Y--LA BAYOU SAUVAGE NWR BRDWK REHAB RBY06

Awarded
140FC126R0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ridge Trail Boardwalk Rehabilitation project at Bayou Sauvage National Wildlife Refuge in New Orleans, Louisiana, is a firm fixed price construction contract awarded by the U.S. Fish and Wildlife Service. With an estimated magnitude between $250,000 and $500,000, the project involves the removal and replacement of deteriorated structural elements, including deck boards, toe boards, piles, beams, and hurricane tie straps. The work is designated as a Total Small Business Set-Aside under NAICS code 237990. The contractor is required to commence work within 10 calendar days of the notice to proceed and must complete all activities within 90 calendar days. Award is based on the Lowest Price Technically Acceptable methodology, evaluating offerors on recent relevant experience with trail boardwalks, technical capabilities, and price. Key requirements include the implementation of a comprehensive Contractor Quality Control Plan, adherence to Davis-Bacon Act wage determinations, and compliance with strict environmental regulations regarding endangered species and hazardous waste. Performance and payment bonds are mandatory, and all invoicing must be processed electronically through the Invoice Processing Platform. Special provisions require the use of waterborne preservatives for wood products and the procurement of Federal PIV credentials for personnel requiring unsupervised facility access.

General Info

Contract Value

$244,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

9

Amendment 0001 to Solicitation 140FC126R0003

PDF, High priority: read this first2 pages · amendment
High

Attachment 4 - Bid Schedule for Boardwalk Rehabilitation at Bayou Sauvage NWR

PDF, High priority: read this first1 page · bid-schedule
High

Attachment 5 - Past Performance Questionnaire for Ridge Trail Boardwalk Rehabilitation

PDF, High priority: read this first6 pages · past-performance
High

DOL Wage Determination LA20250008 Ridge Trail Boardwalk Rehabilitation

PDF, High priority: read this first22 pages · wage-determination
High

Pre-Solicitation Notice for Ridge Trail Boardwalk Rehabilitation Project 140FC126R0003

PDF, High priority: read this first1 page · presolicitation
High

Solicitation 140FC126R0003 Ridge Trail Boardwalk Rehabilitation

PDF, High priority: read this first67 pages · ifb
High

Solicitation 140FC126R0003 Ridge Trail Boardwalk Rehabilitation IFB

PDF, High priority: read this first3 pages · ifb
High

Solicitation 140FC126R0003 Ridge Trail Boardwalk Replacement Q&A

PDF, High priority: read this first3 pages · q-and-a
High

SOW for Ridge Trail Boardwalk Rehabilitation Project, Bayou Sauvage NWR

PDF, High priority: read this first82 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 1 Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Office AddressFalls Church, VA, 22041, USA

Full Description

Show more
Construction Services Ridge Trail Boardwalk Replacement project

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 14 hours ago

DEADLINE

in 23 days
View Details

More opportunities from Department Of The Interior → Construction A/e Team 1 Fws

Same awarding agency

NAICS: 541620
Federal
Environmental Compliance and Monitoring SupportThis contract entails on-site environmental monitoring services to ensure strict adherence to the Endangered Species Act during construction activities. The primary responsibility is to identify and respond to the presence of threatened or endangered species in real time, with an immediate and mandatory shutdown of all work if such species are detected. The scope of work is centered on compliance, requiring continuous surveillance by qualified personnel to prevent habitat disruption and legal violations. All monitoring must be conducted in alignment with federal conservation standards and regulatory expectations set forth by the Department of the Interior. The contract is awarded as a subcontract under NAICS code 541620, indicating it involves environmental consulting and related services. It is managed by Construction A/e Team 1 Fws, acting under the authority of the Department of the Interior, and is positioned for performance in an unspecified location, suggesting flexibility in geographic application. The monitoring effort is not a passive compliance check but an active, dynamic safeguard requiring immediate operational intervention. Work stoppage is non-negotiable upon species detection, emphasizing the priority of species protection over project timelines. The contract reflects a high-stakes environmental responsibility where timing, accuracy, and responsiveness are critical to avoid regulatory penalties and ecological harm.
Environmental Consulting Services

POSTED

3 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS