F--TREE & LIMB REMOVAL & TRIMMING FOR USACE, GAVINS POINT PROJECT, DUE TO SEVERE WIND STORM AUG 8, 2010

Awarded
W9128F-10-M-G033Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
FAC 120 - Firebreak Maintenance and Hazard Tree Removal in Nickserson State Park FY27
Solicitation # BD-27-1020-DCRFC-DC366-134921
The Massachusetts Department of Conservation and Recreation is soliciting bids for firebreak maintenance and hazard tree removal at Nickerson State Park for fiscal year 2027. The scope of work is divided into two primary tasks: the maintenance of the firebreak along Ober Road through tree removal, mulching, and mowing, and the mitigation of hazard trees throughout the park's campgrounds, internal roads, and bike paths. All work must comply with OSD Statewide Contract FAC 120, and the contractor is required to ensure that tree stumps protrude no more than two inches from the ground. Qualified bidders must provide a completed Bidder Response Form, three relevant references, and certified insurance policies for all subcontractors. Evaluation is based on the best value to the Commonwealth, considering price, equipment, safety programs, and the qualifications of onsite staff. Key requirements include a superintendent with a valid Massachusetts Certified Arborist or International Society of Arboriculture certification and machine operators holding a current Massachusetts Timber Harvester License. All equipment must meet ANSI specifications and current safety inspections. The project is subject to Department of Labor Standards Prevailing Wage Rates. Work must be performed Monday through Friday between 7:00 am and 6:00 pm, commencing within ten business days of the Notice to Proceed. Responses are due by 4:00 PM on November 17, 2026. Bidders may apply for a single task or both, though the agency reserves the right to award tasks separately. The primary point of contact for the solicitation is Casey Duggan, with Paul Gregory serving as the task manager for firebreak maintenance.
Department of Conservation and Recreation

POSTED

about 5 hours ago

DEADLINE

in 19 days
NAICS: 561730
New
SLED
SNOW PLOWING AND/OR HEAVY DUTY SNOW REMOVAL WITH WHEEL LOADERS 2026-2027
Solicitation # 8968
The City of Waterbury is soliciting qualifications from multiple operators to provide citywide snow removal services for the 2026-2027 fiscal year. The scope of work is divided into two primary categories: snow plowing and sanding of city roads, and heavy duty trucking and snow removal utilizing wheel loaders. Services must be available from November 1, 2026, through April 30, 2027, under the direction of the Public Works Department and the Bureau of Streets. All equipment must undergo city inspection by November 20, 2026, to ensure it meets minimum standards. Plowing equipment is categorized by gross vehicle weight ranging from light duty (11,500 to 19,500 lbs) to heavy duty (33,001 lbs or greater), with established hourly rates between 90 and 250 dollars depending on the equipment type and service provided. The selection process involves a two-stage approach consisting of short-listing based on technical and managerial capabilities, equipment quality, and prior performance, followed by interviews and negotiations. Awarding is at the sole discretion of the City. Successful vendors must comply with the Federal Davis-Bacon Act, the American Recovery and Reinvestment Act of 2009, and HUD Section 3 clauses. Additionally, vendors must obtain approval from the City Risk Manager for all insurance before commencing operations and are required to use city-issued magnetic plates on all vehicles. Responses were due by November 13, 2026, and required the submission of a vendor qualification statement, vehicle information sheets, and a non-collusive affidavit.
DAS Procurement

POSTED

about 6 hours ago

DEADLINE

in 15 days
NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. This public works project involves a comprehensive scope of work including demolition, site and soil preparation, irrigation installation using 2-inch Schedule 40 PVC, planting, concrete work, lighting, and low-voltage electrical work. The contract will be awarded to the lowest responsive and responsible bidder on a firm-fixed fee basis, with a required project completion timeline of 45 working days. Bids must be submitted electronically via the OpenGov portal, with the final deadline extended to November 5, 2026, at 5:00 pm. Qualified contractors must possess a Prime B license and comply with various regulatory requirements, including the Living Wage Ordinance, Equal Employment Opportunity regulations, and DIR registration for prevailing wage compliance. Bidders are required to provide a bid security of at least 10 percent of the bid amount, and the successful awardee must provide a 100 percent performance bond and a payment bond of at least 50 percent if the contract is under 1 million dollars. Evaluation factors include the complete submission of the bid form and available local business preferences, offering a 2 percent preference for businesses with a local office and an additional 4 percent for those with local ownership. All work must adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and applicable ADA and ABA accessibility standards.
Economic Development and Housing

POSTED

about 10 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract outlines the requirements for tree trimming and removal services at the Gavins Point Project near Yankton, South Dakota, specifically covering the Cottonwood Campground, Nebraska Tailwaters Campground, and Cottonwood Day Use Area. The scope includes trimming approximately 207 trees and removing and grinding approximately 59 trees, including stump removal and debris disposal at designated sites. All work must adhere to modern arboriculture standards and the Corps safety manual EM 385-1-1, with a completion deadline of September 17, 2010. Before starting, the contractor must meet with the Contracting Officer Representative to provide insurance certificates, a safety plan, and a work plan, and conduct an on-site tour to identify priority areas. Award selection is based on best value, prioritizing equipment, workforce, past performance, and timeliness over price. The contractor is responsible for providing all necessary labor and equipment and must obtain written approval for any subcontracting. Payment will be processed upon submission of an itemized invoice following the completion of the work.

General Info

Contract Value

$87,025

NAICS

561730 - Landscaping Services

Place of Performance

NE, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
ContactsNo contact information available

Full Description

Show more
SPECIFICATIONS FOR TREE TRIMMING/REMOVAL AT GAVINS POINT PROJECT LOCATED NEAR YANKTON, SOUTH DAKOTA 1. SCOPE OF WORK. The work performed under this contract consists of furnishing all labor, supplies, and equipment needed to trim limbs and/or remove trees at the Gavins Point Project including Cottonwood Campground, Nebraska Tailwaters Campground, Cottonwood Day Use Area and other locations as designated by the COR. 2. MEETING WITH CONTRACTING OFFICER REPRESENTATIVE (COR). 2.1. The Contractor shall meet with the COR prior to commencement of work to discuss performance requirements and administration of the contract. The Contractor at this meeting shall provide a certificate of appropriate insurance. The Contractor shall also provide the name of any person that has full authority to act in his or her absence. A Contractor Safety Plan and Contractor Work Plan shall also be submitted at this meeting. Documents must be approved by the COR prior to commencement of work. 2.2. The Contractor shall take an on-site tour of work areas with the COR prior to commencement of work, to identify priority areas. 2.3. Work not satisfactorily performed by the Contractor as specified in the terms of this contract may result in government forces or another contractor trimming and removing trees at the Contractors expense. 2.4. Contractor Personnel. All Contractor personnel shall be fully clothed at all times while performing the services of this contract. Fully Clothed shall be deemed to mean that a shirt (or T-shirt), trousers, and shoes shall be worn at all times. All safety equipment needed to safely remove and trim trees these areas in this contract must be properly worn. This shall be done in compliance with the Corps safety manual EM 385-1-1. Tact, diplomacy and courtesy shall be used at all times during contact with the public. 3. TRIMMING AND TREE REMOVAL 3.1. Contractor shall trim all branches as identified by the COR. Any trees that are removed will have the stumps removed also and disposed in an area identified by the COR. All tree work will be performed in conformance with modern arboriculture standards to the satisfaction of the COR. 4. CLEAN-UP 4.1 Contractor shall clean up all debris and dispose of in a site north of SD Highway 52 and at the Corps maintenance shop. 5. COMPLIANCE WITH LAWS AND REGULATIONS. The Contractor shall comply with all state and federal laws, ordinances, and statutes. 6. QUANTITY. The estimated number of trees to trim is 207, the estimated number of trees to remove and grind is 59. 7. EQUIPMENT. The Contractor's equipment shall comply with applicable state laws. Mechanical failure or other similar reasons will not be sufficient to excuse failure to adhere to the schedule. The Contractors equipment must be adequate to successfully and safely complete the job. 8. WORK SCHEDULE. The Contractor work schedule shall be included in the Contractor Work Plan (see paragraph 2.1). The work shall be completed by September 17, 2010. 9. The Contractor will notify the Contracting Officer immediately of damage to Government or private property and injury to any person resulting from his or her operation. 10. SUBCONTRACTING. No contract shall be made by the Contractor with any other party for furnishing any of the work contracted for without the written approval of the Contracting Officer. This provision does not apply to contracts of employment between the Contractor and his personnel. 11. SAFETY. The Contractor shall conduct all operations of this contract in a fashion to protect the safety of all involved parties. The Safety Plan mentioned in paragraph 2.1 shall fully address all aspects of safety for this contract. 12. ON SITE VISIT. It is highly recommended that all bidders make an onsite visit to the Project to inspect the areas prior to bid submittal. 13. BEST VALUE. 13.1. Award to the successful contractor shall be based on Best Value rather than low bid. Bids will be rated on the following factors: a. Equipment. b. Workforce. c. Past Performance. d. Price. e. Ability to perform work in a timely manner. The combination of a,b,c and e together, are significantly more important than price. 14. INSPECTION. 14.1. Inspection of work will be made by an Authorized Representative of the Contracting Officers Representative at regular intervals. 15. PAYMENT AND INVOICING. 15.1. Payment for services rendered under this contract will be processed upon receipt of the invoice. The quantities on the bid sheet are estimates for bidding purposes. 15.2. Invoice shall be submitted when work is complete. Invoice shall be submitted to the U. S. Army Corps of Engineers, Gavins Point Project, P.O. Box 710 Yankton, South Dakota 57078. The invoice shall be itemized and show the contract number on an approved invoice form.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a total small business set-aside for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The project focuses on facilities G7140 and H7140 and is structured as a firm-fixed-price contract with a final delivery deadline of March 20, 2027. The scope of work requires a certified API 653 inspector to conduct external inspections, visual assessments of containment areas, and verification of alarms and Automatic Tank Gauge equipment. Deliverables include a teleconference kick-off meeting, completed API Std 653 checklists, and the submission of draft and final reports that identify any appurtenances not complying with DoD Standard AW 78-24-27. The government will award the contract to the responsible offeror deemed most advantageous based on technical capability, experience, and price reasonableness. Proposals must be submitted as a single PDF not exceeding five pages, excluding the cover page, price worksheet, and certifications. Required submission materials include the inspector's certification, a one-page resume, and past performance references. Due to the work being performed on a closed military installation, all personnel must undergo identity proofing and vetting unless they possess a current government security clearance. Quotes must be submitted electronically to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by the response deadline of November 13, 2026.
All Other Professional, Scientific, and Technical Services

POSTED

about 14 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS