Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on December 13, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

York Street Reconstruction LUC-CR-2231-0.00

Closed
10003906State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving and storm sewer improvements. Key work items include the installation of 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in stone trench, and 2,800 feet of modified concrete curb and gutter, along with manholes and catch basins. The engineer's estimate for the project is 1,111,000 dollars. Encrypted bids must be submitted via the Bid Express e-bidding system by 11 a.m. local time on Thursday, November 12, 2026. To be considered, bidders must be prequalified by the City of Zeeland and include a proposal guarantee in the form of a bid bond or certified check for five percent of the total bid. The contract will be awarded based on the summation of unit prices, and unbalanced or incomplete bids will be disqualified. The project is entirely funded by the City of Zeeland and must be completed by April 30, 2027, with liquidated damages of 1,000 dollars per calendar day for delays. The selected contractor must provide performance and lien bonds each totaling 100 percent of the contract value and file certification of Workmen's Compensation Insurance. Payments will be made monthly at 90 percent of the value of work performed, with the City retaining 10 percent until final acceptance, subject to a 5 percent cap for Public Agency Contracts under MI PA 524 of 1980. Inspection and materials testing will be managed by Moore & Bruggink, Inc., and the contractor is required to implement a quality control plan following Division 5 of the MDOT Standard Construction Specifications.
Moore & Bruggink, Inc

POSTED

about 8 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
2026 St. Mary¿s Dr. Storm Improvements & Paving
Solicitation # PE-66212-NONST-2027-000000036
The 2026 St. Marys Dr. Storm Improvements and Paving project, issued by the City of Waycross, Georgia, focuses on critical infrastructure upgrades and road resurfacing on St. Marys Dr. The scope of work includes the removal and replacement of 30 linear feet of 24-inch RCP with 30-inch RCP, the replacement of two double wing catch basins, and the installation of approximately 100 linear feet of curb and gutter. Additionally, the project requires sealing connections for two 15-inch HDPE storm pipes protruding into a 30-inch CMP. Paving improvements consist of approximately 2700 linear feet of milling and overlay, including an open-graded interlayer, asphalt leveling course, pavement striping, and patching, supported by traffic and erosion control measures. This project is funded through LMIG and requires all bidding contractors to be licensed by the State of Georgia. Bidders must be registered with Quest/ESG Engineering, Inc. as having purchased the complete bidding documents, which are available digitally via QuestCDN. Sealed bids must be submitted to the City Manager's Office by December 10, 2026, at 2:00 PM. Bids must include a bid bond or certified cashier's check for at least 5% of the base bid. The successful awardee will be required to provide performance and payment bonds each equal to 100% of the contract price.
City of Waycross

POSTED

about 8 hours ago

DEADLINE

in 30 days

AI Contract Overview

Show more

This project involves reconstructing approximately 0.9 miles of pavement along York Street, extending from Front Street to the city limits in Ohio. The scope of work includes removing and replacing the existing pavement, curb and gutter, and drive approaches, along with minor drainage improvements to ensure proper water management. Additionally, the project entails completing the sidewalk installation on the south side of York Street, enhancing pedestrian infrastructure and safety. The contract was solicited under the title "York Street Reconstruction LUC-CR-2231-0.00" with a solicitation number of 10003906, posted on December 13, 2019, with a response deadline of January 14, 2020. The project falls under the NAICS code 237310, which pertains to highway, street, and bridge construction, and is managed by the Ohio Department of Public Utilities/Engineering Services. Bidders interested in this project must comply with specific requirements, including a City of Toledo Court Ordered Child Support Compliance affidavit for contracts exceeding $10,000. This affidavit mandates disclosure of any individual owner or shareholder with a 25% or greater interest who is subject to court-ordered child support, certifying compliance with such obligations. The document must be notarized and submitted as part of the bidding process to ensure adherence to local compliance policies. The project aims to improve transportation infrastructure within the city, supporting both vehicular and pedestrian traffic, and contributing to the area's overall urban development and safety improvements.

General Info

Documents

3
PDF, High priority: read this firstspecifications
High
DOC, Low priority3 pages · other
Low
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → DPU/Engineering Services
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project will reconstruct 0.9 miles of pavement on York Street, from Front Street to City Limits. This includes removing and replacing the pavement, curb and gutter, and the drive approaches, minor drainage improvements, and completing the sidewalk on the South side of York Street.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS