Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 18, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Mill Creek Public Restroom Site Preparation

Closed
W912EF-12-R-SS30Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Mill Creek Dam 3211 Reservoir Road Walla Walla WA 99362-8401 US, WA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Jun 25, 2012 to Jun 26, 2012. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts1 person available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA
Contacts
Connie CochranContract Specialist

Full Description

Show more
The US Army Corps of Engineers, Walla Walla District is seeking small business sources for a construction project entitled: Mill Creek Public Restroom Site Preparation. The work is located at Mill Creek Dam, Walla Walla County. This will be a firm-fixed price construction contract. Construction magnitude is between $100,000 and $250,000, and 100% performance and payment bonds will be required. The North American Industry Classification System (NAICS) Code for this project is 237110 and the associated small business size standard is $33,500,000. This is sources-sought announcement is a tool to identify businesses with the capability to accomplish the work. This is not a solicitation. Only those firms who respond to this announcement by submitting the following information will be used in determining whether to set aside this requirement. 1) A list of current or past projects demonstrating technical experience with work of a similar nature to that listed in the Summary Scope of Work. For each project submitted, provide a brief narrative statement of the work your firm accomplished, your firm's role in the project (prime or sub), the dollar value and the completion date (or projected completion date). 2) A reference list for each of the projects submitted in #1 above. Include the name, title, phone number and email address. 3) Provide a statement of your firm's bonding capacity. A letter from your surety is not required. 4) Provide a statement of your firm's business size and type (HUBZone, Service Disabled Veteran Owned, 8(a), or woman-owned). 5) Provide a statement that your firm intends to submit an offer when the project is formally advertised. 6) Provide your firm's CAGE code and DUNS number. Submit this information to CONNIE COCHRAN, Contract Specialist, via email to Yi.Cochran@usace.army.mil. Your response to this notice must be received before 2:00PM on June 25, 2012. Summary Scope of Work This construction project involves the site preparation that is required for the installation of two new pre-fabricated restroom facilities. This project does not include providing or installing the two new pre-fabricated restrooms; this is for site preparation only. Currently, there are two restroom facilities at Mill Creek Dam. One is located at the Existing Mill Creek Project Office (EMCPO) and one is located near Bennington Lake; both in Walla Walla, Washington. EMCPO restroom- The Contractor shall: 1. Provide and install a new 1,250 gallon septic tank and a sewage pump tank; 2. Provide and install new stub-outs piping for water, sewer and electrical connections; 3. Provide and install a fiber optic line between the New Mill Creek Office building and the existing Mill Creek Maintenance Building; 4. Trench for electrical conduit placement from an existing electrical pull box to the restroom site and to the new contractor provided/installed sewage pump tank; 5. Trench for electrical conduit placement from an existing electrical pull box to the existing Mill Creek Maintenance Building. This will include cutting across the asphalt road way, removing the asphalt and repairing to match the existing roadway conditions; 6. Pull fiber optic line from the New Mill Creek Office building to the Mill Creek Maintenance Building; 7. Cut asphalt and remove existing asphalt at the restroom location and perform ground site preparations; 8. Connect the two electrical circuits from a meter to the restroom site and the sewage pump tank Bennington Lake (BL) restroom: The Contractor shall-- 1. Perform ground site preparation; 2. Provide and install new stub-outs piping for water, sewer and electrical connections; 3. Re-establish electrical connections from the restrooms site to the existing water pump, the existing well water level instrumentation, and the existing sprinkler system; 4. Place an 8 foot by 17 foot concrete pad in front of the restroom; 5. Remediate an existing 150-gallon septic vault by filling in the vault with concrete; 6. Place an additional 16 foot by 20 foot concrete pad on a portion of the existing gravel parking lot

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA002
The US Army Corps of Engineers, Walla Walla District, is soliciting a firm fixed price contract for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at Dworshak Dam. This total small business set-aside project requires the contractor to provide all personnel, materials, equipment, and supervision necessary for the pickup, dry-blast cleaning to white metal, weld repair, and new coating application of the bulkheads. The work must be performed in accordance with strict industry standards, including AWS D1.1 for welding and SSPC SP 5 / NACE No. 1 for surface preparation. Deliverables are scheduled across multiple units, with specific return dates such as January 23, 2027, for Unit 4 and April 19, 2027, for Unit 5. The contractor must be a certified SSPC QP 3 painting contractor or hold an AISC Complex Coatings endorsement and provide a third-party certified coatings inspector at the SSPC-PCI Level 2 or NACE CIP Level 2. Quality assurance is paramount, requiring detailed inspection reports for each bulkhead and the use of magnetic flux thickness gages per ASTM D7091. The government reserves the right to conduct quality assurance inspections at the contractor's facility. Proposals are due by October 30, 2026, and will be evaluated based on price and other factors to determine the most advantageous offer. All shipping is required to be FOB destination to the Dworshak Project Office in Ahsahka, Idaho.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

4 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS