Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 11, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Combined Synopsis/SolicitationForReplacement of Exterior Doors at the Memorial Amphitheater Arlington National Cemetery-Arlington,

Closed
W91WAW-09-P-0325Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This request for proposal, number W91WAW-09-P-0325, seeks a contractor to replace three deteriorated exterior oak doors and frames at the Memorial Amphitheater in Arlington National Cemetery. The project involves the removal of original early 20th-century doors that have suffered from dry rot and UV damage. The selected contractor is responsible for providing all labor, materials, and supervision to create shop drawings, fabricate new doors that match the existing architectural style, and perform the final installation. Key requirements include taking accurate on-site measurements, submitting material samples for approval, and integrating existing locking cylinders to maintain current master key systems. The government will award a firm-fixed-price contract based on the Lowest Price Technically Acceptable evaluation method. All work, including the provision of a written warranty and maintenance recommendations, must be completed within 30 days of the award date.

General Info

Contract to replace three exterior oak doors at Arlington National Cemetery within 30 days.

NAICS

321911 - Wood Window and Door Manufacturing

Place of Performance

Contracting Center of Excellence, Army Contracting Agency (ACA) ATTN: Policy and Compliance, 5200 Army Pentagon, Room 1D245 Wa, VA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Adap Spt Office
ContactsNo contacts available
OfficeFORT BELVOIR, VA, 22060-5116, USA
Office AddressFORT BELVOIR, VA, 22060-5116, USA
ContactsNo contact information available

Full Description

Show more
Combined Synopsis/Solicitation For Replacement of Exterior Doors at the Memorial Amphitheater Arlington National Cemetery-Arlington, (I) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (II) The solicitation document is issued as a request for proposal (RFP). Submit written proposals on RFP number RFQ W91WAW-09-P-0325. (III) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-30, effective 15 January 2009. (IV) The North American Industry Classification System (NAICS) code is 321911 and the size standard is 500 employees. The acquisition will be issued as unrestricted. (V) This combined solicitation/synopsis is for purchase of the following commercial services: This project involves the replacement of three exterior oak doors and frames in the Memorial Amphitheater at Arlington National Cemetery. These doors control access to three prominent areas of the amphitheater. ITEM NO -- SUPPLIES/SERVICES -- QUANTITY -- UNIT- UNIT PRICE - AMOUNT 0001 01 EACH 0.00 0.00 Shop Drawings. 0002 03 EACH 0.00 0.00 Oak Doors. 0003 03 EACH 0.00 0.00 Hardware for Doors. 0003 03 EACH 0.00 0.00 Door Installation. (VI) STATEMENT OF WORK STATEMENT OF WORK Replacement of Exterior Doors at the Memorial Amphitheater Arlington National Cemetery Arlington, Virginia Project Background: This project involves the replacement of three exterior oak doors and frames in the Memorial Amphitheater at Arlington National Cemetery. These doors control access to three prominent areas of the amphitheater: (1). One door is located by the exterior entrance to the public restrooms near the south entrance of the amphitheater. (2). A second door is located to the right of the amphitheater stage. (3). and the third and final exterior door is located to the left side of the amphitheater stage. These three exterior doors have deteriorated beyond repair, restoration or refurbishment. These are the original doors to the structure which was built during the early 1900s and the existing wooden doors and door frames are extremely weathered and dry-rotted. The existing mullions which secure the multi-paned glass, within the doors are very loose and require constant maintenance to hold them together. Additionally, the original door widths are approximately 2-1/2 to 2-3/4 thick. This type of construction adds additional weight on the doors and causes additional stress on the deteriorated door frames and jambs causing the doors to sag. The overall weathering process of the door is attributed to the extreme ultra-violent light exposure on the doors especially the exterior door located at the southern entrance to the amphitheater. The existing interior glass panels and all the existing door hardware requires complete replacement Project Scope of Work: The scope of work for the replacement of the exterior doors will involve the following items of work: The contractor shall furnish and be responsible all labor, materials, supervision, equipment, the development of shop drawings for the fabrication, removal and installation of three exterior doors located at the memorial amphitheater. (1). Contractor is responsible for taking and assuring accurate on site measurements of the existing doors, frames, door jambs and hardware to ensure proper fabrication and installation of new doors and frames. (2). Contractor is responsible for the development of accurate shop drawings for the fabrication new doors, door frames and jambs. The shop drawings and specifications shall be submitted to the cemetery for approval before the actual fabrication process starts. Contractor shall provide samples of wood to be utilized in the fabrication process, finishes, surface treatments, glass panels to be used and samples of door hardware (i.e., handles, hinges, fasteners, and screws). When replacing the hardware the existing locking mechanisms (cylinders) will be use to avoid the replacement of current master keys. (3). Contractor shall provide all materials for the fabrication, finishing and shop priming of the three new exterior wooden doors. The new doors should be fabricated to match the architectural style of the existing doors and frames, to include glass panels and door hardware. Contractor should provide samples of finishes and recommendations on various treatments to prevent or reduce the effects of ultra-violent light exposure and damage to the doors. (4). Prior to transportation of the new doors to the site for installation. The contractor will provide the cemetery the opportunity for a final site inspection at the contractors fabrication facility to inspect the final product. (5). Contractor shall install all doors, frames, hinges and hardware following current industry installation standards. (5). Contractor shall provide a written warranty to the government warranting all materials, fabrication, installation and workmanship. Contractor recommended materials for the maintenance and upkeep of the doors for cleaning and preserving the finishes, and maintaining the new hardware. (VII) Period of Performance (POP): Within 30 days after date of award. (VIII) The provision 52.212-1 -- Instructions to Offerors -- Commercial Items, applies to this acquisition. (IX) The provision at FAR 52.212-2 Evaluation -- Commercial Items applies to this acquisition. (a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Lowest Price Technically Acceptable (X). The provision FAR 52.212-3, Offeror Representations and Certifications-Commercial Items(By Reference), applies to this acquisition, the offeror must submit a completed copy of with its quote. (XI) The clause at FAR 52.212-4, Contract Terms and Conditions (By Reference), applies to this acquisition. (XII) The clause at FAR 52.212-5 -- Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items is applies to this acquisition (XIII) The Government intends to award a firm-fixed-price order resulting from this combined synopsis/solicitation. (XIV) N/A (XV) Quotes are required to be received in the contracting office no later than 12:00 PM noon EST on August 18, 2009. All quotes must be emailed to the attention of, Richard W. White @ Email: contact@example.gov (XVI) Any questions regarding this solicitation should be directed to Richard White, Contract Specialist, no later than 12:00 PM noon EST on August 13, 2009 at: contact@example.gov.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS