canyon National Park. The report provides subsurface investigation results, geologic settings, and critical geotechnical design recommendations for foundations, pipeline installation, and construction considerations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Grand Canyon National Park - North Rim Infrastructure Rehabilitate - Volume 1 Pipelines: Technical specifications and drawing indices for the rehabilitation of North Rim infrastructure at Grand Canyon National Park. Volume 1 focuses on pipelines, including hydraulic profiles, tree removal and protection plans, and utility alignments. Includes data from 1973, 1985, and 2024.
PDF
PDF, High priority: read this first44 pages · specifications
HighAI Summary for GRCA 318719 Geologic Interpretive Summary Report - North Rim Utility Infrastructure: Geologic Interpretive Summary Report (GISR) dated March 31, 2026, prepared by GEI Consultants, Inc. for HDR Engineering, Inc. The report provides geotechnical data, subsurface conditions, and construction considerations for the waterline construction from the North Rim Ballfield Site to the Roaring Springs Pump House as part of the GRCA 318719 Rehabilitate North Rim Utility Infrastructure project for the National Park Service.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Construction Camp - Final CDs Volume 00: Construction drawings/specifications for the North Rim Construction Camp at Grand Canyon National Park, designed by Hedges/Reversing Incl and dated June 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Cottonwood Campground Construction Camp Drawing: Technical drawing and general notes for the Cottonwood Construction Camp at Grand Canyon National Park, dated June 2026. The document defines limits of construction, shared use restrictions with NPS, and specific camping limitations for the inner canyon area.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Final CDs Volume 05 - General Notes and Site Layout: Technical construction documents (CDs) Volume 05 for the North Rim project, dated 2026-10-12. The document provides general notes on material thickness, equipment transport requirements, and site-specific electrical and infrastructure layouts for Roaring Springs Cave, RSPH, and power distribution lines.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for North Rim Final CDs Volume 05 Part 12: Technical construction documents (CDs) for the North Rim project, featuring engineering details from HDR Engineering, Inc. based in Denver, CO.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Final CDs Volume 05 - Part 3: Technical construction documents (CDs) dated 10/12/2023 for the North Rim project. This volume contains general notes, key notes for erosion control (silt fence and sediment control logs), and a legend for site alignments and utility locations between North Rim and the Roaring Springs Pumphouse.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for North Rim Final CDs Volume 05 Part 7: Construction documents (CDs) for the North Rim project at Grand Canyon National Park, involving HDR Engineering, Inc. This specific volume contains technical specifications or drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Final CDs Volume 05 - Roaring Springs Pumphouse Specifications: Technical construction specifications for the North Rim project, specifically focusing on the Roaring Springs Pumphouse. The document details electrical requirements, including 15KV power cables, transformers (T-67), fiber optic cabling (singlemode), and conduit installations, referencing compliance with International Building Code and NFPA standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim - Grand Canyon National Park Construction Drawings: A collection of technical construction drawings and specifications for the North Rim at Grand Canyon National Park. The document includes electrical trench details, heat trace control panel mounting, architectural and structural demolition plans, and HVAC system installation references. It features detailed notes on demolition requirements and material disposal, dated between 2017 and 2026.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for North Rim Grand Canyon National Park - Final CDs Volume 00: Construction documents (CDs) for the North Rim Grand Canyon National Park project, produced by HDR Engineering, Inc.
PDF
PDF, High priority: read this first11 pages · specifications
HighAI Summary for North Rim Grand Canyon National Park - Instrumentation Details: Technical drawings and specifications for instrumentation details at North Rim Grand Canyon National Park, produced by HDR Engineering, Inc. The document includes detailed requirements for fiber optic patch panels, microduct pull boxes, flow transmitters, pressure gauges, and level float switches, including material specifications (NEMA 4X, 316 stainless steel) and installation notes.
PDF
PDF, High priority: read this first35 pages · specifications
HighAI Summary for North Rim Grand Canyon National Park - Utility Drawings: Technical engineering drawings and schedules dated May 2026 for the North Rim Grand Canyon National Park. The document includes chemical area isometrics, finished water storage tank isometrics, HVAC plans, sections, and equipment schedules (AHU and CU) for the Roaring Springs Pump House.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for North Rim Grand Canyon National Park - Volume 05: Technical documentation for the North Rim Grand Canyon National Park project, involving HDR Engineering, Inc. as the prime contractor.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for North Rim Grand Canyon National Park - Volume 05: Technical documentation for the North Rim Grand Canyon National Park project, involving HDR Engineering, Inc. as the prime contractor.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for North Rim Grand Canyon National Park - Volume 05 Part 5: Technical documentation for the North Rim Grand Canyon National Park project, involving HDR Engineering, Inc. This specific volume appears to be part of a construction document set.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for North Rim Grand Canyon National Park - Volume 05 Part 8: Technical documentation or construction drawings for the North Rim Grand Canyon National Park project, provided by HDR Engineering, Inc.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for North Rim Infrastructure Rehabilitation - Sheet Index: Dated August 2026, this document serves as a Sheet Index for the North Rim Infrastructure Rehabilitation project at Grand Canyon National Park. It outlines various volumes covering pipelines, water treatment, wastewater collection, and power distribution, specifically detailing the general sheet index and utility profiles for the North Rim to Roaring Springs Pumphouse.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Infrastructure - Volume 11 Power Distribution: Technical specifications and design criteria for the North Rim Infrastructure project at Grand Canyon National Park. This document (Volume 11) focuses on power distribution from Roaring Springs Pumphouse to Manzanita, including general notes, structural design criteria (wind, seismic, snow loads), and a sheet index for cable routes and installation details. Dated August 2026.
PDF
PDF, High priority: read this first11 pages · specifications
HighAI Summary for North Rim Infrastructure - Volume 12 Power System Cottonwood Campground: Technical specifications and sheet index for the rehabilitation of North Rim infrastructure at Grand Canyon National Park. Volume 12 focuses on the Power System at Cottonwood Campground, specifically detailing photovoltaic system plans, solar shade canopies, and structural design criteria including load requirements, concrete strengths, and applicable building codes (IBC 2024). Dated August 2026.
PDF
PDF, High priority: read this first19 pages · specifications
HighAI Summary for North Rim Infrastructure - Volume 3 Pipelines North Rim to Supai Tunnel: Technical design documents and sheet index for the rehabilitation of North Rim infrastructure at Grand Canyon National Park. This volume specifically covers pipelines from North Rim to Supai Tunnel, including site plans, hydraulic profiles, and detailed assembly plans for PRV vaults, dated May-August 2026.
PDF
PDF, High priority: read this first11 pages · specifications
HighAI Summary for North Rim Infrastructure - Volume 4 Pipelines (Roaring Springs Cave to RSPH): Technical design drawings and specifications for the rehabilitation of infrastructure at North Rim Grand Canyon National Park. This volume specifically covers pipelines from Roaring Springs Cave to the Roaring Springs Pumphouse (RSPH), including site plans, demolition plans, civil details for waterline replacement, and electrical panelboard schedules dated May-August 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Infrastructure - Volume 9 Power Distribution: Technical drawings and specifications for the North Rim Power Distribution system at Grand Canyon National Park. This document (Volume 9) includes site demolition plans, power distribution plans, and general notes for the rehabilitation of infrastructure, dated May 2026.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for North Rim Isolation Valve Vault Plan: Technical engineering drawing and specifications for an Isolation Valve Vault at North Rim Grand Canyon National Park. Prepared by HDR Engineering, Inc. (dated August 2025), the document includes detailed site work, vault dimensions (48x72x48 polymer concrete), piping specifications (SCH 80 STL), and flanged connection requirements (ANSI Class 900).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Norton Ct Campground Construction Camp - Limits of Construction: Technical drawing and specifications document for the North Rim Norton Court Campground construction project at Grand Canyon National Park. Dated April 17, 2024, it details the Limits of Construction (LOC), contractor staging areas, site access points, and civil mapping symbology for the U.S. Army Corps of Engineers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Power Distribution - Volume 10: Technical drawings and demolition plans for power distribution infrastructure from the North Rim to Roaring Springs Pumphouse at Grand Canyon National Park. Dated May 2026, the document includes site plans, power line profiles, and general notes for the removal of existing poles and conductors.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for North Rim Rehabilitate Infrastructure - General Sheet Index: A general sheet index and volume description for the North Rim infrastructure rehabilitation project at Grand Canyon National Park, dated August 2026. The document outlines 13 volumes covering pipelines, water treatment, wastewater collection, and power distribution, and provides a detailed index of 99 general sheets including civil, structural, architectural, and electrical details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim - Roaring Springs Pumphouse (Volume 5) Specifications: Technical specifications and design criteria for Volume 5 (Roaring Springs Pumphouse) of the North Rim project. The document includes a sheet index, construction limits table, structural notes, and design criteria referencing IBC 2024, ACI 318-19, and ASCE 7-22, including load requirements and concrete strength specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim - RSPH Utility Corridor Waterline Fitting Table: Technical drawing and specification document dated June 2026 for the North Rim - Grand Canyon National Park project. It contains a detailed waterline fitting table with northing/easting coordinates and material specifications for SCH 40 STL piping and utility corridor plans.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim - Structural Details and Connections: Technical structural specifications and drawings for the North Rim project at Grand Canyon National Park, dated May 2026. The document includes detailed requirements for concrete reinforcing around openings, lap and embedment schedules, standard bolted connection schedules, and concrete curb specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim Wastewater Collection System - Volume 8: Technical specifications and drawing index for the rehabilitation of the North Rim wastewater collection system at Grand Canyon National Park. The document includes a sheet index for wastewater maps, demolition plans, and general construction notes regarding pipe alignment, depth requirements, and site restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Rim WWTP Helicopter Staging Area Drawing: Technical drawing (Sheet 9 of 99) dated June 2026 for the North Rim WWTP Helicopter Staging Area, detailing limits of construction, flight paths, and security access gates. Prepared by Hard Engineering, Inc.
PDF
PDF, High priority: read this first414 pages · specifications
HighAI Summary for Rehabilitate North Rim Infrastructure - Specifications Volume A (Division 01): Construction specifications for the 'Rehabilitate North Rim Infrastructure' project at Grand Canyon National Park, dated May 2026. This document comprises Volume A (Division 01 - General Requirements), covering summary of work, project management, safety, and environmental protections. It details work areas including pipelines, water treatment plants, wastewater collection, and power distribution across the North Rim and Innercanyon.
PDF
PDF, High priority: read this first680 pages · specifications
HighAI Summary for Rehabilitate North Rim Infrastructure - Specifications Volume B: Construction specifications for the Rehabilitate North Rim Infrastructure project at Grand Canyon National Park, dated May 2026. This Volume B document covers Divisions 02 through 23, including demolition, concrete, masonry, metals, finishes, and plumbing, and includes professional seals from licensed engineers and architects.
PDF
PDF, High priority: read this first988 pages · specifications
HighAI Summary for Rehabilitate North Rim Infrastructure - Specifications Volume C: Construction specifications for the Rehabilitate North Rim Infrastructure project at Grand Canyon National Park, dated May 2026. This Volume C document covers Divisions 26 through 46, including detailed electrical (Division 26) and communications (Division 27) requirements, and includes professional engineer seals and signatures for various technical sections.
PDF
PDF, High priority: read this first7 pages · subcontracting-plan
HighAI Summary for Small Business Subcontracting Plan Template: A Small Business Subcontracting Plan template (Revised v2 Mar2025) for solicitation 140P202xxxxxxxx. The document outlines the 15 required elements per FAR 19.704(a), including goals for SB, SDB, HUBZone, ISBEE, SDVOSB, and WOSB, methods for identifying subcontractors, and the responsibilities of the Subcontracting Program Administrator.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Solicitation 140P20XXRXXXX Past Performance Questionnaire: This document is a Past Performance Questionnaire associated with Solicitation No. 140P20XXRXXXX. It is intended for use as source selection information and is source selection sensitive. The questionnaire requires the offeror to provide company and contract information, which is then evaluated by a reference who completes an evaluation section rating various performance areas such as quality, schedule, cost control, management, small business subcontracting, and regulatory compliance. The document includes instructions for completion and emphasizes that the information cannot be used for promotional purposes. It serves as a critical evaluation tool in the procurement process to assess the past performance of offerors.
PDF
PDF, High priority: read this first3 pages · rfp
HighAI Summary for Solicitation 140PP027R0005 - North Rim and Roaring Springs Rehabilitation Program: A Request for Proposal (RFP) using Standard Form 1442 for the North Rim and Roaring Springs Rehabilitation Program. The project involves construction, alteration, or repair with a magnitude exceeding $10M. Key requirements include the installation of pipelines and a pumphouse, with a total performance period of 1,095 calendar days starting after Notice to Proceed.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination AZ20260056 - Arizona Coconino County: General Decision Number AZ20260056 dated 05/18/2026 for Heavy Construction in Coconino County, Arizona. The document specifies prevailing wage rates and fringe benefits for various classifications, including electricians, power equipment operators, and laborers, and includes notes on Executive Orders regarding paid sick leave.
PDF
PDF, Low priority75 pages · other
LowAI Summary for B08_140PP027R0005: The document contains heavily encoded or corrupted text with fragmented alphanumeric characters and symbols. While it references some procurement-like terminology and a filename suggesting a contract or solicitation, the content is unreadable and lacks coherent technical or administrative information.
PDF
PDF, Low priority2 pages · past-performance
LowAI Summary for General References Form: A form for offerors to provide general references, including information on sureties, corporate banks, insurance companies, subcontractors, and material suppliers, as part of the solicitation process.
PDF
PDF, Low priority2 pages · special-notice
LowAI Summary for GRCA 318719 - North Rim & Springs Rehabilitation Program Site Visit Notice: Urgent notice for a site visit regarding the North Rim & Roaring Springs Rehabilitation Program at Grand Canyon National Park. The project involves rehabilitating water, wastewater, electrical, and communication infrastructure, including complex directional drilling. Site visits are scheduled for October 28 and 29, 2026, with an RSVP deadline of October 13, 2026. The solicitation is anticipated for release in the October/November 2026 timeframe.
PDF
PDF, Low priority2 pages · other
LowAI Summary for North Rim Grand Canyon National Park - HDR Engineering: A document fragment referencing North Rim Grand Canyon National Park and HDR Engineering, Inc. in Denver, CO. The content is limited to headers and lacks specific procurement details.
PDF
PDF, Low priority1 page · other
LowAI Summary for North Rim Grand Canyon National Park - HDR Engineering, Inc.: A document fragment from HDR Engineering, Inc. regarding the North Rim of Grand Canyon National Park. The content is limited to a header and location (Denver, CO), providing insufficient detail to determine the specific procurement purpose.
PDF
PDF, Low priority2 pages · other
LowAI Summary for North Rim Grand Canyon National Park - Volume 05 Part 6: A fragmentary document related to the North Rim Grand Canyon National Park project, involving HDR Engineering, Inc. The content appears to be a header or index page with minimal descriptive text.
Notice type changed from Special Notice to Presolicitation. Response deadline changed from Oct 13, 2026 to Nov 6, 2026. The notice title changed. The notice description changed.
Type Changed
Presolicitation → Solicitation
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.
Organization & Contact Information
Show more
AgencyDepartment Of The Interior → National Park Service Contracting Activity