Y--Multiple Award Task Order Contract (MATOC) for Construction and/or Design/Build of Tactical Equipment Maintenance Facility (TEMF) for the Southeast Region (AL, FL, GA, KY, MS, NC, SC, and TN.
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract establishes a Multiple Award Task Order Contract (MATOC) for the construction and/or design-build of Tactical Equipment Maintenance Facilities (TEMFs) across the Southeast Region, including Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, and Tennessee. The initial task, referred to as the Seed Project, is situated at Fort Stewart, Georgia, and serves as a basis for evaluating Phase II of the contract. The contract has a base period of three years or a maximum value of $60 million, whichever is reached first, and is restricted to eligible 8(a) small business concerns. It is anticipated that three to four contractors will be awarded within the pool, which collectively share the contract's total capacity. Task orders will be firm-fixed price, ranging from $10 million to $25 million for the Seed Project, with possible options included. The work involves design and/or construction of facilities tailored for the maintenance, repair, and storage of military tactical vehicles and equipment, often requiring extensive concrete hardstand areas, fencing, and related site development, with typical HVAC provided by self-contained units. Proposals will be solicited electronically and evaluated under a Best Value Trade-Off methodology governed by Federal Acquisition Regulation (FAR) Subpart 36.3, using a two-phase design-build process. Phase I evaluation emphasizes corporate relevant specialized experience as the highest priority, followed equally by past performance and technical approach narrative, while Phase II evaluates detailed design technical factors—including building function, aesthetics, quality of building systems, site design, and sustainable design—with these non-cost factors combined being significantly more important than price. Additional considerations in Phase II include proposed contract duration, schedule, and small and disadvantaged business utilization. The government reserves the right to reject any bids and may consider external data, although final acceptability rests with the offeror. Registration in the Central Contractor Registration and the Federal Technical Data System is required to access solicitation documents, and all communication will be via specified electronic platforms.
General Info
Place of Performance
US Army Corps of Engineers, Savannah P.O. Box 889, Savannah GA 31402-0889, GASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → W074 Endist Savannah
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
