This Pre-Solicitation opportunity from General Services Administration was posted on June 21, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Design/Build Construction Services for the Tuttle Annex Building, Atlanta, GA

Closed
GS-04P-07-EX-C-0104Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 10 days

General Info

Contract Value

$33,999,049

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

96 Poplar Street and 70 Fairlie Street, Atlanta, GA 30343, GA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R4 (amd) Acquisition Management Division
Contacts1 person available
OfficeATLANTA, GA, 30303, USA
Office AddressATLANTA, GA, 30303, USA
Contacts
Glenda A. BurnsContract Specialist

Full Description

Show more
NOTE: The Pre-Solicitation Notice dated Jun 8, 2007 is changed as follows: 1. Delete paragraph 2A. 2. Add the following: 2A. Experience in Providing Design & Construction Services on Comparable Projects. As a minimum, provide documentation evidencing offeror?s past experience on at least five (5) projects completed or in progress within the last ten (10) years that collectively best describe members of proposed D/B team experience providing design and construction services on projects with characteristics as comparable as possible to subject project (i.e., ?Bridging? project delivery; design/build delivery; adaptive re-use of existing building; historic rehabilitation; tight, urban sites; costs in excess of $20 million; LEED certified, BIM, etc.) Below is the minutes from the Pre-Solicitation Meeting held June 20, 2007. On June 20, 2007 the General Services Administration conducted a Pre-Solicitation Notice Pre-Proposal Meeting for firms interested in responding to the pre-solicitation notice. An overview of the information presented at this meeting is: ? Bill Clark with Stevens & Wilkinson Stang & Newdow, the Bridging Architect, presented the general concept design of the project outlining the project scope and the design principles utilized in the development of the Bridging Contract Documents. ? Buddy Hill, the General Services Administration Project Manager, reviewed the use of BIM (Building Information Modelling) to-date on the project, emphasized that GSA is a leader in the advancement of BIM and encouraged all proposers to utilize BIM to the extent technically and economically appropriate in the eventual development of the construction documents. The selected design-builder will be provided with the Bridging Contract Documents in their native electronic form (either Revit or AutoCAD 2-D) for validation by the selected design-builder and the selected design-builder may elect to accept the work as their own or to develop their own electronic files. ? Buddy Hill highlighted that the project will be registered with the U.S. Green Building Council and that it is a project goal to minimally-achieve a ?Silver? certification by USGBC. The Bridging Contract Documents have been developed to allow the selected design-builder with flexibility in the way in which Silver certification points are accumulated, but it will be the responsibility of the design-builder to ensure that the project is executed and documented in a manner which will enable Silver certification. Brookwood Program Management will administer the LEED submission process. ? Buddy Hill provided an overview of the scope of the separate demolition and abatement contract which will be awarded during the month of June, 2007. The design-build contract scope of work will be based upon a structural shell. ? Glenda Burns, the General Services Administration Contracting Officer, reviewed the Advisory Multi-Step procurement process and offered the following clarifications to the Pre-Solicitation Notice: 1. Section 2.A. of the ?Experience? section of the Technical Qualifications to be submitted by proposers will be changed. (see above) 2. The Technical Evaluation factors for the Phase II evaluation will include: 1) the Project Management Approach, 2) Qualifications and experience of Key Personnel, 3) Experience and 4) Past Performance. The Price submitted as a part of the response to the Request for Proposal will be more important than the technical qualifications. 3. In order to submit a response to the Request for Proposal, firms are REQUIRED to submit a response to the Pre-Solicitation Notification. The following questions were addressed at the Pre-Proposal Meeting: Q1. Has a construction start date been established for the project? A1. As a part of the Management Plan to be prepared in response to the Request for Proposal, proposers will provide a schedule for design and construction of the project. GSA anticipates that an award of the design-build contract will be made in early November, 2007. There will be no ?fast-tracking? of the project (i.e. no limited release on construction procurement or work prior to GSA?s acceptance of the completed construction documents from the design-builder. GSA currently anticipates a start of construction in Q1 or Q2 2008. GSA has flexibility in both the start and completion dates of construction. Q2. Can any of the structural work be performed prior to the design being complete? A2. No. The Bridging Contract Documents will provide that the design-builder submit the construction documents in three phases for the purpose of GSA satisfying themselves that the construction documents are being developed in accordance with the requirements of the Bridging Contract Documents. Upon completion of the final construction documents review, GSA will either exercise its contract option for the design-builder to proceed with construction or GSA may elect to pay the design-builder for the services rendered, take ownership of the construction documents, and procure the construction through other means. Q3. Is a schedule to be provided as a part of the response to the RFP? A3. Yes ? See Answer 1. GSA will provide proposers with the anticipated durations for construction document review to be incorporated into the project schedule within the Request for Proposal. Q4. When will the Bridging Contract Documents be available? A4. The Bridging Contract Documents will be provided to all proposers following GSA?s receipt of an agreement from each proposer to secure all documents as ?Sensitive But Unclassified Documents.? GSA currently anticipates that the Request for Proposal (and the Bridging Contract Documents) will be issued in early August, 2007. Q5. How much information is available about the existing building? A5. S&WS&N completed an as-built evaluation of the existing buildings, including an evaluation of the structural capacity of the load-bearing masonry/heavy timber construction, and this evaluation material will be provided ?for reference? with the Request for Proposal. GSA will also provide survey information, geotechnical reports and other evaluative materials as reference documents. Q6. At the Industry Forum, a separate ?BA-54 Project? was discussed. What is the status of that project? A6. The BA-54 project is renovation work required to the basement of the Elbert P. Tuttle Building to permit the relocation of mechanical equipment for the Tuttle Annex and to allow connection of the tunnel to be constructed under the Annex (BA-55) project with the Tuttle Building elevator and stairs. Renovation work is funded separately from Major Capital work and, due to the separate funding sources, separate contracts are required. However, the BA-54 work and BA-55 work will be awarded to the same design-builder. The Requests for Proposal will include separate Bridging Contract Documents for each project. Q7. Can the 90% complete Bridging Contract Documents be made available for review at a time and place different from the Pre-Solicitation Pre-Proposal Meeting? A7. The 90% Bridging Contract Documents can be reviewed at the offices of Stevens & Wilkinson Stang & Newdow at a mutually convenient time during the month of June to be arranged by contacting Bill Clark at bclark@sw-sn.com or 404.521.6202. Q8. Can the buildings be photographed? A8. The exteriors of the Annex buildings can be photographed. Federal security maintains a presence on Fairlie Street and you are advised to notify the officers on-site as to why you are photographing the buildings. Since it is an operating federal courthouse, you are discouraged from photographing the Tuttle Building. Q9. Will the attendance sheet from the Pre-Solicitation Pre-Proposal Meeting be distributed? A9. Yes. It is attached to this Amendment. Q10.Are there any restrictions on the architectural and engineering firms who can be engaged as a part of the design-builder?s proposed team? A10. Stevens & Wilkinson Stang & Newdow and their consultants may not be a part of a design-builder?s team. In addition to S&WS&N, those firms are: IdeaSpan, Herrington Associates, Newcomb & Boyd (for security and data/voice engineering only), Hinman Associates, Costing Services Group, Elevator Advisors, Inc., B&E Jackson, BVM Engineering, L.F. Saussy and Environmental Graphics Additionally, the following consulting engineering firms have been retained by Brookwood Program Management and are ineligible to participate as a part of a design-build team: EDT, Inc., CFP Group, National Building Contractors, Commissioning and Green Building Solutions (CxGBS), and Diversified Environmental Management. PRE-SOLICITATION MEETING ATTENDEES: Bauer Bert, Beck Group, bertbauer@beckgroup.com Bennett Neal, Choate Construction,nbennett@chaoteco.com Cass Lawrence Whiting-Turner Contr, cass.lawrence@whiting-turner.com Clark Bill, SWSN, bclark@sw-sn.com Cleveland Vann, Cleveland Electric, vannc@clevelandgroup.com Dixon Hebrex Circle D Enterprises,hdixon@circledenterprises.com Dunlap Duane Heery ddunlap@heery.com Farley Roy Leo Daly, rwfarley@leoadaly.com Hovis Stacey Heery, shovis@heery.com Jumper Max COA, max_jumper@call.uscourts.gov Juneau Nauey Juneau, njuneau@juneaucc.com Moon Stephen,Beck, stephenmoon@beckgroup.com reagan Mike AFA, mreagan@afap.com Rice Jared Beck, jaredrice@beckgroup.com Smith Linda Heery, lsmith@heery.com Whalen Ronald Juneau rwhalen@juneaucc.com

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS