Y--AWARD SYNOPSIS: Northern Electrical Power System (NEPS) Phase IV, Afghanistan

Awarded
W912ER-14-R-0033Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

about 17 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

2 days ago

DEADLINE

in 14 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 7 days

General Info

Agency

N/A

Contract Value

$113,060,294

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

Response deadline changed from Aug 15, 2014 to Oct 23, 2014. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
SYNOPSIS: The U.S. Army Corps of Engineers (USACE), Transatlantic Middle East District (TAM) is seeking preliminary information, for market research purpose, from capable and reliable sources who may be interested in submitting a proposal to perform Design-Build (DB) construction for the Northern Electrical Power System (NEPS) Phase IV. This project is located on the Paktiya and Khost Provinces, Afghanistan. The resultant contract will be awarded as firm-fixed price. PROJECT SCOPE: This project will design and install approximately 95 kilometers of single circuit 220kV transmission lines and 30 kilometers of 20kV distribution lines. The transmission lines will run from Gardez to Khost, the capitals of Paktiya and Khost provinces, in eastern Afghanistan. The project also includes the construction of new substations at Waza-Khvajeh and Khost. The substations will be configured to support local power distribution. The Design Build contractor will perform assessments in Waza-Khvajeh to develop the design for 20kV distribution lines in the surrounding area. The Contractor will be required to provide all logistical support, and personnel and security for all work and logistics support areas throughout construction. Interested Contractors must also consider the following requirements: a. The Period of Performance is anticipated to be 730 calendar days. b. The magnitude of construction for the NEPS Phase IV is between $100,000,000.00 and $250,000,000.00. PROPOSAL PROCEDURES: The Government is considering the use of Request for Proposal (RFP) (FAR Part 15) procedures for this project. The intent is for the RFP to be issued Two Phase/Full and Open Solicitation. The Best Value Trade-off (BVTO) contracting method may be used to evaluate Phase One proposals and Lowest Price Technically Acceptable (LPTA) method may be used to evaluate Phase Two proposals. Evaluation criteria will be stated in the RFP. The Government may include options in the RFP. This acquisition may result in a single fixed price construction contract awarded based on BVTO/LPTA determination. SUBMISSION REQUIREMENTS: a. Provide your experience as a Prime Contractor completing large design and construction of 220kv and/or 110kv transmission lines and 20kv distribution lines including substations. All projects must be valued at least $50 Million in size or more. Provide a list of projects completed by your company that demonstrate your recent experience and ability to perform similar scope and size projects. b. Provide qualifications of your Key Personnel/Designer of Record's [Project Manager, On-Site Construction Superintendent, Safety Officer, Project Scheduler, Quality Control Manager, DOR's] in their assigned job position on this project as it relates to large design and construction of 220kv and/or 110kv transmission lines and 20kv distribution lines including substations c. Provide your capabilities to obtain Security at a fixed price effort for the duration of the project. d. Provide your capabilities for obtaining Performance and Payment Bonds or other acceptable sureties for this project, if awarded. See FAR Clause 52.228-15. e. Provide your concerns of any potential Risks or any other issues associated with this project such as Security and your Mitigation plan to overcome the situation. Firms submitting responses shall provide information on the projects that prove you can meet the qualifications criteria listed above, with contract number, project location, description of work, roles in the project execution and other references including subcontractors. Please complete the Attachment 1, as part of your submission. The following document is being provided under separate cover: quote mark Market Research Company/Project Information.docx quote mark PROPOSAL PERIOD: Phase One Design-Build (D-B) Solicitation may schedule for release on or about 15 August 2014. The Phase One proposals may be due on or about 16 September 2014. Phase Two Solicitation may schedule for release on or about 15 October 2014. Contract award is scheduled on or about 31 December 2014. This notice is for market research purposes only and is not a request for proposal (RFP) nor does it restrict the Government as to the ultimate acquisition approach. The Government will not reimburse respondents for any costs incurred in preparation of a response to this notice. Please provide a response in the affirmative or negative if your company is interested in participating in this opportunity no later than on July 10, 2014 at 4:00PM EST, sooner if at all possible. Questions concerning the processes and procedures can be sent to Michelle. R. Pearman, email; contact@example.gov and Tino Philip, e-mail: contact@example.gov.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS