Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 3, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Repairs to the Jetties in Newburyport Harbor at Salisbury and Newburyport, MA

Awarded
W912WJ-15-B-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This award notice, solicitation number W912WJ-15-B-0004, outlines a project managed by the Department of Defense W2SD Endist New England for repairs to the jetties in Newburyport Harbor at Salisbury and Newburyport, Massachusetts. The scope of work involves repairing the 3100-foot-long North Jetty in Salisbury and the final 140 feet of the 1500-foot-long South Jetty in Newburyport, both of which sustained damage during Hurricane Sandy. The project requires approximately 30,000 tons of armor stone, including 5,000 tons of heavy 14- to 19-ton stone, to fill gaps and replace displaced core materials. Additional tasks include repairing a 190-foot stone spur off the North Jetty and replacing two navigation aid concrete bases. Technical specifications dictate crest widths between 5 and 15 feet and specific side slopes for the river and ocean sides. Logistics require stone delivery by water for the seaward sections, while land or water access is permitted for the landward half of the North Jetty. Staging and storage will be located on Massachusetts Department of Conservation and Recreation property in Salisbury, with a requirement to restore any damaged areas to their original condition. The contract duration extends from the Notice to Proceed through March 31, 2016, with no seasonal constraints on the work despite expected periodic high seas in the river mouth.

General Info

Contract Value

$10,181,713.68

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Bid Abstract - North Newport Fire Truck Station

PDF, Low prioritybid-abstract
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jan 14, 2015 to Feb 23, 2015. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
ContactsNo contacts available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA
ContactsNo contact information available

Full Description

Show more
Award announcement for Jetties in Newburyport Harbor at Salisbury and Newburyport, MA. The work consists of repairing the 3100-foot-long North Jetty in Salisbury and completing repairs to the remaining (most seaward) 140 feet of the 1,500-foot-long South Jetty in Newburyport that were damaged during Hurricane Sandy. Approximately 30,000 tons of armor stone will be required - including approximately 5,000 tons of 14- to 19-ton armor stone. Crest width varies from 5 to 15 feet. Crest elevation at the most seaward end is +12.3 feet mean lower low water (mllw), and +17.3 mllw at the landward end. Side slopes are 1 vertical:1 horizontal on the river side and 2 horizontal:1 vertical on the ocean side. The work includes replacing displaced core and armor stone to fill in existing gaps in the jetty. Repairs will require substantial moving and rehandling of existing stones to obtain the required interlocking placement. Work also includes repair of a 190-foot-long stone spur off the North Jetty, approximately 600 feet seaward from the beginning of the jetty, and removal of two Navigation Aids (metal towers and concrete bases) from the North Jetty, and installation of new concrete bases. About 6 days per month during the construction window seas can be expected to be in excess of 8 feet in the river mouth. Stone deliveries to the jetties shall be done by water for the seaward half of the North Jetty and for the entire 140-foot portion of the South Jetty. Equipment and stone delivery and access to the jetty may be performed from land, water, or a combination for the landward half of the North Jetty. It is expected that there will be no seasonal constraints on the work. The expected storage/staging area for the stone, equipment, and trailer is on MA Department of Conservation & Recreation (DCR) property in Salisbury. Any DCR property, including the parking lot, dunes, and any excess vegetation damaged will be restored to their pre-construction condition. Contract duration is within 15 days from Notice to Proceed through March 31, 2016.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 541330
New
Federal
Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission Boundaries
Solicitation # W912WJ27RA001
The U.S. Army Corps of Engineers New England District is establishing a Multiple Award Task Order Contract (MATOC) pool for Architect-Engineering services to support Hazardous, Toxic, and Radioactive Waste (HTRW) projects. The total value of the pool is up to $49,000,000.00, with awards anticipated for a minimum of three small businesses and up to three unrestricted contracts. Work will primarily be performed within the six New England states, New York, and New Jersey, but may extend to other areas within the North Atlantic Division mission area, including Pennsylvania, Delaware, Maryland, Virginia, West Virginia, and the District of Columbia. The scope of work includes CERCLA investigations, the development of Quality Assurance Project Plans, advanced risk assessments, remedial designs, and construction cost estimates using MII. All work must comply with the DERP statute, CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and applicable DoD and Army policies. The selection process is conducted under the Brooks Act, with primary evaluation factors focusing on experience in CERCLA investigations, handling emerging contaminants such as PFAS and 1,4 Dioxane, and the ability to meet state regulatory requirements in regions like Massachusetts, Connecticut, and New Jersey. Large firms are evaluated on their ability to execute $4 million per year, while small businesses are evaluated on a $1 million annual capacity. Secondary tiebreaker factors include geographic proximity to the mission area, the extent of small business participation for large firms, and the volume of DoD contract awards in the previous 12 months. Submissions must be made electronically via the PIEE Solicitation module by January 29, 2027, and must adhere to strict page limits of 65 pages for large firms and 50 pages for small businesses.
Engineering Services

POSTED

about 16 hours ago

DEADLINE

in 3 months
View Details
NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS