Y -- Layng Creek Structural-Plate Pipe Arches

Active
R6-15-02-51Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the construction of two structural-plate pipe arches on the Cottage Grove Ranger District within the City of Cottage Grove municipal watershed. Scope of work includes excavation, removal of existing culverts, installation of pipe arches, riprap placement, embankment, aggregate and hot asphalt surfacing, drainage improvements, and associated road reconstruction activities. The project work window is restricted to between June 1 and September 30, with completion required by 2003. The estimated contract value falls between $100,000 and $250,000, and the NAICS code assigned is 234110. The contract is a HUBZone set-aside, requiring current HUBZone certification for eligibility. Proposals must include price information and responses to a questionnaire; however, detailed technical proposals are not required. Offerors must address their site-specific technical approach, equipment capabilities, sedimentation control plans, and past performance history. Award evaluation criteria combine technical approach, equipment capabilities, past performance, and price. The contract may be awarded without discussions and may include optional related work items. The contracting agency is the Umpqua National Forest under the Department of Agriculture, and the point of contact is Charlette E MacDonald.

General Info

Construction of two pipe arches in Cottage Grove, HUBZone set-aside, completion by Sept 2003.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Cottage Grove Ranger DistrictUmpqua National Forest Lane County, Oregon, OR

Set-Aside

HZC

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Umpqua National Forest
Contacts1 person available
OfficeROSEBURG, OR, 97470, USA
Office AddressROSEBURG, OR, 97470, USA
Contacts

Full Description

Show more
Layng Creek Structural-Plate Pipe Arches on the Cottage Grove Ranger District; Work is located in the City of Cottage Grove municipal watershed and includes excavation, culvert removal, construction of two structural-plate pipe arches, riprap work, embankment, aggregate and hot asphalt surfacing, associated drainage work, and related road reconstruction activities; Work is limited to the period between June 1 and September 30 with completion by 2003; This is a Request For Proposals; In addition to price proposals Offerors are required to complete a Questionnaire; Detailed Technical Proposals are not required; Technical response elements include descriptive site-specific technical approach and equipment capability, proposed sedimentation control practices and past performance history; Award evaluation criteria include technical approach, equipment capability, and past performance history in addition to price; Award may be made without discussions; This project may include option items for additional related work; The project magnitude is in the range between $100,000 and $250,000; NAICS 234110; See Note 27; current HUBZone certification is required.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A Degasifier Package (Project No. 25-4261A). The scope of work involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key deliverables include power washing the vessels, replacing media support grids and differential pressure gauges, performing vessel disinfection, and resealing access doors. To ensure continuous plant operation, the contractor must work on only one unit at a time. The project requires a contractor with a project manager possessing at least five years of experience and a track record of at least five similar degasifier servicing projects, as well as the provision of a factory-trained service technician for performance testing. Bids must be submitted electronically via the OpenGov portal by November 4, 2026, at 3:00 PM. The contract will be awarded to the lowest responsive and responsible bidder. Financial requirements include a bid guarantee of 5 percent of the bid amount and the provision of performance and payment bonds. Comprehensive insurance coverage is mandated, including general liability, pollution liability, and vehicle liability, with the City of Hollywood named as an additional insured. The project timeline specifies substantial completion within 180 days and final completion within 210 days, with liquidated damages set at 500 dollars per day. Additionally, the contractor must comply with federal prevailing wage requirements for Broward County and provide a twelve-month warranty against poor workmanship and faulty materials.
Public Utilities

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS