Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on March 20, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Airfield Paving

Awarded
FA4887-07-R-0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 6 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
PLEASURE ISLAND PARKING LOT PAVEMENT IMPROVEMENT PROJECT
Solicitation # P27-002
The City of Port Arthur, Texas, is soliciting bids for the Pleasure Island Parking Lot Pavement Improvement Project, which involves the construction of an asphalt parking lot replacement. The project requires the contractor to provide all necessary labor, materials, equipment, and superintendence to deliver the installation in full operating condition. Key deliverables include the installation of electrical conduits, concrete wheel stops, and the digging and grading of drainage swales, as well as ADA-compliant striping and signage. The work must be completed within 90 calendar days, and the award will be based on the time required for completion and the technical standards of the bid. Bidders must provide a bid guarantee of at least five percent and are required to furnish payment and performance bonds if the contract exceeds 50,000 and 100,000 dollars, respectively. The contract is subject to the Davis-Bacon Act and Executive Order 11246 regarding equal employment opportunity. Additionally, respondents must certify that they do not boycott Israel and are not listed on the Texas Comptroller's website as doing business with Iran, Sudan, or foreign terrorist organizations. A five percent retainage will be held from progress payments until final acceptance of all work. Successful bidders must submit a construction schedule within seven calendar days of notice and a detailed progress schedule and cost breakdown within fifteen days of contract execution.
City of Port Arthur

POSTED

about 12 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Contract FA4887-07-R-0012 is an Indefinite Delivery Indefinite Quantity (IDIQ) award for airfield paving and maintenance services at Luke Air Force Base and Gila Bend Air Force Auxiliary Field in Arizona. Executed as a total 8(a) competitive set-aside, the contract utilizes firm-fixed-price terms across a base year and two option periods, spanning from September 21, 2007, through September 20, 2010. The agreement carries a guaranteed minimum value of 25,000 dollars and a maximum ceiling not to exceed 15,000,000 dollars. The scope of work encompasses a wide range of construction and maintenance tasks, including excavation, grading, asphalt and concrete work, paint striping, and vegetation removal, all performed in accordance with Project NUEX 07-0500 specifications and Air Force Instruction 32-1042 standards for airfield marking. Contractors are required to provide detailed material submittals, including mix designs for aggregate and asphalt, and adhere to strict quality control and inspection protocols. Administrative requirements include electronic payment submission via Wide Area WorkFlow and compliance with Arizona Privilege Tax regulations. Award selection was based on a best-value source selection process that weighted past performance and technical acceptability alongside price considerations.

General Info

Contract Value

$0

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

AZ, USA

Set-Aside

NONE

Award Issued Date

Documents

17

07-R-0012 Airfield Pavement IDIQ Contract Document

DOC, High priority: read this first40 pages · contract-document
High

AFI 32-1042 Standards for Marking Air Fields

PDF, High priority: read this first11 pages · specifications
High

Amendment #1 to SBA 8(a) Program Contract Solicitation

DOC, High priority: read this first9 pages · amendment
High

Amendment #2 - Evaluation Factors for Award

DOC, High priority: read this first5 pages · amendment
High

Amendment 3 to IDIQ Contract for Airfield Pavement Maintenance at Luke AFB

DOC, High priority: read this first3 pages · amendment
High

Amendment 3 to RFP - Proposal Preparation Instructions Update

DOC, High priority: read this first5 pages · amendment
High

Amendment 4 to Solicitation 07R0012 for Airfield Paving Services

DOC, High priority: read this first41 pages · amendment
High

Bid Schedule for Airfield Pavements IDIQ FY07 at Luke AFB

XLS, High priority: read this firstbid-schedule
High

Conformed Contract 07R0012 for Airfield Paving at Luke AFB

DOC, High priority: read this first41 pages · contract-document
High

Past Performance Information Form

DOC, High priority: read this first3 pages · past-performance
High

Project NUEX 07-0500 Airfield Pavement Specifications at Luke AFB

DOC, High priority: read this firstspecifications
High

Responses to Questions for Solicitation

DOC, High priority: read this firstq-and-a
High

Schedule of Material Submittals for NUEX 07-XXXX FO2604

XLS, High priority: read this first15 pages · sow
High

Solicitation 07R0012 Airfield Paving Contract

DOC, High priority: read this first41 pages · rfp
High

DavisBacon20Jul07.doc - Unreadable Document

DOC, Low priority5 pages · other
Low

PASTPERFORMANCEQUESTIONNAIRE(2).doc

DOC, Low priority5 pages · other
Low

Attachment%234Drawings.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts2 people available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA
Contacts
Christopher E JonesContracting Officer
Gabriel C GrovesContracting Officer

Full Description

Show more
No Description Provided

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price solicitation, number F3YCFA6173AC01, is a 100 percent Small Business set-aside under NAICS 335921 for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting Radar Approach Control to several critical facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The installation will utilize a combination of existing manhole and handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, labor, and supervision, as no government-furnished equipment will be provided. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, evaluated based on design, a quality control plan, and performance history via the Supplier Performance Risk System. Technical teams must be certified to EFI&T TC Comm FOTS, and supervisors must hold factory certification from equipment manufacturers. All work must comply with strict environmental guidelines regarding hazardous materials and lead-based paint, and personnel must adhere to Department of the Air Force security and base access protocols. Final acceptance is contingent upon successful OTDR and Optical Power Meter testing in accordance with TIA 526-7 and a final project walk-through.
Fiber Optic Cable Manufacturing

POSTED

about 24 hours ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS