Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from General Services Administration was posted on November 3, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Investigate, Design andConstruction for building envelope water intrusion repairs

Closed
Reference-Number-4PF-07-0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

801 N Florida Ave/Tampa/FL 33602, GA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Nov 7, 2006 to Nov 14, 2006. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R4 (amd) Acquisition Management Division
Contacts1 person available
OfficeATLANTA, GA, 30303, USA
Office AddressATLANTA, GA, 30303, USA
Contacts
Brenda L OwensContracting Officer

Full Description

Show more
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE RESPONSE DATE AND TO CORRECT THE FAX NUMBER. This is a Sources Sought Synopsis for market research purposes only at this time. The General Services Administration (GSA), Southeast Sunbelt Region, seeks potential sources for the Investigation, Design and Construction services for building envelope water intrusion repairs at the US Courthouse, Tampa, FL. The contractor will be required to provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise provided) and must plan, schedule, coordinate and assure effective performance of all design and construction work to meet GSA agency requirements. The Overall Estimated Construction Cost Range for this project is $5,000,000 to $10,000,000. Completion time is expected to be between 360 and 420 days. Solicitation for this project is anticipated 02/2007. THE PROJECT The US Courthouse was completed in 1998 and has been experiencing a series of problems related to water infiltration through the building envelope. The building is 400,000 sf and consists of 17 floors, plus a mechanical penthouse. The overall height of the building is 380 ft. Several studies as to the cause of the water infiltration have been completed and will be made available for review after a request for proposal has bee issued. The components of the project include a systematic inspection of the curtain wall for water intrusion problems, the design of a repair(s) to correct the water intrusion, the construction of the repairs, the testing of the repairs, monitoring indoor air quality, interior finish work necessary to complete the required repair work, and roofing work. The following is an outline of the project components: 1. Systematic inspection: The extent and severity of the problems are unknown since a comprehensive inspection of the entire building facades has not been performed. The contractor shall examine and disassemble (as necessary) the curtain wall system to determine the cause of the water infiltration. 2. Design of repairs: Once the source or cause of the water infiltration has been identified the contractor shall design a repair procedure. The procedure shall be submitted to GSA for review and approval prior to implementation. Any design that changes or modifies the structural load path shall be designed by a licensed professional engineer. 3. Construction of repairs: Upon approval from GSA with the proposed repair procedure the contractor shall implement and the repair. 4. Testing the repair areas: Upon completion of the repairs the curtain wall assembly shall be water tested to assure the adequacy of the repair work. 5. Monitoring Indoor Air Quality: Due to the water intrusion isolated occurrences of mold have been discovered within the building maintenance. During the contractor's course of the work the indoor air quality shall be periodically monitored to ensure the construction activities have not caused the release of any mold partials. During the investigation or construction if any mold is uncovered the contractor shall take all necessary steps to isolate the mold and perform the necessary remediation. 6. Interior finish work: Interior finish work may be required to repair interior damage resulting from the water intrusion repair work. 7. Roofing work: The GSA has surveyed the roof of the building and identified areas in need of repairs to eliminate the water intrusion problems. Through the Construction Excellence program, GSA will employ the best practices that will result in the best project for the best value; and procure the highest quality construction services as early as practical. GSA is actively seeking General Contractors who can provide full Construction Services (to included curtain wall reapir, engineering, roofing, interior repairs, environmental, forensic engineering, electrical and mechanical) for this project through a procurement method developed in accordance with FAR Part 15.1, Source Selection Processes and Techniques. This will be a competitive acquisition, utilizing the two step source selection procurement method. The subject procurement will be solicited in two parts. Part One will require offerors to submit data regarding technical qualifications. Offerors will be given a description of the project along with the past forensic reports and approximately ten selected drawings that depict the facade of the building. The Government will review technical proposals submitted to determine which are acceptable to the Government or could be made acceptable to the Government. All offerors meeting the technical qualifications in Part One will be allowed to go forward into Part Two and submit a price proposal. The Government will make award to the offeror submitting the lowest-priced technically acceptable proposal. The Technical Evaluation Factors for this project will be (ALL FACTORS WILL BE EVALUATED ON A GO/NO-GO BASIS): Factor No. 1: Firm Profile. Factor No. 2: Qualifications of Key Personnel proposed for this project. Factor No. 3: Experience and Past Performance on curtain wall water intrusion investigations and repair Projects within the last 5 years, by the firm as well as the proposed key personnel. Factor No. 4: Outline Project Management Plan. The selected firm will be required to submit a detailed project management plan within 30 days after award. Details on the submission requirements for the Technical Evaluation factors will be issued in the RFP. All interested businesses are encouraged to respond and submit their capability statement. The capability statement should provide summary level information of technical factors 1, 2 & 3 above.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS