Z--Construct New Water Control Structure (Harrison La

Awarded
140FC226R0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract awarded under solicitation number 140FC226R0008 is a firm fixed-price construction project to demolish and replace an aging water control stoplog structure at the Harrison Lake National Fish Hatchery in Charles City, Virginia, managed by the U.S. Fish and Wildlife Service under the Department of the Interior. The primary objective is to improve hydrologic control for delivering surface water to fish rearing ponds while ensuring no disruption to ongoing hatchery operations, preventing contamination of water, and safeguarding fish populations. The work must be completed within 240 calendar days from the Notice to Proceed and is subject to stringent environmental compliance requirements, including obtaining a Virginia Water Protection Permit, a USACE Section 404 Permit, and a Stormwater Pollution Prevention Plan. Contractors must adhere to federal and Virginia environmental regulations, ACI standards for concrete, and industry best practices, with all activities restricted to daylight hours between one-half hour before sunrise and one-half hour after sunset, and no work permitted on weekends or federal holidays unless specifically authorized. Work must cease immediately if endangered or threatened species are encountered, as mandated by the Endangered Species Act. The contract structure emphasizes strict performance accountability and compliance with multiple FAR clauses, including those governing site conditions, material and workmanship, permits, accident prevention, and inspection and acceptance procedures conducted at the project site by the Government’s Contracting Officer’s Representative. Payment is processed electronically through the Invoice Processing Platform (IPP), with no use of WAWF required, and accelerated payments to small business subcontractors are mandated. The contract includes clauses for prompt payment, electronic funds transfer, prohibition of claim assignment, and warranties on construction, with payment tied to performance and adherence to specifications. The solicitation is set aside for small businesses, and offerors must provide a valid Unique Entity ID and CAGE Code, along with accurate socioeconomic representations via SAM.gov. All submissions must clearly indicate the contract number and are subject to the Government’s right to audit records. The estimated contract value ranges between $100,000 and $250,000, with award planned on a lowest price technically acceptable basis without discussions, and the contractor assumes full responsibility for all costs including postage, compliance with Davis-Bacon wage requirements on-site, and adherence to specialized work hour and environmental interruption restrictions.

General Info

Construct new water control structure at Harrison Lake National Fish Hatchery to regulate flow and water quality.

Agency

Department Of The Interior → Construction A/e Team 2 FwsView Agency

Contract Value

$295,000

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

VA

Set-Aside

NONE

Awardee

KOVILIC CONSTRUCTION CO INCView Profile

Award Issued Date

Documents

(4)

A04_SOW_Environmental Permitting and Water Control Structure Construction

PDFsow

A06 Bid Schedule for Environmental Permitting and Water Control Structure

PDFbid-schedule

Wage Decision VA20260001 for Heavy Dredging in Virginia

PDFwage-determination

Solicitation 140FC226R0008 - Construct New Water Control Structure at Harrison Lake NFH

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 2 Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Organization / Agency
Department Of The Interior → Construction A/e Team 2 Fws
View Agency Profile
Office AddressFalls Church, VA, 22041, USA
Contacts

Full Description

Show more
Construct New Water Control Structure (Harrison Lake NFH)

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Emerson St. Sinkhole RepairThe contract pertains to the repair of a stormwater drainage issue along Emerson Street involving the replacement of a disconnected section of pipe that formerly linked to the main King County stormwater line beneath the roadway. Work includes excavation to access the damaged segment, removal of the old infrastructure, installation of a new pipe section, and the creation of a secure connection to the main line. Additional tasks involve backfilling the trench and repaving the affected asphalt surface to restore the street to its original condition. Given the location on a busy arterial road, the project necessitates extensive traffic management measures, including lane closures and controls, to maintain public safety and minimize disruption during construction. The contracting entity is the Port of Seattle, specifically through its Waterfront Project Management division, with the work classified under NAICS code 237110 for sewer and water infrastructure. The solicitation was posted in July 2026 and is currently in forecast status, indicating it is an upcoming opportunity for contractors to prepare bids. Primary contact for inquiries is Marilynn Montenegro, with Brandon Klett serving as the project manager. The exact location of the work is on Emerson Street, though specific city and state details are not provided in the data. All communication and formal inquiries should be directed through the provided contact details for the Port of Seattle.
Waterfront Project Management

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is preparing to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. This project aims to rehabilitate the aging infrastructure without full excavation, leveraging CIPP to create a durable, seamless liner within the existing pipe, thereby extending its service life and maintaining water system reliability. The work is classified under NAICS code 237110, indicating it falls under utility system construction, and will be executed to meet current engineering and safety standards for municipal water infrastructure. Moraa Omwega serves as the primary point of contact for the solicitation, with Ray Moreno listed as the Project Manager, both reachable through the Port of Seattle’s official channels. The anticipated timeline for the bid process begins with a posting date of July 26, 2026, suggesting that the formal solicitation and bid submission phases are expected to commence in late 2026. The project will be performed at the specified location along the Airport Expressway, though exact geographic details such as city, state, or zip code are not provided in the available data. Interested parties are encouraged to monitor the designated UI link for official documentation, schedule updates, and compliance requirements as they become available.
Aviation Project Management Group

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
International
Greater Mandeville Water Supply Improvement Project- Pepper/Goshen Distribution Network- Old Pepper Well to Old Pepper Main Road, Manchester/St. ElizabethThe National Water Commission of Jamaica is soliciting bids for the supply and delivery of 1 kilometer of 250mm nominal diameter ductile iron pipes along with all necessary associated fittings for the Greater Mandeville Water Supply Improvement Project. The work is focused on the Pepper/Goshen Distribution Network, specifically extending from the Old Pepper Well to the Old Pepper Main Road in Manchester and St. Elizabeth. Bidders must ensure compliance with all technical and quality specifications for the pipes and fittings, as the project aims to enhance water infrastructure reliability in the region. The solicitation is open to qualified suppliers and contractors who can meet the required delivery and installation standards. The solicitation, identified by number 1618/1423, was posted on July 24, 2026, and responses must be submitted no later than August 19, 2026, at 4:00 PM. The contract does not specify a set-aside designation and is classified under the government of Jamaica’s broader water infrastructure program. All correspondence and submissions should be directed through the official ePPS portal, with no physical office address or point of contact listed. The place of performance is confined to the designated路段 in Manchester and St. Elizabeth, and bidders are expected to account for logistics, handling, and timely delivery to meet project timelines and operational requirements.
National Water Commission

POSTED

2 days ago

DEADLINE

in 24 days
View Details

More opportunities from Department Of The Interior → Construction A/e Team 2 Fws

Same awarding agency