Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Z--Wood River Cutoff Wall Construction

Active
W912P913RPLA1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers St. Louis District is conducting a special notice seeking input from the construction community regarding the potential implementation of Project Labor Agreements (PLAs) for the Wood River Cutoff Wall Construction project, a large-scale endeavor exceeding $20 million. This project involves constructing two slurry trench cutoff walls along the eastern bank of the Mississippi River between Alton and Wood River, Illinois. The Upper Wood River feature consists of a shallow soil-bentonite slurry trench wall approximately 55 feet deep and 1,600 feet long, while the Lower Wood River element includes a deep cement-bentonite panel slurry trench wall extending 145 feet into limestone bedrock over a length of about 1,900 feet. The construction process faces complex geotechnical challenges, including varied soil strata and strict verticality and permeability requirements, with the need for precise material testing and specialized equipment. The Corps is soliciting detailed feedback on the use of PLAs to address workforce availability, project scheduling, labor costs, risk mitigation, and compliance with federal labor standards. Responses are requested on various topics, such as the suitability of PLAs for this project and others in the region, the impact on small business participation, and past project experiences involving PLAs. Additionally, the Corps seeks technical input on construction methods, equipment, and testing protocols vital to meeting stringent project specifications. Responses are to be submitted by mid-May 2013, and the notice emphasizes that this solicitation is strictly for market research and not a request for proposals or a binding commitment. The primary contact for this effort is the St. Louis District Contract Specialist.

General Info

U.S. Army Corps seeks input on Project Labor Agreements for $20M Wood River cutoff wall construction.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MO

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Louis
ContactsNo contacts available
OfficeSAINT LOUIS, MO, 63103-2833, USA
Office AddressSAINT LOUIS, MO, 63103-2833, USA
ContactsNo contact information available

Full Description

Show more
This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The Corps of Engineers St Louis District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a construction project (exceeding $20 million) within the U.S. Army Corps of Engineering, St Louis District area of operations in IL and surrounding areas. This market survey is being posted for the Wood River Cutoff Wall Construction. Description of Work: The Wood River Drainage and Levee District levees are generally located along the eastern bank of the Mississippi River, between Alton, Illinois and Wood River, Illinois. Two slurry trench seepage cutoff walls will be constructed. In Alton, Illinois, the Upper Wood River shallow slurry trench wall will be constructed of a continuous soil-bentonite mix approximately 55 feet deep, approximately 1,600 feet long and approximately two to three feet wide. The slurry wall will be tied into a continuous clay layer approximately 50 feet below existing ground. Downstream of the Upper Wood River shallow slurry trench wall is the Lower Wood River deep slurry trench wall. The Lower Wood River deep slurry trench wall will be constructed with 20 to 30-foot long cement-bentonite mixture panels totaling approximately 1,900 feet in length, two to three-foot wide panels, 145 feet deep, and cut into limestone bedrock forming two to three-foot deep rock sockets in the limestone bedrock. The Lower Wood River deep slurry trench wall will be constructed through 5 to 20 feet of alternating strata of clays, silts, and sands underlain by 100 to 140 feet of poorly graded sands with zones of gravels, cobbles, and boulders. Glacial tills and shale may overlay the limestone bedrock and shall be excavated through down into the bedrock. Panel walls will be subject to strict verticality requirements constructed with guide walls at the top. Short stretches of jet grout columns may be required under, over, and around existing utilities and bridges. A test section will be required in order to prove that the proposed means and methods meet the contract requirements. PLA CONSIDERATIONS: A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Accordingly, Offerors are requested to respond to this Special Notice regarding PLA with the following information. (1) Should PLAs be executed on this selected contract in IL and surrounding area? (2) Are there concerns by prime contractors on the availability of skilled construction labor? (3) Would a PLA benefit a project which contains a unique and compelling mission-critical schedule? (4) What type of project should be considered for PLA clauses? (5) How will the use of a PLA impact time required to complete the project? (6) How will the use of a PLA impact the cost of the project? (7) What other factors should the Corps consider before deciding to include PLA provisions in a St Louis Engineer District contract? (8) Please provide a list of recent (2-5 years) construction projects in the local labor market of the project under consideration. Include the following items: Project Name/Location/Project Description/Initial Cost Estimate/Actual Final Cost. Was the project completed on time? Number of craft trades present on the project? PLA (Y/N)? Were there any challenges experienced during the project? 1. 2. (9)Which trades are expected to be employed on this project? (10) Does the local market contain the sufficient number of available skilled workers for this project? Are there other projects in the vicinity going to limit the pool of skill labor available for your project? (11) Has a project like this been done before in the local market? (12) Have PLAs been used on comparable projects undertaken by the public sector in this geographic region? Have PLAs been used on this type of project in other regions? (13) Could a PLA contribute to cost savings in any of the following ways? -Harmonization of shifts and holidays between the trades to cut labor costs? -Minimization disruptions that may arise due to expiration of CBA? -Availability of trained, registered apprentices, efficient for highly skilled workforce? -Allowing for changes in apprentice to journeyman ration. -Serving as management tool that ensure highly skilled workers from multiple trades are coordinated in the most efficient way. -Others? (14) Could a PLA minimize risk and contribute to greater efficiency in any of the following ways? -Mechanisms to avoid delays -Complying with Davis Bacon and other labor standards, safety rules and EEO and OFCP laws. -Ensuring a steady supply of skilled labor in markets with low supply or high competition for workers. (15) Are there ways in which a PLA might increase costs on this particular project? (16) Is the use of PLAs conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters? Are there instances where these standards have not been met on Federal contracts in the local area? Were PLAs used for those specific contracts? (17) Projects will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. Do you foresee any work on projects that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade? (18) How will a PLA impact the completion time? Would a PLA benefit a project which contains a unique and compelling mission-critical schedule? (19) Where have PLAs been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of this project? (20). Will the use of PLAs impact the ability of potential Offerors and subcontractors to meet small business utilization goals? TECHNICAL CONSIDERATIONS: Upper Wood River - Shallow Cutoff Wall 1. How does the contractor propose to construct a continuous soil-bentonite cutoff wall to depths of 55 feet? 2. How does the contractor propose to construct a continuous soil-bentonite cutoff wall in soil conditions ranging from sands, gravels, zones of cobbles, and zones of boulders? 3. How does the contractor propose to construct the wall using a soil-bentonite backfill with a minimum permeability of approximately 1x10-6cm/s? (to be determined during design) 4. How does the contractor propose to verify that the required permeability has been met through permeability testing of wet grab samples obtained from various depths? 5. How does the contractor propose to maintain the slurry within 2 feet of the ground surface? 6. An equipment list shall be provided. The list shall include the number and types of equipment the contractor plans to use for the continuous soil-bentonite cutoff wall. Lower Wood River - Deep Cutoff Wall 1. How does the contractor propose to excavate narrow two to three-foot wide panels, 20 to 30 feet long excavations, with depths of 145 feet deep using panel construction in alluvial deposits ranging from clays, silts, sands, gravels, cobbles, and boulders? 2. How does the contractor propose to meet a maximum 1% verticality requirement in excavating into alluvial deposits ranging from clays, silts, sands, gravels, cobbles, and boulders? 3. How does the contractor propose to socket the bottom of the wall panels approximately 2 to 3 ft into limestone bedrock at depths of 145 feet? 4. How does the contractor propose to meet minimum permeability requirements? (possibly 1x10-6cm/s to be determined during design) 5. How does the contractor propose to construct a cement-bentonite wall that meets a specified strength range between 75 and 100 psi? (to be determined during design) 6. How does the contractor propose to obtain wet grab samples of the cement bentonite slurry at various depths throughout the panel wall construction? 7. How does the contractor propose to perform strength and permeability tests on those wet- grab samples? 8. How does the contractor propose to continuously maintain the top of the slurry/backfill within 2 feet of the ground surface? 9. How does the contractor propose to construct cement-bentonite jet-grouted columns to depths of 145 ft around and below utilities and bridges? 10. An equipment list shall be provided of the number and types of equipment the contractor plans to use for the construction of 145-foot deep, 20 to 30-foot long cement-bentonite panels excavated down into limestone bedrock two to three feet deep. 11. How does the contractor propose to construct 145-foot deep, jet grouted columns around and under utilities and bridges? 12. An equipment list shall be provided. List shall include the number and types of equipment the contractor plans to use for the construction of 145-foot deep, jet grouted columns. Interested Offerors shall respond to this Special Notice no later than 13 May 2013. Mail, or E-mail your response to U.S. Army Engineer St. Louis District, Attn: CEMVS-CT/ Contracting Division, Attn: Barrietta Killiebrew, St Louis District, Corps of Engineers, 1222 Spruce Street, Room 4.207, St Louis, Missouri, 63103-2833 or e-mail to contact@example.gov. No Faxing. This Special Notice is not to be construed as a commitment by the Government, nor will the Government pay for the information solicited. Please direct any questions on this announcement to Barrietta Killiebrew at the addresses shown above. Contracting Office Address: U.S Army Corps of Engineers St Louis District, Contracting Division 1222 Spruce Street, Room 4.207 St. Louis, Missouri 63103-2833 United States Place of Performance: Eastern bank of the Mississippi River, between Alton, Illinois and Wood River, Illinois. United States Primary Point of Contact: Barrietta Killiebrew Contract Specialist contact@example.gov Phone: +1 (555) 000-0000

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 10 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Department Of Defense → W07V Endist St Louis

Same awarding agency

NAICS: 562910
New
Federal
ENVIRONMENTAL REMEDIATION SERVICES MULTIPLE AWARD TASK ORDER CONTRACT W912P9
Solicitation # W912P927RA004
The U.S. Army Corps of Engineers St. Louis District is conducting market research through a Sources Sought notice to identify capable businesses for a future Multiple Award Task Order Contract. The anticipated contract is a five year Indefinite Delivery Indefinite Quantity IDIQ with a Firm Fixed Price structure and a total ceiling of 150 million dollars. This effort focuses on Hazardous, Toxic and Radioactive Waste environmental remediation services supporting civilian and military federal agencies. The scope includes a wide range of activities such as sampling, testing, removal, disposal, and restoration of contaminated materials, as well as dredging, wastewater treatment plant operations, and the demolition of contaminated structures. Key programs supported include Superfund, Brownfields, FUSRAP, and the Defense Environmental Restoration Program. Technical requirements include the use of MARSSIM sampling and drilling standards, GIS modeling integrated with the FUSRAP Environmental Data Management System, and performance reporting via an Earned Value Management System. This opportunity is intended as a small business set aside, and interested firms must be registered in SAM.gov and the Procurement Integrated Enterprise Environment. To participate in this market research phase, respondents must submit a capability statement of no more than five pages, including company identification, business size, subcontracting intent, and up to three relevant past performance projects from the last five years, to Marla Sawyer by November 12, 2026.
Remediation Services

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 237990
Federal
LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Solicitation # W912P926RA004
The U.S. Army Corps of Engineers, St. Louis District, is soliciting proposals for the design, construction, and commissioning of a new 1,200-foot drilled-shaft founded lock chamber at Lock and Dam 25 in Winfield, Missouri. This project, part of the Navigation and Ecosystem Sustainability Program, includes the construction of a 1,200-foot upstream ported guard wall and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place to serve as an auxiliary chamber for recreational traffic or emergency use. The contract is structured as a firm-fixed-price base plus options agreement, with a base period of 1,825 calendar days and four optional periods of 365 days each. Award will be determined using a best-value tradeoff process based on five evaluation factors: past performance, construction approach, river and intermediate wall means and methods, small business participation, and price. To be eligible, offerors must be rated at least acceptable in all non-cost factors. The solicitation includes an economic price adjustment clause based on the Producer Price Index for commodities like steel and concrete to mitigate market volatility. Key requirements include the submission of a project labor agreement, adherence to Buy American Act standards, and the use of specific brand-name instrumentation and control systems for compatibility with existing infrastructure. Proposals must be submitted electronically via the PIEE Solicitation module by December 9, 2026.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in about 1 month
View Details
NAICS: 111421
Federal
Sources Sought Notice W912P927QA001 Rivers Project Office (RPO) Tree and Plant Material Blanket Purchase Agreement (BPA) Supply
Solicitation # W912P927QA001
The Department of Defense, through the U.S. Army Corps of Engineers St. Louis District, has issued Sources Sought Notice W912P927QA001 to conduct market research for an anticipated five year Blanket Purchase Agreement (BPA). The objective is to identify qualified contractors capable of supplying and delivering tree cuttings, bare root seedlings, and container trees to various locations across Missouri and Illinois, specifically covering alluvial floodplains, upland forests, prairies, and watersheds. All materials must be top quality, healthy, and free from disease or pests, adhering to the American Association of Nurserymen, Inc. rules and ANSI Standard Z60.2 2025. Technical requirements specify that tree cuttings must be between 0.75 and 3 inches in diameter and at least 20 inches long, stored at 33 to 40 degrees Fahrenheit. Bare root seedlings must be at least one year old with a minimum height of 12 inches, sourced from Mississippi River System floodplain sites in Illinois or Missouri. Container trees must be root-pruned to ensure a dense, non-curling root system, with potting mix inoculated with mycorrhizae. Interested firms must be registered in the System for Award Management under NAICS Code 111421 and are requested to submit a capability statement by October 20, 2026, including past performance from the last five years and wholesale pricing for 2027.
Nursery and Tree Production

POSTED

14 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS