This Government Contract opportunity from Department Of Defense was posted on October 1, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Yellowstone Intake Replacement Weir and Fish Bypass Channel Project

Awarded
W9128F18B0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 1 hour ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 15 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Yellowstone Intake Replacement Weir and Fish Bypass Channel Project, identified by solicitation number W9128F18B0006, is an award notice issued by the Department of Defense through the W071 Endist Omaha office. The project is categorized under NAICS code 237990 and will be performed in Glendive, Montana. Key points of contact for the contract include Contracting Officer Lee M. McCormick and Lynne D. Reed. Prospective vendors are required to submit all non-proprietary inquiries, questions, and comments via the ProjNet system using the specific Bidder Inquiry Key HJ8G2Z-94YZXZ. To ensure consideration, submissions must be made at least ten calendar days before the bid opening. While the electronic system is the primary method for communication, phone calls for non-technical or procedural matters are permitted Monday through Friday between 8:30 a.m. and 3:30 p.m. Central Standard Time.

General Info

Contract Value

$44,802,009.7

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USACE District, Omaha, Lower Yellowstone River Intake, GLENDIVE, MT, 59330, USA

Set-Aside

NONE

Award Issued Date

Documents

13

18_B_0006_Bid_Abstract_23_August_2018.pdf

PDF

1_ATT_31_00_00_All_Testing.pdf

PDF

2_ATT_31_00_00_TP_1-4.pdf

PDF

3_ATT_31_00_00_TP_5-11.pdf

PDF

4_ATT_31_00_00_Binder_Piezo_Diagram_and_Dev_and_Resp_Tests.pdf

PDF

Amendment_0001.pdf

PDF

Amendment_0002_Dwgs.pdf

PDF

Amendment_0002.pdf

PDF

Amendment_0003.pdf

PDF

Drawings_Fish_Bypass_Channel_Intake_MT.pdf

PDF

Intake_Pre_Bid_Q_A_Final_2015_07_20.pdf

PDF

W9128F18B0006_-_Yellowstone_Intake_Solicitation.pdf

PDF

Yellowstone_Site_Visit_Sign_In_Sheets.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

11 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 16, 2018 to Aug 23, 2018. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts

Full Description

Show more
Federal Business Opportunities Information Date: 2018 June 27 SOLICITATION NO. W9128F18B0006 On or about 12 July 2018, this office will issue Invitations for Bid for construction of the Fish Bypass Channel & Replacement Weir, Lower Yellowstone River Intake, MT. The solicitation will close on or about 14 August 2018. This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. It is highly suggested that Contractors attend the site visit, to allow them the best opportunity to fully understand the scope of this project. Prospective bidders will be given a site visit of the construction site approximately two weeks after issuance of the Invitation for Bids. The exact date and time of the site visit will be included in the solicitation. Contractors are to meet in the parking lot adjacent to the Cenex Gas Station on Highway 16 just south of the exit off of Interstate 94, in Glendive Montana. DO NOT submit requests for plans and specifications to the site visit personnel listed above. See - Obtaining Solicitation Documents' below. _______________________________________________________________________________ Project Description: (Approx. quantities) Construct a replacement irrigation diversion weir across the Lower Yellowstone River and fish bypass channel through Joe's Island. The weir consists of a steel W-pile section foundation with reinforced concrete crest structure capping it, and will be upstream of an existing wooden weir constructed in 1911-1912, with riprap placed between the weirs. Ninety-four W-pile sections are driven to a depth of approximately 37 feet. The weir length is approximately 700 linear feet and amount of formed reinforced concrete is approximately 500 cubic yards. The construction requires the use of sheet pile coffering and constructed in segments in order to not block the entire river. Bypass channel will be approximately 2.2 miles long with ~75-foot bottom width, ~200-foot top width, ~18 feet average excavation depth with varying side slopes. The channel side slopes will be protected with a layer of riprap on bends, the invert and side slopes protected with cobbles processed from the excavation, and the entrance and exit and two locations within the channel protected with riprap structures. The channel excavation requires intense dewatering system to be designed by the Contractor, and earthen cofferdams at the channel entrance and exit. Approximate quantities are as follows: ~980,000 CY of excavation, ~99,000 Tons of quarried riprap, and ~34,000 CY of cobbles for invert protection. Most of the excavation will be wasted on Joe's Island in an existing natural high-flow channel for a length of ~9000 feet. Project will also require seeding and planting of trees and resurfacing an access road for approximately 6000 linear feet. Relocation of a historic wooden cableway tower and a building to new locations, and removal and coiling of cable that spans the river. The work scheduling will be affected by irrigation and fish passage dates. The estimated construction cost of this project is between $40,000,000 and $50,000,000. _______________________________________________________________________________ The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 900 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. Bidders (Offerors): Please be advised of on-line registration requirement for Representations and Certifications Application (ORCA) is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov). Find solicitation announcement in Fed Biz Opps (www.fbo.gov) 1. Use the - Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the - Find Opportunities' (large arrow in the middle of the page) or use the - Opportunities' tab followed by the - Advanced Search' tab. 2. By using the - login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading - All Files' or from the - Packages' tab. 4. If you want other vendors, sub-contractors or contractors to contact you, click on the - Interested Vendors' tab and then - Add me to Interested Vendors' link at the bottom of the page. Questions regarding contractual matters should be made to: Lynne Reed +1 (555) 000-0000. Commander U.S. Army Engineer District, Omaha ATTENTION: CENWO-CT-C 1616 Capitol Avenue Omaha, NE 68102 4901

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS