Bradbury Dam Outlet Valve Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Bradbury Dam Outlet Valve Replacement contract aims to enhance water release operations by replacing existing 30-inch valves with two new fixed-cone valves and accompanying equipment including hoods, butterfly valves, reducers, actuators, conductors, conduit, and grounding systems. Work will also involve installing a temporary pump system to maintain water supply during outages and designing two certified valve supports by a California-registered Professional Engineer. The project spans multiple construction divisions including concrete, metals, finishes, electrical, and waterway and marine construction, and must comply with ASME, ASTM, IEEE, NETA, NFPA, and RSHS standards. All materials must be stored and handled under strict environmental controls—temperature between 50°F and 95°F, protected from moisture, UV light, and weather—and must not exceed manufacturer shelf life. Packaging must remain original and unopened, with containers not exceeding 5 gallons unless suitable handling equipment is available. All containers and fasteners require clear, permanent labels including manufacturer name, product name, batch number, date of manufacture, and special instructions; cable and valve tags must have white backgrounds with black text, a minimum 7pt font size for markers and 16pt for tags, and be made of non-conductive, heat-resistant, non-corroding materials. Inspection and acceptance occur exclusively at the jobsite, governed by FAR 52.246-12, and include rigorous quality controls such as Dry Film Thickness verification per SSPC PA2, holiday testing per NACE SP 0188, and adhesion testing per ASTM D4541 as directed by the Contracting Officer’s Representative. Compliance with corrosion protection standards like ASTM A123 and ASTM A153 is required for coated materials, while welding must meet ASME BPVC-IX. Contractors must submit a comprehensive Safety Program approved prior to work commencement, including SOPs for confined space entry, working at heights, and hazardous material use. The Safety Professional must hold CSP, ASP, OHST, or CHST certification with at least three years of relevant experience, and the Contractor must provide an Onsite Safety Representative. Valley Fever awareness training is mandatory for all workers due to the location in endemic California counties, with annual renewal required under state law. The Government retains authority to issue stop orders for safety violations with no entitlement to time or cost adjustments, and may require a full-time Safety Professional at no additional cost if performance is inadequate. Material substitutions require written government approval and may trigger
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Interior → Mp-Regional Office
Same awarding agency
