Amendment 0001:This amendment is being issued to make the following changes: 1) Change timeframe for issuance for RFQ to: The tentative timeframe for issuance of the Request for Quote (RFQ) SP3100-08-Q-0001 for this requirement will be the week of January 22, 2008. A site visit will be conducted. The exact date and time for the site visit will be stated in the RFQ package. 2.) Change Pont of Contact information to: Alan Noble, Contract Specialist, Phone
+1 (555) 000-0000, Fax
+1 (555) 000-0000, Email
contact@example.gov. Original: Contractor shall furnish all supervision, labor, material, and equipment and accessories necessary to Demolish Building 268, Defense Distribution Depot Susquehanna, PA (DDSP), New Cumberland PA 17070. The following summary of work is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work. It is expected the contractor will attend the site visit and thoroughly familiarize himself with the project. Specifications and drawings will be provided when the solicitation package is issued. Project Description: All costs associated with the complete demolition and removal of building 268. Project task include, but not limited to the following: 1. Demolish building 268, building footers, surrounding sidewalks, parking areas, and concrete pads as shown. 2. Underground electric service to be disconnected and removed in its entirety at the pole. Cut off conduits at a minimum of one (1) foot below grade and cap. Three (3) transformers, three (3) cutouts/arrestors, and the cross arms to be removed and salvaged for the Government. 3. Provide silt runoff protection at demolition area and storm sewer inlet as shown. 4. Disconnect underground communication line on north side of building as shown. Pull excess wire back to manhole across street and wrap up in manhole. If applicable, disconnect overhead communication lines on north side of building 268 at pole across the street as shown. 5. Remove sign, lights, and underground electric wire/conduit at northwest corner of building 268 at pole across street, a shown. 6. Cap off sanitary sewer lines from building at main or manhole. Sanitary sewer main line to stay in place, remains in operation, and must be watertight. 7. Remove water main valve and valve box as shown. Install blind flange and thrust block. Waterline to be abandoned in place. 8. Backfill and grade demolished areas. Provide fill, topsoil, and plant grass seed for all areas disturbed by this work. All work shall be performed complete and in accordance with the specifications and drawings. Period of Performance: Contractor shall commence work upon receipt of the Notice to Proceed (NTP) and shall complete Demolition of Building 268 and be ready for use within 60 days after receipt of NTP. Liquidating damages for failure to complete within the contract times will be $195 for each day of delay until the task is completed or accepted. Working Hours: Normal hours of work shall be between 0730 and 1630, Monday through Friday excluding any Government holidays. Preconstruction Conference and Initial Submittals: A preconstruction conference will be held approximately 15 days after NTP is issued. Initial submittals items shall be provided to the Government Contracting Officer Representative (COR) at this time. This acquisition is unrestricted pursuant to the Small Business Competitiveness Demonstration Program Act of 1988, Public Law 100-656 (15 U.S.C. 644 note). Contract award will be issued pursuant to the Small Business Competitiveness Demonstration Program. The NAICS Code for this procurement is 238910. The small business size standard is $13,000,000. The magnitude of this construction effort is between $25,000 and $100,000. This requirement is being issued subject to availability of funds. The Government expects to have funding available no later than 31 Jan 2008. The tentative timeframe for issuance of the Request for Quote (RFQ) SP3100-08-Q-0001 for this requirement will be the week of February 18, 2008. A site visit will be conducted. The exact date and time for the site visit will be stated in the RFQ package. Access to the solicitation package to include the specifications and drawings will only be made available to prospective offerors via the Federal Business Opportunities (FedBizOpps) website at http: www.fbo.gov. Hard copies of the RFQ package will not be distributed. Any questions concerning this project should be directed to the Contract Specialist Alan Noble at
contact@example.gov. All questions should be submitted in writing via email to the above. Prospective offerors are cautioned concerning their responsibility to access the website for any amendments that may be issued under the RFQ. There will be no advance notification of amendment issuance. Prospective offerors are advised to consult the website frequently to check for any amendments. Amendments may be issued up until the proposal due date. Failure to acknowledge amendments may render your proposal ineligible for award. To receive awards resulting from solicitations issued after May 31, 1998, your company must be registered in the DoD Central Contractor Registration (CCR) database. Contractor may obtain information on registration and annual confirmation requirements by calling
+1 (555) 000-0000 or via the Internet at http:// www.ccr.gov. Prospective contractors shall also complete electronic annual representations and certifications at http://orca.bpn.gov in conjunction with required registration the CCR database. All responsible concerns may submit a bid which shall be considered by this agency. The Government intends to award one contract as a result of the quotation. Award will be made to the lowest firm-fixed price on a lump-sum basis, responsible bidder. An offeror must be determined responsible according to the standards of FAR Subpart 9 to be eligible for award.