Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Z--WA-CENTRAL WASH NWRC-REPLACE FUEL TANKS

Awarded
140FC326Q0033Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation 140FC326Q0033 is a total small business set-aside contract issued by the Department of the Interior's Construction A/e Team 3 Fws for the replacement of fuel tanks at the Central Washington National Wildlife Refuge Complex. The project involves the removal, cleaning, and recycling of existing tanks and the installation of new UL-2085 listed double-wall fire-protected aboveground storage tanks and pump accessories at three specific locations: Conboy Lake NWR, Columbia NWR, and the Hanford Reach ALE Unit. The scope of work includes the provision of tanks that meet NFPA 30, NFPA 30A, and IFC standards, with specific requirements for leak detection, emergency venting, and secondary containment. Optional tasks may include the removal of used oil tanks and the installation of metal canopy covers. The period of performance is scheduled from July 30, 2026, to July 30, 2027. This is a lowest-price technically acceptable award based on a bid schedule that includes base bid tasks and alternative quotations. While no bid bond is required, payment bonds are mandatory for awards exceeding 35,000 dollars, and both payment and performance bonds are required for awards exceeding 150,000 dollars. Contractors must adhere to Davis-Bacon wage determinations for Spokane County, Washington, and comply with RCRA and other applicable federal, state, and local regulations. Coordination includes mandatory multi-day site visits and strict adherence to technical specifications for the installation of fire-rated tanks and associated Fill-Rite pump systems.

General Info

Small business contract to replace fuel tanks at Central Washington National Wildlife Refuge.

Contract Value

$224,836

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

21

140FC326Q0033 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

140FC326Q0033 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

140FC326Q0033 Amendment 0003

PDF, High priority: read this first2 pages · amendment
High

140FC326Q0033 – Solicitation and Award (Construction, Alteration, or Repair)

PDF, High priority: read this first3 pages · ifb
High

4000-0026 Fireguard Horizontal Storage Tank Manual Fill-Rite Pump

PDF, High priority: read this first5 pages · specifications
High

A04_SOW_0002 - Statement of Work and Price Schedule

PDF, High priority: read this first18 pages · sow
High

A04 - SOW: Install Above Ground Fuel Storage Tanks and Removal Actions

PDF, High priority: read this first18 pages · sow
High

A06 Attachment 5 Above Ground Fuel Storage Checklist STM approved 24

PDF, High priority: read this first2 pages · checklist
High

A21 Bid Schedule for Fuel Tank Installation and Removal

DOCX, High priority: read this first1 page · bid-schedule
High

Bid Schedule for Fuel Storage Tanks Installation and Removal

DOCX, High priority: read this first1 page · bid-schedule
High

Doc #4000-0026 Fireguard Horizontal Storage Tank Manual Fill-Rite Pump

PDF, High priority: read this first5 pages · specifications
High

Drawing #785600 - 1000 Gallon ConVault Tank

PDF, High priority: read this firstspecifications
High

Fireguard Product Sheet - Specifications and Dimensions

PDF, High priority: read this first2 pages · specifications
High

IR-WA-687-25 Conboy Lake NWR Administrative Headquarters Site Development Plans

PDF, High priority: read this firstsow
High

RFQ B01 – Installation of Above Ground Storage Fuel Tanks and Pumps

PDF, High priority: read this first144 pages · rfq
High

TrueNorth Steel Fireguard UL 2085 Fire-Rated Above Ground Tanks

PDF, High priority: read this first4 pages · specifications
High

WA20260114 Wage Determination - Spokane County, WA

PDF, High priority: read this first7 pages · wage-determination
High

Fireguard Product Sheet - Aboveground Storage Tank Specifications

PDF, Medium priority2 pages · specifications
Medium

Fireguard Double-Wall Fire-Protected Aboveground Storage Tank Product Sheet

PDF, Low priority2 pages · product-sheet
Low

RFI Responses 0003 – All Sites Q&A

PDF, Low priority9 pages · q-and-a
Low

Site Visit Information

PDF, Low priority1 page · special-notice
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 3 Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Office AddressFalls Church, VA, 22041, USA

Full Description

Show more
WA-CENTRAL WASH NWRC-REPLACE FUEL TANKS

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a firm fixed price contract issued by the Omaha District of the U.S. Army Corps of Engineers for fueling system repairs at the W.H. Ford Regional Training Center in Greenville, Kentucky. This project is a total small business set-aside under NAICS code 237120. The scope of work involves comprehensive repairs and upgrades to a fuel storage and dispensing facility, specifically focusing on two 10,000 gallon above ground storage tanks. Key tasks include repairing concrete and pavement, installing emergency fuel shutoff stations and leak detection equipment, recoating fuel system canopies and piping, replacing tank vents, improving grounding systems, and upgrading the automatic tank gauging system and associated controls. All work must be completed by June 18, 2027, with a proposed performance period of 410 calendar days. The government will award the contract using the Lowest Price Technically Acceptable (LPTA) source selection process. To be deemed technically acceptable, offerors must provide evidence of specialized experience through three to five completed projects from the last five years, a logical Gantt chart covering preconstruction, on-site construction, and post-construction phases, and a well-defined technical approach for construction and risk mitigation. The contract mandates strict adherence to EM 385-1-1 safety requirements, the Davis-Bacon Act, and Buy American regulations. Additionally, the contractor must ensure a minimum of 60 percent of total project solid waste is diverted from landfills. Proposals must be submitted in two separate volumes, keeping pricing information isolated from the technical submission.
W071 Endist Omaha

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

3 days ago

DEADLINE

in 3 months
View Details
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

14 days ago

DEADLINE

in 7 days
View Details
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

14 days ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of The Interior → Construction A/e Team 3 Fws

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS