Y1DZ--556-23-104 CON: Chilled Water Piping from Bldg.188 to Bldgs. 1, 3 and 48

Awarded
36C25226B0027Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation, issued as a Sealed Bid (IFB) under number 36C25226B0027, is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for the installation of chilled water piping from Building 188 to Buildings 1, 3, and 48 at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project, identified by number 556-23-104, encompasses all labor, tools, and materials needed to construct a fully functional chilled water supply and return system, with work to be completed within 360 calendar days after receipt of the Notice to Proceed. The estimated contract value ranges between $2 million and $5 million, with a lump-sum bid structure requiring detailed cost breakdowns by material, quantity, unit price, and labor by trade. Only SDVOSBs certified in the SBA database are eligible, and offerors must complete and submit a formal certification on limitations on subcontracting; failure to meet these requirements renders a bid ineligible. All bidders must maintain up-to-date registration in the System for Award Management (SAM), including annual representations and certifications updated within the last 12 months. The work is governed by extensive technical and administrative requirements, including adherence to VHA Master Specifications, Division 00–48, and applicable sections of sustainable design, firestopping, plumbing, boiler plant, and HVAC standards. Packaging and material handling mandates strict compliance with manufacturer-original sealed packaging, legible labeling including manufacturer name, type, color, production run number, and manufacture date, and storage conditions ensuring materials remain protected in dry, weathertight facilities. Contractors must submit a Quality Control Plan, Accident Prevention Plan, and one complete set of shop drawings, product data, samples, and Safety Data Sheets prior to mobilization, all accompanied by signed affidavits of compliance. Safety regulations require a dedicated Site Safety and Health Officer, separate from supervision or quality control roles, and specialized Competent Persons for asbestos, electrical, cranes, demolition, fall protection, fire safety, scaffolding, trenching, and other high-risk activities, in compliance with USACE EM 385-1-1 and 29 CFR 1926. All contractors must also comply with the Buy American Act for construction materials and state or local prevailing wage rates. Payment requests must be submitted electronically via the VA’s EIPPS system

General Info

Installation of chilled water piping between VA buildings, solicitation by Department of Veterans Affairs.

Agency

Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)View Agency

Contract Value

$3,464,800

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

WI

Set-Aside

SDVOSBC

Awardee

TROOP CONTRACTING INCView Profile

Award Issued Date

Documents

(29)

Amendment 0001 to IFB Solicitation 36C25226B0027 for Chill Water Piping Project

DOCXamendment

Pre-Solicitation Notice Rev1 for Solicitation 36C25226B0027 Chilled Water Piping Project

DOCXpresolicitation

Amendment 0005 to IFB Solicitation 36C25226B0027 for Chill Water Piping Project

DOCXamendment

Amendment 0004 to IFB Solicitation 36C25226B0027 Chill Water Piping Project

PDFamendment

VAAR 852.219-75 Notice of Limitations on Subcontracting Certificate DEVIATION REQUIRED

PDFcertificate-of-compliance

IFB Sol 36C25226B0027 Asbestos Survey Report for Building 188

PDFreport

Specifications for Chilled Water Project 556-23-104 IFB 36C25226B0027

PDFspecifications

IFB 36C25226B0027 Pre-Bid RFI Responses Amendment 0004

XLSXrfi

IFB Sol 36C25226B0027 CD Drawings 556-23-104

PDFother

IFB Solicitation 36C25226B0027 Asbestos Survey Report for VA Lovell FHCC Tramway

PDFifb

IL20260008 Wage Determination for Building and Residential Construction in Illinois

PDFwage-determination

Amendment 0003 to IFB 36C25226B0027 for Captain James A. Lovell FHCC

PDFamendment

IFB 36C25226B0027 Pre-Bid RFI Responses for Chilled Water Piping Project

XLSXrfi

Amendment 0002 to IFB Solicitation 36C25226B0027 for Chill Water Piping Project

DOCXamendment

Amendment 0001 to IFB Solicitation 36C25226B0027 Chill Water Piping Project

PDFamendment

IFB 36C25226B0027 Walk-Thru Sign-In Sheet

PDFsign-in-sheet

IFB 36C25226B0027 Pre-Bid RFI Responses Ver 1 06232026

XLSXrfi

Solicitation 36C25226B0027: Chilled Water Piping Expansion Project

DOCXpresolicitation

IFB Sol 36C25226B0027 Asbestos Survey Report Building 3

PDFreport

Amendment 0004 to IFB Solicitation 36C25226B0027 for Chill Water Piping Project

DOCXamendment

Amendment 0003 to IFB Solicitation 36C25226B0027 for Chill Water Piping Project

DOCXamendment

36C25226C0043_1.docx

DOCX

IFB 36C25226B0027 Chill Water Piping Project at Captain James A. Lovell FHCC

DOCXifb

Amendment to Presolicitation Notice 36C25226B0027 for Chilled Water Piping Project

PDFamendment

Amendment 0002 to IFB Solicitation 36C25226B0027 Chill Water Piping Project

PDFamendment

IFB 36C25226B0027 Pre-Bid RFI Responses Amendment 0003

XLSXrfi

Amendment 0005 to IFB Solicitation 36C25226B0027 Chill Water Piping Project

PDFamendment

Illinois Construction Wage Rates IFB 36C25226B0027 Amendment A-0003

PDFwage-determination

Amendment 0003 to IFB Solicitation 36C25226B0027

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
Contacts1 person available
OfficeMILWAUKEE, WI, 53214, USA
Organization / Agency
Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
View Agency Profile
Office AddressMILWAUKEE, WI, 53214, USA
Contacts
Hudell D. BallenContract Specialist

Full Description

Show more
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=66abeb70f2a7475fad6eb82fea28f1d3

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 10 hours ago

DEADLINE

in 1 day
View Details

More opportunities from Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)

Same awarding agency

NAICS: 517111
New
Federal
FHCC Satellite TV Installation and Programming
Solicitation # 36C25226Q0706
The Department of Veterans Affairs Great Lakes Acquisition Center is soliciting quotes for the installation and annual programming of a DirecTV COM3000 Advanced Entertainment Platform system at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves upgrading television services in Building 133 to provide high-quality linear satellite and broadband over-the-top content for patients, staff, and visitors. Key technical requirements include the installation of 100 Pro:Idiom converter boxes and a system capacity of 92 channels, consisting of 86 cable channels and 6 in-house channels. The programming package must include DTV Locals, a Regional Sports Package, and a VIP Service Plan, supporting a total of 263 units. The contract structure consists of a base year running from September 15, 2026, to August 31, 2027, with four optional one-year extensions through August 31, 2031. Installation must be completed within 60 calendar days of the award. This is a HUBZONE Small set-aside procurement, and the government will evaluate quotes based on technical capability and the best benefit to the government, with preference given to SDVOSB/VOSB entities. All work must comply with OSHA, NFPA, and VA safety and infection control standards. Payments are processed monthly in arrears via electronic funds transfer through the Tungsten Network e-Invoicing system.
Wired Telecommunications Carriers

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 238290
New
Federal
Z1DA--Construction of Ogden Elevator Cab Interiors Jesse Brown Medical Center
Solicitation # 36C25226B0033_1
Solicitation 36C25226B0033 is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform interior upgrades for four elevators—P-7B, P-8B, P-9B, and freight S-10B—located in Building 11B of the Ogden Pavilion at the Jesse Brown VA Medical Center in Chicago, Illinois. The project objective is to match the design of elevator cab P-6B, which features ViviGraphix Graphica Cairo Slate Blue panels, diamond finish stainless steel ceilings with 3,200K LED downlights, and Nurazzo tile flooring. The scope includes the potential raising of elevator sills and doors to ensure flush tile installation. The project magnitude is estimated between $250,000 and $500,000, with a total performance period of 154 calendar days from the notice to proceed. Award will be granted to the responsible bidder providing the lowest priced responsive bid. Bidders must provide a bid guarantee of at least 20 percent of the bid price and submit current Experience Modification Rate (EMR) data and OSHA 300/300a forms. The contractor is required to adhere to the Davis-Bacon Act wage determinations for Cook County and maintain compliance with ASME A17.1 safety codes for elevators and escalators. Strict infection control measures are required per the ICRA renewal permit, and all construction debris must be removed daily. Key administrative requirements include the submission of daily contractor production reports (VA Form 10101) and the provision of performance and payment bonds upon award.
Other Building Equipment Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS