Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 15, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Award Annoucment for Repairs to Bearskin Neck Stone Jetty, Rockport, MA

Awarded
W912WJ-14-B-0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

Awarded by the Department of Defense through the US Army Engineer District New England under solicitation W912WJ-14-B-0016, this project involves the reconstruction of the 540-foot-long Bearskin Neck Jetty in Rockport, Massachusetts. The jetty, which protects Rockport Harbor, suffered significant damage during Hurricane Sandy, resulting in deep voids along the crest and harbor side slope, as well as the complete loss of the jetty head and its associated US Coast Guard Aid to Navigation. The scope of work requires the delivery and installation of approximately 4,000 tons of 14-19 ton armor stone and 6,000 tons of 4-8 ton armor stone to restore the structure to its authorized dimensions. Key specifications include a crest elevation of +18.8 feet Mean Lower Low Water and side slopes of 1 vertical to 2.5 horizontal. The project involves substantial re-handling of existing stones to ensure proper interlocking, with the largest stones primarily used to reconstruct the 30-foot head of the jetty. Due to the size of the materials and environmental conditions, the execution plan necessitates the use of a crane and barge anchored on the harbor side, supplemented by equipment accessed via a temporary ramp or crane placement.

General Info

Contract Value

$3,303,004

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

W912WJ-14-B-0016 Repairs to Bearskin Neck Stones Jelly

PDF, Low priorityabstract-of-offers
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jun 25, 2014 to Aug 19, 2014. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
ContactsNo contacts available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA
ContactsNo contact information available

Full Description

Show more
The work of this project consists of repairing the 540-foot-long jetty that was damaged during Hurricane Sandy. The Bearskin Neck Jetty is located at the northern most end of Bearskin Neck Road in Rockport, Massachusetts, approximately 35 miles north of Boston, Massachusetts and 20 miles south of the New Hampshire-Massachusetts border. The jetty extends into the ocean from the end of Bearskin Neck Road to the east and provides protection to Rockport Harbor. The existing jetty consists primarily of 3-5 ton armor stone. The ocean side of the jetty has retained it shape/authorized dimension while 400 feet of the jetty contains voids 5 feet deep along the crest profile and voids 5-10 feet deep along the harbor side slope. The head at the east end of the jetty is missing along with the US Coast Guard Aid to Navigation that was mounted there. Specific work tasks are intended to reconstruct severely deteriorated areas of the 540-foot long jetty. These tasks include: Delivery and installation of approximately 4,000 tons of 14-19 ton armor stone and 6000 tons of 4-8 ton armor stone to repair the jetty to authorized dimensions. The completed repairs will provide a crest width of 18 feet for the first 400 feet, widening for the next 70 feet to a fixed width of 28 feet for the last 30 feet, at the head of the breakwater. Crest elevation is +18.8 feet Mean Lower Low Water (MLLW) and side slopes are 1 vertical: 2.5 horizontal for the entire length of the jetty. The work includes replacing displaced armor stone to fill in existing gaps in the jetty. A majority of the 18-19 ton stone will be used to reconstruct the last 30 feet, which is the head of the jetty. Repairs will require substantial moving and re-handling of existing stones to obtain the required interlocking placement. Mean High Water (MHW) in Rockport is 9 feet and approximately 6 days per month during the construction window seas can be expected to be in excess of 4 feet. It is expected that a crane and barge, anchored on the harbor side of the jetty, will be required to handle the 18 ton stone. Some of the rework/handling of the smaller 3-5 ton stone can be performed by equipment on the jetty. That equipment can access the jetty via a temporary ramp from the culdesac at the landside end of the jetty, or by placing the equipment on the jetty with the crane.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 541330
New
Federal
Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission Boundaries
Solicitation # W912WJ27RA001
The U.S. Army Corps of Engineers New England District is establishing a Multiple Award Task Order Contract (MATOC) pool for Architect-Engineering services to support Hazardous, Toxic, and Radioactive Waste (HTRW) projects. The total value of the pool is up to $49,000,000.00, with awards anticipated for a minimum of three small businesses and up to three unrestricted contracts. Work will primarily be performed within the six New England states, New York, and New Jersey, but may extend to other areas within the North Atlantic Division mission area, including Pennsylvania, Delaware, Maryland, Virginia, West Virginia, and the District of Columbia. The scope of work includes CERCLA investigations, the development of Quality Assurance Project Plans, advanced risk assessments, remedial designs, and construction cost estimates using MII. All work must comply with the DERP statute, CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and applicable DoD and Army policies. The selection process is conducted under the Brooks Act, with primary evaluation factors focusing on experience in CERCLA investigations, handling emerging contaminants such as PFAS and 1,4 Dioxane, and the ability to meet state regulatory requirements in regions like Massachusetts, Connecticut, and New Jersey. Large firms are evaluated on their ability to execute $4 million per year, while small businesses are evaluated on a $1 million annual capacity. Secondary tiebreaker factors include geographic proximity to the mission area, the extent of small business participation for large firms, and the volume of DoD contract awards in the previous 12 months. Submissions must be made electronically via the PIEE Solicitation module by January 29, 2027, and must adhere to strict page limits of 65 pages for large firms and 50 pages for small businesses.
Engineering Services

POSTED

about 16 hours ago

DEADLINE

in 3 months
View Details
NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS