Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 2, 2003. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Mouth of the Columbia, Columbia River and Coos Bay Maintenance Dredging 2003

Awarded
DACW57-03-B-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves maintenance dredging at the mouth of the Columbia River and the Columbia River, with optional dredging services for the Coos and Yaquina Bay entrances. The scope of work includes hopper dredging and the placement of materials across multiple counties in Oregon and Washington, and may require pump ashore capabilities. The project has an estimated cost ranging from 1 million to 5 million dollars. The contractor must begin work within 20 calendar days of receiving the Notice to Proceed and complete all tasks, including final cleanup, within 160 calendar days. This procurement is open to both large and small business concerns, with a size standard for small businesses based on average annual receipts not exceeding 17 million dollars. The solicitation was managed by the Department of Defense under the Endist Portland office.

General Info

Contract Value

$3,980,611

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

OR, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
ContactsNo contacts available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
ContactsNo contact information available

Full Description

Show more
NA Mouth of the Columbia and Columbia River Maintenance Dredging 2003. Dredging Coos and Yaquina Bay Entrances optional. Hopper dredging and placement of materials, mouth of the Columbia River, Columbia River and optional Coos and Yaquina Bay entrances for Clatsop, Coos, Columbia, Lincoln and Multnomah Counties in Oregon, and Pacific, Wahkiakum, Cowlitz, and Clark Counties for Washington. May require pump ashore capability. Contractor required to commence work within 20 calendar days after the date of rece ipt of Notice to Proceed and complete the entire work not later than 160 calendar days (time stated for completion includes final cleanup of the premises). Estimated cost range is between $1,000,000 and $5,000,000. Invitation for Bid (IFB) No. DACW57-03- B-0002 will be available on or about 25 March 2003. Tentative bid opening date is on or about 24 April 2003 or 30 days after issue. This procurement is open to both large and small business concerns. The size standard, including all affiliates, with ave rage annual sales or receipts for the past three years not in excess of $17 million. Please indicate business size when requesting bid documents. Registration via the website is the preferred method at https://www.nwp.usace.army.mil. Direct administrat ive questions to Charles Clemens at +1 (555) 000-0000 and technical questions to Richard Cato at +1 (555) 000-0000. NAICS 234990

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 15 hours ago

DEADLINE

N/A
View Details
NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)
Solicitation # W9127N27BA007
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project, identified by solicitation number W9127N27BA007, has an estimated construction value between 25 million and 100 million dollars. The scope of work involves replacing primary chillers, installing four new chiller skid packages with 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system integrated with fire protection systems. The project requires extensive structural modifications, the installation of air-cooled and water-cooled systems, and the use of refrigerants that are not subject to future phase-out schedules. Construction is expected to take 1,004 calendar days following the Notice to Proceed and will occur within an active powerhouse containing high-voltage electrical equipment. Due to the nature of the work, contractors must adhere to strict safety protocols and may be required to perform asbestos abatement and lead mitigation. A critical requirement for award is CMMC Level 2 (Self) certification for the prime contractor and relevant subcontractors processing Controlled Unclassified Information. This is an unrestricted, full and open competition under NAICS code 238220, with a tentative solicitation issuance date of October 29, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 15 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
Federal
JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Solicitation # W9127N27BA009
The U.S. Army Corps of Engineers Portland District is soliciting firm-fixed-price bids for the repair and rehabilitation of Tainter Valves TV3 and TV4 at the John Day Lock and Dam in Klickitat County, Washington. The project scope includes crack and weld repair, seal replacement, and the procurement of spare bushings, with an estimated construction magnitude between $1,000,000 and $5,000,000. The work is categorized under NAICS 237990 and is a full and open competition. Mandatory requirements include adherence to EM 385-1-1 safety standards, CMMC Level 1 certification, and the provision of performance and payment bonds. Bidders must also comply with the Davis-Bacon Act and Buy American requirements. The solicitation includes mandatory price items for mobilization and the removal, transport, and repair of TV3, with optional line items for the same services for TV4. Evaluation will include a 10 percent price preference for HUBZone small business concerns and a review of subcontracting plans to ensure goals for small businesses and HUBZone firms are met. Bids must be submitted in PDF format to the designated contracting personnel by 11:00 A.M. PDT on November 19, 2026. Site visits were scheduled for November 3, 2026, requiring attendees to be U.S. citizens with a REAL ID. Performance is expected to begin within 10 calendar days of award, with specific completion timelines of 143 to 233 calendar days depending on the line item.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS