Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on October 9, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--McNary Dam Navigation Lock Downstream Gate Interim Repairs

Awarded
W912EF-14-B-0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 8 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

Solicitation W912EF-14-B-0017 is a sealed bid construction project issued by the US Army Engineer District Walla Walla for interim repairs to the downstream gate of the McNary Dam Navigation Lock. This project is designated as a total set-aside for small business concerns under NAICS code 237990. The scope of work involves comprehensive structural and mechanical repairs, including quoin repairs, paint removal of coal tar, double plate crack repairs, diagonal crack stop drill repairs, and the replacement of access hatch hardware. Technical requirements specifically address gudgeon linkage, eye bar pin hardness, and strict adherence to safety and PPE compliance under EM 385-1-1. The procurement process included a mandatory site visit on September 9, 2014, and was refined through four separate amendments. These amendments updated project site restrictions, revised technical specifications and drawings, added new contract line item numbers for specific crack repairs, and adjusted the bid opening date to September 26, 2014. The final bid opening process verified bidder compliance with bond requirements and acknowledgment of all amendments against the government estimate to ensure the selection of a qualified small business contractor for these critical infrastructure repairs.

General Info

Contract Value

$1,616,485.57

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USACE District, Walla Walla 201 N. Third Avenue, Walla Walla WA 99362-1876 US, WA, USA

Set-Aside

NONE

Award Issued Date

Documents

11

Amendment 0001 - Plans and Repair Notes

PDF, High priority: read this firstamendment
High

Amendment 0001 to Solicitation W912EF-14-B-0017

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912EF-14-B-0017

PDF, High priority: read this firstamendment
High

Amendment 0003 - Drawings 14-B-0017

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation W912EF-14-B-0017

PDF, High priority: read this firstamendment
High

Amendment 0004 – McNary Navigation Lock Downstream Gate Interim Repairs

PDF, High priority: read this firstamendment
High

Bid Opening Worksheet - W912EF-14-B-0017

PDF, High priority: read this firstbid-opening-worksheet
High

McNay Lock and Dam Interim Repairs Plans

PDF, High priority: read this firstsow
High

Solicitation W912EF-14-B-0017

PDF, High priority: read this firstifb
High

Site Visit Attendees – IFB 14-B-0017

PDF, Low prioritysite-visit-attendees
Low

Site Visit Provision (Construction)

PDF, Low prioritysite-visit-provision
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts1 person available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA
Contacts
Phyllis BuerstatteContract Specialist

Full Description

Show more
Construction Project: McNary Navigation Lock Downstream Gate Interim Repairs. This will be a firm fixed-price construction contract located at McNary Navigation Lock in Benton County, Washington. Estimated construction magnitude is between $1,000,000 and $5,000,000. Performance and payment bonds (100%) will be required. The full onsite work window, to include the pre-work and post-work checks, is expected to be 07 March 2015 to 04 April 2015. See solicitation for details. DESCRIPTION OF WORK: Perform structural and mechanical interim repairs on the McNary Navigation Lock Downstream Gate. The McNary Navigation Lock Downstream Gate is a two-leaf arched miter gate and measures 106 feet tall by 86 feet wide and was placed in service in 1954. Miter Gate Gudgeon Repairs -- Procedures include line boring the perpendicular gudgeon plates (2 plates total) and gudgeon linkage eye bar (1 bar total) of each of the miter gate leaves. The gudgeon plates are embedded to the concrete structure of the navigation lock and allow for the attachment to the navigation lock miter gate through the gudgeon linkage eye bar. Therefore the field line boring is required through 3 layers of material with a total thickness of 8.25 inches (gudgeon plates are 1.75 thick each and linkage eye bar is 4.75 inches thick), the bore size shall be increased from 7-inches to 7.125-inches. Gudgeon material is low yield steel and therefore welding operations shall be kept to a minimum as to not alter its properties. Two new linkage pins (one per side) shall be provided to match the new gudgeon plate-linkage eye bar bore diameter. The gudgeon repair work will require jacking and shoring support of the miter gate leaf structures. Each miter gate leaf weighs approximately 400 tons. The miter gate leaves will be required to be jacked and supported during the pin removal, line boring, and pin replacement operations. A jacking and shoring plan is a required deliverable and must be designed by a licensed engineer. Coal Tar Coating System Removal -- Remove all existing coal tar and coal tar/primer from the lower 24-feet of the downstream side structural components on both Downstream Miter Gate Leaves. Acceptable removal of the coating system is defined as the removal of all visible coal tar and primer coat. Bare steel is required to permit structural inspections. The existing coal tar material was applied to the gate structure in 1949 and was confirmed to be asbestos-free by laboratory testing in 2014. The coal tar was originally manufactured to meet the requirements of American Water Works Association Specification 7A-5-1940. The coal tar was hot-applied to a minimum thickness of 3/32-inch and is anticipated to have a maximum thickness of 1-inch. The existing primer material consists of a coal tar pitch primer originally manufactured to meet the requirements of American Water Works Association Specification 7A-5-1940. The design and installation of suitable containment measures are required to protect the immediate and adjacent areas on the gate structure and Navigation Lock floor from contamination from the removal activities. Removal and off-site disposal of all resulting coal tar coating waste is required to be in accordance with Federal, State, and local laws and regulations. Structural Inspection of Downstream Miter Gate -- Provide the services of professional engineers and Non-Destructive Testing (NDT) technicians to perform structural inspection of the lower 24-feet of the downstream side of the miter gate and the upstream side of the miter and quoin areas (non-skin plate body areas) of the miter gate. Structural Engineers that are state licensed professional engineers, and NDT Level II or Level III qualified technicians will be required by this contract. Due to elevated inspection and NDT requirements, Society of Professional Rope Access Technicians (SPRAT) Level III personnel will be required to supervise the inspection teams. Based on the aggressive schedule requirements of this contract, multiple inspection/NDT teams may be required to work on both miter gate leaves concurrently. Structural inspections require the design and installation of an engineered fall protection system and personnel fall protection equipment meeting the requirements of EM 385-1-1. Crack Repair on Structural Members of Downstream Miter Gate -- Perform various forms of crack repair to include stop-drilling, bolted plate repairs, partial penetration welds, and complex complete joint penetration welds. Weld repairs will be performed on non-fracture critical members and fracture critical members. Welding shall conform to American Welding Society (AWS) D1.5 and welders shall be qualified in accordance with AWS D1.5. Crack repair requires the submission of welding procedures for each weld to be made. Welding repairs require preheating and interpass temperature control. The contract will require full time services of Certified Welding Inspectors certified in accordance with AWS QC1 during all on-site welding activities. Repaint Structural Members of Downstream Miter Gate -- Upon completion of all crack repairs, paint all surfaces that were previously coated with coal tar with Vinyl Paint System 4. The Vinyl Paint System 4 consists of five coats of alternating white and gray formula V-766e double-spray coats. Surface preparation for the Vinyl Paint System will require white metal blast in accordance with SSPC SP 5. Quoin and Miter Surface Repair -- Resurface the quoin and miter surfaces on the lower 30-feet of the north miter gate leaf and the lower 60-feet of the quoin surface and the lower 30-feet of the miter surfaces on the south miter gate leaf. This work will consist of welding up the deficient areas and machining down the surfaces to remove defects and to restore the surface plates to their original thickness. Replace Wood Timber Fenders - Replace twenty (20) wood timber fenders and mounting hardware (bolts, washers, nuts) on the downstream side of the miter gate leaves. Fenders are approximately 7 quote mark x 12 quote mark x 27' long each. New wooden timbers will be provided as Government Furnished Material and shall be installed by the Contractor. Mounting hardware shall be provided by the Contractor. Temporary Removal of Cathodic Protection - To facilitate the coal tar removal, structural inspections, crack repairs, and repainting, remove the existing Impressed Current Cathodic Protection components from the downstream side of the miter gate leaves. Upon completion of the required repairs and repainting, reinstall the Cathodic Protection components. The contract requires completion of all work at the navigation lock within a finite work window, as stated above. Work must be completed within the specified work window in order to return the navigation lock to service in accordance with a coordinated Columbia/Snake River navigation system outage plan. All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years. A qualified Fall Protection Competent Person shall be provided by the Contractor for each shift of the contractor's on-site operations that involves work that exposes workers to fall hazards. This contract will require the Contractor to furnish mobile crane equipment, crane operators, and rigging equipment that comply with the certification and testing requirements of EM 385-1-1. The Contractor will be responsible for various equipment to support elevated working positions such as scaffolding, scissor-lifts, boom-lifts, and aerial lift equipment. The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor's operations. The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled quote mark Construction Quality Management for Contractors quote mark within the last 5-years. The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award. The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract. Miscellaneous work within the project includes the delivery of As-Built Drawings to the customer. Invitation for Bids No. W912EF-14-B-0017 will be posted to the FedBizOpps (FBO) website approximately 02 September 2014. Bids will be due no sooner than 30 calendar days after the solicitation is issued. See solicitation for details about bid opening. When issued the solicitation documents for this project will be available at https://www.fbo.gov The solicitation is 100% set-aside for small business concerns. The small business size standard for NAICS 237990 is no more than $36,500,000 in average annual receipts. Important Note: The FBO Response Date listed elsewhere in this synopsis is for FBO archive purposes only. It may have no relationship to the actual bid opening date. The bid opening date and time will be contained in the solicitation and any solicitation amendments that are issued. A site visit will be offered generally within 2 weeks after the solicitation is issued. See solicitation for details about the site visit. Only ONE site visit will be offered. Access for Foreign Nationals. It takes from 2-4 weeks to obtain clearance for foreign nationals to enter the project site. If your company wishes to have a foreign national participate in the site visit for this project, you are strongly encouraged to submit the required identification immediately. To request clearance for foreign nationals, submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph 9INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to contact@example.gov. Foreign nationals must have received clearance prior to being granted access to the project site. No CDs or hard copies will be available by the Government. Downloads are available only through the FBO website. Bidders are responsible for checking the FBO website frequently for any update(s) to the notice. The Government is not responsible for any loss of internet connectivity or for a bidder's inability to access the document posted on the referenced website. To obtain automatic notifications of updates to this solicitation, you must log in to www.fbo.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting offers for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at the Dworshak Dam. This small business set-aside project requires the contractor to provide all personnel, materials, equipment, and transportation to move the bulkheads from Dworshak Dam to a repair facility and back. The scope of work includes existing coating removal, weld inspection and repair according to AWS D1./D1.M standards, and the application of new coatings in compliance with SSPC SP 5/NACE No. 1 and Section 09 97 02.00 28 for hydraulic structures. The government provides the bulkheads as government furnished property, with each unit having an estimated value of 850,000 dollars. The project is structured in three phases, with each phase involving two top and two bottom bulkheads. Performance is scheduled between November 23, 2026, and July 5, 2027, with specific pickup and return windows for each phase. Deliveries and retrievals must be coordinated 15 days in advance and occur Monday through Thursday. Key requirements include a one-year warranty on the coating system, the submission of general inspection reports within five business days of each inspection, and the provision of manufacturer safety data sheets and CERL Lab certification for all paint materials. The contractor must also ensure all paint is stored and packaged according to strict safety and stability guidelines to prevent degradation.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

3 days ago

DEADLINE

in about 20 hours
View Details
NAICS: 811310
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

8 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS