Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on July 12, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--BLM-CO HILL 71 TOWER REINFORCEMENT

Awarded
140L1722Q0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work includes the installation of 28 wood H-Frame tangent structures and one steel monopole dead-end on a drilled pier. Additionally, the project requires upgrading existing conductors and shield wires to 954 45/7 ASCR Rail conductor and 7/16 inch EHS steel shield wire, as well as the installation of .551 diameter fiber optic ground wire from Structure 107 to Dead-End Structure 79. The contractor is responsible for providing all necessary labor, supervision, tools, equipment, and miscellaneous materials. The contract will be awarded to the responsible bidder offering the lowest cost and best bid, with evaluation factors including price, technical conformance, schedule, qualifications, and performance history. Bids must be submitted in sealed hard copy form to the Procurement Department in Columbus, Nebraska, by December 2, 2026, at 2:00 PM. Required submission documents include the proposal page, price quotation table, bid security, and a W-9 form. The contractor must maintain comprehensive insurance, including workers compensation and commercial general liability, and provide a contract performance bond. A non-mandatory pre-bid teleconference and site visit are scheduled for November 23, 2026.
Nebraska Public Power District

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

1 day ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The BLM-CO Hill 71 Communications Tower Reinforcement project, solicitation 140L1722Q0009, involves the structural strengthening of a radio tower footing located near Lake City, Colorado. Managed by the Department of the Interior's Colorado State Office, the project was awarded based on Low Price Technically Acceptable criteria as a Total Small Business Set Aside. The scope of work includes specialized structural modifications and the use of specific materials such as Hilti epoxy and bond breaker tape, with an estimated project value between 25,000 and 100,000 dollars. The period of performance was established from July 18, 2022, to September 30, 2022, with payment issued on a lump sum basis upon completion. Due to the remote nature of the site, contractors were required to utilize high-clearance 4WD vehicles for access. The procurement process mandated a detailed technical response, three professional references, and a 20 percent bid bond. All labor must comply with the Colorado Heavy Construction Wage Determination, ensuring minimum hourly rates and fringe benefits for various labor classifications. Technical execution is governed by structural modification drawings and specifications based on a 2021 ISE Inc. report, requiring strict adherence to quality assurance and site verification protocols.

General Info

Contract Value

$53,200

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

8

Attachment 5 - Site Location

PDF, High priority: read this firstspecifications
High

GAOA Hill 71 Tower Reinforcement - Statement of Work

PDF, High priority: read this firstsow
High

General Decision Number C020220003 - Colorado Heavy Construction Wage Determination

PDF, High priority: read this firstwage-determination
High

LCO-11 Hill 71 Structural Modification Drawings and Specs

PDF, High priority: read this firstspecifications
High

Sol_140L1722Q0009_Amd_0002 - BLM-CO Communications Tower Reinforcement

PDF, High priority: read this firstamendment
High

Sol_140L1722Q0009 Amendment 0001 - BLM-CO Communications Tower Reinforcement

PDF, High priority: read this firstamendment
High

Solicitation 140L1722Q0009 - BLM-CO Communications Tower Reinforcement

PDF, High priority: read this firstrfq
High

Attachment_3_-_Engineering_Reports.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jun 13, 2022 to Jun 24, 2022. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Colorado State Office
Contacts1 person available
OfficeLakewood, CO, 80225, USA
Office AddressLakewood, CO, 80225, USA

Full Description

Show more
BLM-CO Communications Tower Reinforcement - Amendment 1 The purpose of this amendment is to reschedule the pre-bid site tour. Due to more snow on the mountain, travel conditions will not be suitable for another couple of weeks. The pre-bid is rescheduled until June 17th. Same time and place. The responses due date has been extended until 24 Jun, 2022. This is a solicitation to reinforce tower footings on Hill 71 (elevation 12000 feet) located near Lake City, Colorado . The tower was studied last year with the recommended and designer stamped reinforcement procedures described in the attachments. The work may required specialized skills and equipment. Access to the site is limited to high clearance 4WD with several steep water bars to cross. The Government estimates the rough order of magnitude for this project to between $25,000 and $100,000 with a budget toward the upper end of the scale. Site Visit: Tentatively 17 Jun 2022 - 11:00 AM - At the site. Stay tuned to this solicitation for changes. An update will be posted to confirm just before the date and if anything changes. High clearance 4WD required. Basic Contracting Requirements: 1. Active Registration -www.sam.gov 2. Invoicing and Payment - www.ipp.gov 3. FAR Part 12 - Construction Provisions and Clauses 4. FAR Part 13 - Simplified Acquisition Procedures 5. Construction Wages for Hinsdale County, CO 6. Bonding - 20% bid bond, 100% performance and payment 7. Total Small Business Set Aside 8. Award Basis - Low Price Technically Acceptable Instructions: Please update your marketing literature with your new SAM Unique Entity Identifier (UEI). It has already been assigned to you if you had an existing registration in SAM.Gov. To find it just log in to SAM and note your new 12 alpha-numeric ID. Starting from April 4th, the SAM UEI is the ONLY identifier the Federal Government uses to identify you in our systems. Your DUNS number was deleted from our systems and is no longer used for Federal Business. Contact me if you have questions about that or anything else related to the Federal Procurement process or setting up your filters and notifications in www.sam.gov to get first hand info on contracting opportunities. Minimum Requirements for Responsive Quote: 1. Filled out , Signed, dated and priced SF1442 2. Technical Response detailing your resources, capabilities, equipment along with recent and relevant 3. Bid Bond - 20% of bid 4. Email all items to the POC listed below no later than closing date of solicitation. POC: Contracting Officer Robert Hall - contact@example.gov - +1 (555) 000-0000

More opportunities from Department Of The Interior → Colorado State Office

Same awarding agency

NAICS: 236220
New
Federal
Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
Solicitation # 140L1726R0001
Solicitation 140L1726R0001 is a Firm Fixed Price construction project for warehouse improvements at the Montrose Public Lands Center in Montrose, Colorado. The scope of work includes asbestos abatement, bathroom remodeling, flooring replacement, installation of a new rooftop heating and cooling unit, and the replacement of a manual overhead door with an electric one. Additional requirements involve upgrading luminaires and electrical outlets, maintaining the metal roof, repairing existing overhead doors, and replacing a photovoltaic inverter. The project is a 100% Total Small Business Set-Aside under NAICS 236220, with a performance period scheduled from November 16, 2026, to May 30, 2027. The contract is governed by FAR Part 15 and FAR Part 36, with award based on Best Value using an acceptable/unacceptable rating for technical approach, experience, and past performance. Contractors must comply with Davis-Bacon Act wages for Montrose County and maintain active registration in SAM.gov. For contracts exceeding 150,000 dollars, 100% performance and payment bonds are required, and a bid guarantee of 20% of the bid price must be submitted. Invoicing is processed electronically through the Invoice Processing Platform with 14-day prompt pay and progress payments. The prime contractor is required to self-perform at least 15% of the contract value, excluding materials.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 1 day
View Details
NAICS: 237990
Federal
B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Solicitation # 140L1726R0010
Solicitation 140L1726R0010 is a total small business set-aside construction contract issued by the Department of the Interior's Colorado State Office. The project focuses on hydrologic restoration to benefit the endangered Gunnison sage-grouse in the Crawford, Colorado area. The primary objective is to improve drainage on approximately 7.75 miles of rural roads by installing 204 rolling dips and associated lead-out ditches. These structures are designed to redirect surface water off roadways and onto adjacent sagebrush vegetation to mimic natural hydrologic flow. Construction is strictly limited to a work window between August 30, 2027, and October 22, 2027, although the overall period of performance extends through October 29, 2027. The government will utilize a best-value tradeoff award method, weighing price equally against the combined factors of technical approach, past performance, and schedule. Technical requirements are stringent, requiring rolling dips to be constructed at approximately a 30-degree angle with a cross slope between 4% and 8%, and lead-out ditches not to exceed 57.5 feet in length. Performance is monitored via a Quality Assurance Surveillance Plan, with a 95% acceptance threshold for inspected structures and zero tolerance for disturbances in identified avoidance zones. The contract is subject to Davis-Bacon Act wage determinations and requires contractors to maintain liability insurance and provide resumes for key personnel demonstrating significant experience in project planning and well installation.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS