This Award Notice opportunity from Department Of The Interior was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Department of the Interior, through the Northern Rockies Major Acquisition Office, is soliciting proposals for a Firm Fixed Price Construction Contract to remodel the approximately 4,500-square-foot Visitor Center at Golden Spike National Historical Park in Promontory Summit, Utah. This Total Small Business Set-Aside under NAICS code 236220 is limited to small businesses meeting the $45 million size standard and requires all offerors to be currently registered in SAM with active status and possess a Unique Entity Identifier and CAGE code. The scope includes extensive interior and exterior renovations to accommodate new exhibits, relocation of Western National Parks Association retail and National Park Service offices, renovation of the audiovisual storage room, updates to interior finishes, expansion of the building footprint by enclosing the north porch, and full HVAC and fire protection system modifications, including concealment of visible components. The work also encompasses site improvements to the north viewing plaza and access routes. The project has a mandatory 473-calendar-day performance period, with an assumed notice to proceed date of September 14, 2026, and requires completion of the main renovation by December 31, 2026, with two optional line items for administration area reconfiguration and exterior painting that may be exercised unilaterally by the Contracting Officer within 90 days of award.
All proposals must be submitted in two PDF volumes via email to the Contracting Officer at [email hidden], not exceeding 25 MB per email, with strict adherence to format, page size, and labeling requirements. Evaluation is based on an integrated best-value tradeoff assessing past performance, project experience, key personnel qualifications, schedule, safety, and price—with past performance and project experience deemed more important than the others, and non-price factors considered approximately equal in importance to price. The Contractor must meet stringent requirements for key personnel, including a Project Manager with five years of experience managing $2 million+ projects, a Superintendent with five years of field supervision, and an On-Site Safety Supervisor with demonstrated safety program experience. Compliance with federal sustainability mandates, Buy American provisions, prevailing wage rates under DOL Wage Determination UT20260081, ADA accessibility, hazardous materials handling, daily PPE inspections, and mandatory weekly and monthly safety meetings with documentation is required. Environmental sustainability demands biodegradable or recyclable packaging per ASTM D5834, minimal material usage, and source reduction practices. Payment must be processed electronically through the
General Info
Small business set-aside for $1-5M Visitor Center remodel in Wyoming, upgrading systems and accessibility.
HighAI Summary for Amendment 0001 to Solicitation 140P1426R0012 for Remodel Visitor Center: This document is Amendment 0001 to Solicitation 140P1426R0012, effective June 10, 2026. It provides details for a site visit related to the Remodel Visitor Center for New Exhibits at Golden Spike National Historical Park. The amendment includes FAR clauses 52.236-2 and 52.236-3 regarding site conditions and investigations. A site visit is scheduled for June 30, 2026, at 11:00 a.m. MDT at the Visitor Center in Corinne, UT. The period of performance is from September 14, 2026, to December 31, 2027. The amendment requires acknowledgment by offerors and clarifies that all other terms remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0002 to Solicitation 140P1426R0012: This document is Amendment 0002 to Solicitation 140P1426R0012, effective 06/10/2026, issued by NPS, IMR - Northern Rockies MABO. The amendment removes Attachment 2 Drawings titled "Fossil Butte National Monument" as they were included in error and do not apply to the Golden Spike Visitor Center Remodel project. It confirms that other attachments including specifications, parking lot rehabilitation drawings, submittal list, 100% CDs, closeout and maintenance requirements, wage determination, past performance questionnaire, and subcontracting limitations remain applicable. The period of performance is from 09/14/2026 to 12/31/2027. All other terms and conditions remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0003 to Solicitation 140P1426R0012: This document is Amendment 0003 to Solicitation No. 140P1426R0012, effective July 6, 2026. It extends the proposal due date to July 22, 2026, at 1:00 p.m. MDT to allow time for responses to Requests for Information (RFIs). Responses to RFIs will be issued separately and posted on SAM.gov. All other solicitation terms remain unchanged. The period of performance is from September 14, 2026, to December 31, 2027.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0004 to Solicitation 140P1426R0012: This document is Amendment 0004 to Solicitation Number 140P1426R0012, effective July 9, 2026. It provides responses to contractor RFIs, corrections to Standard Form 1442 regarding offer acceptance periods, and includes reference materials such as 1968 visitor center as-built drawings, new visitor center exhibit drawings, a site visit participant list, and a Department of Labor highway wage determination. The amendment confirms that proposals remain due by July 22, 2026, at 1:00 p.m. MDT, and all other solicitation terms remain unchanged. The period of performance is from September 14, 2026, to December 31, 2027.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0005 to Solicitation 140P1426R0012: This document is Amendment 0005 to Solicitation Number 140P1426R0012, effective July 17, 2026. It extends the proposal due date to July 27, 2026, at 1:00 p.m. Mountain Daylight Time, to allow the Government additional time to respond to questions regarding the solicitation. The amendment confirms that all other terms and conditions remain unchanged and in full force. The period of performance for the solicitation is from September 14, 2026, to December 31, 2027.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0006 to Solicitation 140P1426R0012: This document is Amendment 0006 to Solicitation 140P1426R0012, effective 07/23/2026. It modifies the original solicitation by providing responses to questions regarding specifications such as tile cove base color and finish, asbestos-containing material removal, and past performance criteria. The amendment extends the offer receipt date and requires acknowledgment of the amendment by offerors. It maintains all other terms and conditions of the original solicitation unchanged.
PDF
PDF, High priority: read this firstreference-drawings
HighAI Summary for Attachment 12 Reference Drawings - New Visitor Center Exhibits Amendment 4: This document, titled 'Attachment 12 - Reference Drawings Only - New Visitor Center Exhibits (Amendment 4)', provides detailed reference drawings and specifications for the New Visitor Center Exhibits project. It includes abbreviations, numbering systems, drawing symbols, material finish codes, section and elevation markers, and a comprehensive lighting schedule with types, quantities, and specifications. The document also details material finishes, exhibit cabinetry, and scenic structures with manufacturer and source information. It serves as a technical reference for construction and fabrication, dated as Amendment 4, and is critical for understanding design and material requirements for the project.
PDF
PDF, High priority: read this firstdrawings
HighAI Summary for Attachment 2 - Drawings: This document titled 'Attachment 2 - Drawings' appears to be a set of construction or engineering drawings related to a procurement project. It includes sections such as 'PARTIAL ATTIC - FIRE PROTECTION' and 'ELECTRICAL SYSTEM' with general electrical notes. The document likely serves as a technical specification or design reference for the project, providing detailed visual and technical information necessary for construction or installation. The presence of multiple pages and detailed notes indicates its importance for understanding project requirements and execution.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment 3 - Parking Lot Rehabilitation Drawings: This document contains detailed drawings and specifications for parking lot rehabilitation including routes 0900, 0901, 0402, 0906, 0401, and 0903. It includes notes on pavement markings, parking stall dimensions, accessible parking space requirements, and pavement replacement areas. The drawings specify compliance with United States Access Board guidelines and Architectural Barriers Act. Quantities for asphalt demo, surface course, and pavement markings are provided. The document is dated 09/29/2025 and prepared by PrimeCivil and Stantec Consulting Services Inc. It serves as a technical guide for pavement marking installation and asphalt paving work for the Golden Spike National Historic Park project.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Attachment 6 - Closeout and Operations Maintenance Requirements Template: This document is the Closeout and Operation & Maintenance (O&M) Requirements Template provided by the National Park Service (NPS) Denver Service Center, dated January 27, 2021. It outlines detailed requirements for project record drawings, system demonstration and training, tools, spare parts, equipment, extra stock, reports, keys and keying schedules, and O&M data warranties and guarantees. The template includes specification sections, submittal dates, and tracking columns for completion and receipt by the park. It serves as a comprehensive guide for closeout submittals, warranties, maintenance data, and operation manuals necessary for project closeout and ongoing maintenance.
DOCX
DOCX, High priority: read this firstpast-performance
HighAI Summary for Attachment 9 - Past Performance Questionnaire: This document is a Past Performance Questionnaire intended for use as source selection information. It includes sections for the offeror/contractor to complete project and contract details, and for references to provide evaluations on quality, schedule, cost control, management, subcontracting, and regulatory compliance. The questionnaire contains rating definitions and requests detailed comments supporting the ratings. It is marked as Source Selection Sensitive and includes instructions for returning the completed form to the Contracting Officer by a specified date. The document is designed to assess the contractor's past performance for similar contracts.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for DOL Wage Determination Highway Utah Amendment 4: This document is a wage determination for highway construction work in Utah, specifically for Box Elder County. It includes prevailing wage rates and fringe benefits for various construction-related job classifications such as truck drivers, operators, laborers, ironworkers, electricians, and carpenters. The document references modifications published on 01/02/2026 and 05/18/2026, and includes notes on Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. The wage rates are detailed with union and survey rate identifiers, and the document is intended to ensure compliance with labor standards for federal construction contracts.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for DOL Wage Determination UT20260081 for Utah Construction: This document is the Department of Labor (DOL) Wage Determination UT20260081, effective May 17, 2026, for construction work in Utah, specifically Box Elder County. It lists prevailing wage rates and fringe benefits for various construction trades such as carpenters, electricians, plumbers, and laborers. The document includes union and non-union wage identifiers, modification history, and references to Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. It serves as a critical reference for contractors to comply with labor standards on federally funded construction projects in the specified geographic area.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Golden Spike National Historical Park General Notes: This document contains the general notes for the construction project at Golden Spike National Historical Park. It outlines the responsibilities of the General Contractor (GC), coordination requirements, compliance with codes and regulations, and procedures for handling discrepancies and field verification. The notes emphasize the use of complete construction drawings and specifications, coordination with subcontractors, and adherence to safety and environmental standards. The document also covers requirements for permits, fire safety, utility protection, and maintenance of construction plans on site. It serves as a critical guide for the GC to ensure proper execution and compliance throughout the project.
PDF
PDF, High priority: read this firstsubmittal-list
HighAI Summary for GOSP 304881 Remodel Visitor Center Submittal List: This document is a Submittal List for the project titled 'Remodel Visitor Center for New Exhibits' with PMIS number GOSP 304881. It includes detailed specification sections, descriptions, and requirements for various submittals such as coordination drawings, schedule of values, demolition submittals, concrete product data, metal fabrications, and carpentry product data. The list also contains columns for architect/engineer review time estimates and indicates which submittals require action or informational review. The document is intended for use in Architect/Engineer construction service task order negotiations and provides a structured template for tracking submittal reviews and responsibilities across multiple engineering disciplines.
XLSX
XLSX, High priority: read this firsttemplate
HighAI Summary for Limitations on Subcontracting Report Template v1 Dec 15 2016: This document is a template for reporting limitations on subcontracting for contracts and indefinite delivery vehicles (IDVs), version 1 dated December 15, 2016. It includes fields for contract number, type of set-aside, total contract value, performance period, and types of services. The template captures payment amounts to the prime contractor, similarly situated subcontractors (SSS), and non-similarly situated subcontractors (NSS), along with calculations for the limitation on subcontracting percentage. It is designed to be filled with specific contract data and supports multiple task orders for IDVs.
DOCX
DOCX, High priority: read this firstpresolicitation
HighAI Summary for Pre-Solicitation Notice for Remodel Visitor Center at Golden Spike NHS: This Pre-solicitation Notice (SAM Notice ID: 140P1426R0012) issued by the Northern Rockies Major Acquisition Buying Office provides information for the upcoming Request for Proposal for remodeling the Visitor Center at Golden Spike National Historic Site. The project involves modifications to a 4,500 sq ft visitor center including exhibit construction, HVAC and electrical system upgrades, and building expansion. The anticipated solicitation release is late May 2026. The procurement is a firm fixed price contract estimated between $1M and $5M, with a period of performance from October 15, 2026, to December 31, 2027. It is set aside as a Total Small Business Set-Aside, subject to change based on market research. NAICS code 236220 applies, with a small business size standard of $45M. Vendors must register on SAM.gov to receive notifications and submit proposals.
XLSX
XLSX, High priority: read this firstrfi-responses
HighAI Summary for RFI Responses Amendment 4 for Golden Spike Visitor Center Remodel: This document is Amendment 4 containing responses to Requests for Information (RFIs) related to the Golden Spike Visitor Center Remodel project. It addresses contractor questions on various topics including project manual discrepancies, quantity clarifications, asphalt paving, prevailing wage determinations, EV infrastructure, site restoration, water line installation, construction phasing, fire protection, foundation design, exhibit scope, accessibility, historic finishes, and temporary facilities. The responses clarify specifications, reference drawings and amendments, and confirm applicable wage determinations and construction requirements.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 140P1426R0012 Remodel Visitor Center Golden Spike NHS: This document is a Request for Proposals (RFP) issued on 06/07/2026 for the Remodel Visitor Center for New Exhibits at Golden Spike National Historic Park, solicitation number 140P1426R0012. It is a firm-fixed price construction contract set aside for small businesses under NAICS code 236220. The contract requires performance within 473 calendar days after notice to proceed. The solicitation includes a base line item for the Visitor Center Main Building Renovation and option line items for reconfiguring the administration area and exterior painting. Proposals must be submitted by 07/08/2026 and include pricing for all base and option items. The document contains detailed instructions, pricing schedules, and contract clauses incorporated by reference.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Specifications for Remodel Visitor Center New Exhibits GOSP 308441: This document contains the construction specifications for the Remodel Visitor Center for New Exhibits at Golden Spike National Historic Park, project number GOSP 308441. It is a revised version dated March 17, 2026. The specifications include a detailed table of contents covering procurement and contracting requirements, general requirements, existing conditions, and multiple construction divisions such as concrete, metals, wood, thermal protection, openings, finishes, specialties, plumbing, HVAC, electrical, and more. It also lists design professionals of record and includes existing hazardous material information with references to asbestos and lead surveys. The document serves as a critical technical guide for contractors bidding and executing the project.
PDF
PDF, Low prioritysite-visit-sheet
LowAI Summary for Golden Spike National Historic Park Visitor Center Remodel Site Visit Sign-In Sheet: This document is a site visit sign-in sheet for the Visitor Center Remodel project at Golden Spike National Historic Park. The site visit took place on June 30, 2026, at 11:00 AM MDT. It lists attendees from various companies including their names, companies, phone numbers, and email addresses. The document serves as a record of participants who attended the site visit related to the project.
PDF
PDF, Low priorityreference-drawings
LowAI Summary for Reference Drawings for Original Visitor Center As-Builts 1968 Amendment 4: This document contains reference drawings related to the Original Visitor Center at Golden Spike National Historic Site, under the United States Department of the Interior National Park Service. The drawings are as-built from 1968 and are part of Amendment 4. The document appears to be a collection of architectural or construction drawings used for reference purposes.
DOCX
DOCX, Low priority3 pages · sources-sought
LowAI Summary for Sources Sought - Remodel Visitor Center at Golden Spike National Historic Park: This Sources Sought Notice (ID: 140P1426R0012) issued by the Department of the Interior's Northern Rockies Major Acquisition Office on March 6, 2026, is for market research only and does not constitute a solicitation. It seeks capability statements from qualified contractors for remodeling the 4,500-square-foot Visitor Center at Golden Spike National Historic Park, including updates to electrical, HVAC, fire protection, and asbestos abatement. The estimated construction value is between $1,000,000 and $5,000,000. The notice targets various small business categories and requests detailed business, experience, bonding, and technical capability information. Responses are due by March 19, 2026, and submission instructions specify a 5-page PDF format. The anticipated solicitation posting is in early or mid-May 2026.
This Sources Sought Notice is issued for market research purposes only and pertains to the planned remodel of the Visitor Center at Golden Spike National Historical Park. Interested and capable contractors are encouraged to review the attached document for additional project information and submission requirements.
More opportunities from Department Of The Interior → Imr Northern ROCKIES(12200)