Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--578-M26106 ED AiPhone AP: 36C252-26-AP-2722 PR: 578-26-4-6121-0567

Closed
36C25226Q0457Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 12 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This sources sought notice issued by the Department of Veterans Affairs, through the 252-NETWORK Contract Office 12, seeks information from qualified contractors capable of performing electrical and communication system upgrades at the Edward Hines Jr. VA Hospital Emergency Department in Hines, Illinois. The work involves installing five new Cat6 data drops, replacing outdated wiring, and setting up Government Furnished Equipment including AiPhone units, video doorbells, and associated hardware, all to be completed during off-hours—7:00 PM to 5:00 AM Monday through Friday—to avoid disrupting patient care. The entire project, including pre-construction planning, material delivery, on-site work, and closeout, must be completed within 30 days, with actual field operations limited to no more than four days. Contractors must comply with strict infection control protocols, including the use of a rigid, smoke-tight, noncombustible infection control barrier manufactured by Edge Guard or an approved equivalent, and must submit detailed Infection Control Plans and adhere to ICRA and PCRA guidelines. All personnel must hold current OSHA certifications, and an OSHA-certified site superintendent must be present during all work. A mandatory badging process through the VA’s PIV system is required for every workforce member, involving fingerprinting and ID verification, with badges expiring after 182 days and subject to renewal if work extends beyond that period. Contractors must also submit comprehensive documentation including a Construction Security Plan, Work Breakdown Schedule, Baseline Schedule, Schedule of Values, and Existing Conditions Survey, all in approved formats, and respond to RFIs within prescribed timeframes. Deliverables must include final as-built drawings, warranties, O&M manuals, and staff training records. The work falls under NAICS code 238210, and respondents must disclose their size status, SAM.gov UEID, socioeconomic certifications such as SDVOSB, VOSB, or HUBZone, and whether the required services are currently available under any existing federal contract. Responses are voluntary, not compensated, and do not constitute a commitment to award. This notice is for market research only, with no guarantee of future solicitation or award, and all submissions must be sent via email to Rebecca Picchi by 10:00 AM Central Time on May 15, 2026. The Government expects full compliance with the Buy American Act and VA Technical Information Library standards, and prohibits unauthorized photography of patients or staff.

General Info

VA seeks qualified contractors for AiPhone and Cat6 wiring installation at Hines VAMC Emergency Department.

Agency

Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

WI

Set-Aside

NONE

Documents

(1)

Sources Sought Notice 36C25226Q0457 for Electrical Contractors

DOCXsources-sought

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
Contacts1 person available
OfficeMILWAUKEE, WI, 53214, USA
Organization / Agency
Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
View Agency Profile
Office AddressMILWAUKEE, WI, 53214, USA

Full Description

Show more
Sources Sought Notice
Sources Sought Notice
Page 5 of 5 *= Required Field Sources Sought Notice
Page 1 of 5 This Sources Sought Notice is for informational and planning purposes only and shall not be construed as a solicitation or as an obligation or commitment by the Government. This notice is intended strictly for market research. The purpose of this Sources Sought Notice is to obtain information from qualified sources with special interest relative to the North American Industry Classification Code (NAICS) 238210 Electrical Contractors and Other Wiring Installation Contractors.
The Government will not pay for information received in response to this Sources Sought, nor will the Government compensate any respondent for any cost incurred in developing the information provided. This Sources Sought does not constitute a commitment by the Government. Information provided in response to this market survey will be used for informational purposes only and will not be released. Contractor participation is not a promise of future business with the Government.
Requirement The VA Great Lakes Health Care System, Veterans Integrated Services Network (VISN) 12, Hines VAMC is seeking contractors capable of performing the work on the Statement of Work (SOW) located below. Note that this is a draft of the SOW and is subject to change.
Item Qty Unit Description 0001 1 JB Data Drop for AIPhone and Connect and Setup AIPhone
Interested parties must include the following information:
Company name, address, point of contact, SAM.gov UEID and email address.
Size status and representation/s of the company (i.e., Service-Disabled Veteran Owned Small Business (SDVOSB), Veteran Owned Small Business (VOSB), HUBZone, Woman Owned Small Business (WOSB), Large Business, etc.). Any SDVOB or VOSB must be certified.
Is the company considered a small business under the NAICS code 238210?
If the company has a current federal contract, are the services being offered available on the contract?
Questions should be sent to Rebecca Picchi at Rebecca.picchi@va.gov.
Responses to this source sought must be received no later than May 15, 2026 at 10:00am.
As a reminder, this is a Sources Sought announcement only. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.
Interested vendors are reminded that in accordance with FAR 4.1102(a) Offerors and quoters are required to be registered in SAM at the time an offer or quotation is submitted in order to comply with the annual representations and certifications requirements. Registration is available at www.sam.gov. Performance Work Statement Description of Service The contractor shall provide all labor, material, tools, travel, management, and equipment necessary to perform five (5) new Cat6 data drops and install new AiPhone at the Edward Hines Jr. VA Hospital, Building 200, Emergency Department (ED), 5000 South 5th Avenue, Hines, Illinois 60141.
Background/History/Current Conditions Hines VA is an active medical campus. The contractor must not interfere with patient care or VA staff unless given permission in writing from the Contracting Officer s Representative (COR) or Contracting Officer (CO). Hines VA ED has outdated communication technology that cannot be supported by Hines Engineering Operation & Maintenance (O&M).
Objective/Scope of Work Contractor shall: Pull new Cat6 while removing existing 18/4 (or other sized) communication wire Install new Government Furnished Equipment AiPhones and support accessories Work with Hines Engineering, Hines Police, Hines ED, and AiPhone representative, for installation, start-up, and Hines VA ED staff training
Period of Performance The duration of onsite work from mobilization to completion is expected not to exceed four (4) days. The entire contract duration includes pre-construction items such as submittal approvals, material lead times, onsite work, and final invoice/close out, shall be thirty (30) days.
Please Note: New data drops and removal of existing communication wire shall be performed at night. (Off-hours: 7:00pm 5am Monday Friday)
Deliverables and Tasks Contractor shall: Deliverable 1: Replace two existing video doorbell wall boxes with SBX-IDVF (see Attachment 1, Page 2) Deliverable 2: Replace five (5) existing communication wires with new Cat6 (see Attachment 1, Page 1) Estimated 500 linear feet total Install and plug-in GFE Please note: Deliverable 1 and 2 require use of HEPA cart or rigid infection control panels for above dropped ceiling work. Deliverable 3: Attend start-up meeting and ensure communications between devices installed Meeting will be arranged and scheduled by contractor and attended by Hines Engineering Hines ED AiPhone representative
Government Furnished Equipment (2) Wall box (2) Video Doorbell (2) Video Master Station (1) Multi-purpose Adapter (1) Switch
Requirements Where a conflict exists between the Performance Work Statement (PWS) requirements and the requirements of other associated contract documents, the PWS requirements shall prevail. This PWS presumes the contractor will NOT need access to the Hines LAN or any VA sensitive information to execute the contract. The awarded contractor will adhere to all codes, standards, guidelines, & design requirements found in the VA s Technical Information Library (TIL), State of Illinois, and Cook County, including but not limited to the following: Pre-quote site visit: A site walk is encouraged. The intent of this walkthrough is to give the contractor access to the project site so that an accurate evaluation of the project requirements and site assessment can be made. Infection Control Barrier (ICB): To protect the patients and VA staff, any work performed onsite must follow the Infection Control Risk Assessment (ICRA) and the Preconstruction Risk Assessment (PCRA) when applicable. See attachments for details on these requirements. The Contractor shall provide and install a rigid infection control panel system manufactured by Edge Guard out of Bement, Illinois or an approved equal. http://www.edge-guard.com/home.html. Salient details of the infection control barrier are: Temporary construction partitions shall be smoke-tight and built of noncombustible materials that will not contribute to the development or spread of fire. Barriers shall not obstruct access to emergency services and for fire, police, and other emergency forces. The barrier must be water resistant; capable of being cleaned and sanitized. Fire-resistant plastic sheeting may be used to supplement the rigid infection control panel system. COR approval is required. The contractor shall submit an RFI requesting approval during the bid period. RFI submittals: The contractor shall submit any RFI s resulting from the site walk within five (5) working days to the CO. Unless otherwise stated the contractor shall allow ten (10) working days to respond to any RFI. Project pay applications: All submitted project pay applications require certified payroll & waste report documents to be current with each pay submission. Approval of all invoices will require documents to be current. Work outside of normal business hours or weekends is required for this project: Required for Deliverables 1 & 2. Certifications: The contractor shall provide OSHA certifications for all personnel performing any work disciplines. These certifications shall be supplied to the COR and retained as a permanent record of the project folder. OSHA certification: The contractor shall have an OSHA certified site superintendent on site whenever any work is being performed. A copy of the OSHA certification shall be supplied to the COR prior to the start of any work and retained as part of the project folder. Post-Award meeting: This meeting shall be coordinated by the government with the awardee. The goal of this meeting is to clarify any coordinating instructions and questions the Contractor may have regarding the contract documents in advance of commencing construction activities, delivery of project submittals, submission of the project schedule, the coordination of project tasks, etc.
Reports and Documentation Schedule. The contractor is responsible for submitting a schedule of sufficient detail for review by the COR and approval by the Contracting Officer. The schedule shall be submitted within (10) days of the Contract Notice to Proceed and must be approved prior to any onsite work beginning.
Constraints Photographs may be taken of the work performed at the jobsite subject to review. However, photographs containing patients and/or staff are a violation of the Patient Privacy and hospital policy. Both violations are subject to penalties and dismissal. Permission from the EHVAH Public Affairs Officer (PAO) is required and should be coordinated with the project COR. VHA Directive 1085 implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities. Maximizing Use of American-Made Goods, Products, and Materials The Buy American Act required the United States government to prefer U.S.-made products in its purchases. It is the policy of the United States to buy American and to maximize, consistent with law, the use of goods, products, and materials produced in the United States. Material purchases should adhere to this policy to the greatest extent possible. The contractor badging process is a required security procedure of all VA stations. It is the responsibility of the general or prime contractors to notify their subcontractors of this requirement. All contracted workers visiting the jobsite will need to receive a contractor s PIV badge. This is to be done before any construction or demolition work is started on the project. Failure to obtain and display the proper badge could result in the worker being removed from the station by Hines Police.
The procedure to follow is: The Contractor shall have 10 days from award to begin on-boarding team members with the necessary badging. The Contractor shall fill out Contractor Badging Form See Attachment 2.  Two (2) forms are personal identification are needed.  Valid (unexpired) forms of ID include: Current Driver s License.  A Real ID is required. An original social security card (not laminated). Substitutes may include:  Current Passport Original birth certificate (not a copy) Additional forms of identification can be found on Page 2 of the Contractor Badging Form See Attachment 2. The Contractor shall coordinate with COR and bring the completed Contractor Badging Form to the official on Hines Campus    Once the form is approved by the official, contractors shall take a copy of the form to Human Resources for fingerprinting.  The hours for fingerprinting are 8:00 AM to 3:00 PM.  The other copy will stay with Hines Engineering. Upon a favorable fingerprint adjudication, the contractor will schedule an appointment with HR to receive a Flash badge.  The link to schedule this appointment will be provided upon notification of successful fingerprint adjudication. The badge expires in 182 calendar days or less.  It is the responsibility of the badge holder to schedule and renew their badge if they expect to be on the jobsite more than 182 calendar days from the date of issuance. At the completion of the project, all prime and subcontractor badges need to be returned to the station.  It is the responsibility of the general or prime contractors to see that all badges are returned to the COR once work on the project is complete.  
Tasks and Responsibilities A pre-construction (kick-off) meeting between the stakeholders and key GC team members will be conducted to review project objectives, scope, deliverables, communication, site access, baseline schedule, and responsibilities. After this meeting the awarded GC firm shall provide their services according to the approved project baseline schedule. Preconstruction Period: The Contractor shall provide the following: Construction Security Plan: Defines both physical and administrative security. Construction Work Breakdown Schedule: The WBS including start/end dates, duration, and sequencing, preferably in MS Project or Primavera format (include floats). Construction Baseline Schedule: Contractor to provide after Kick-off meeting integrating Government comments. To include Critical Path, start/end dates, duration, floats, and sequencing, preferably in MS Project or Primavera Schedule of Values: A detailed breakdown for payments, by materials and labor for each company and subcontractor. The Schedule of Value is a representative breakdown of the Contractors firm, fixed price. Each portion of the Schedule of Values represents the amount the government paid to the contractor for that portion of the work. Because it is a firm fixed priced contract, so too is the Schedule of Values. It is not fluid and does not change after submission and approval. The Schedule of Values can only be changed through a modification from the CO. Existing Conditions Survey: Before any work is started, the Contractor shall conduct a thorough survey with the COR of the buildings or areas of buildings in which alterations occur and areas which are anticipated routes of access. Infection Control Plan (ICP): Narrative description of the dust control and debris disposal process including disposal destination and methodology. Document Submissions. All documents included as Attachments to this SOW that are required to be filled out and signed or jointly signed by the Contractor. Certificates, Licenses, and Training Documents. Obtain PIV badges. RFI s: Other than those resulting directly from demolition or construction. Construction Period: Along with coordinating the construction of the project, the Contractor shall provide the following during construction services: Submit RFI s during construction as necessary. Construction Close-out Period: The Contractor shall provide the following: Inspection and Approval by the COR and/or the CO. Final Approval and Beneficial Occupancy when applicable. Warranties documents and O&M Manuals. Staff training when applicable. Contractor Release of Claims. The COR shall review the Contractor s close-out submissions for thoroughness and conformance with the contract document requirements. The COR shall also review field-marked as-built drawings for conformance with final installations.
Final Deliverables Close-out manuals, installation diagrams, and warranty certificates.

More opportunities from Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)

Same awarding agency

NAICS: 517111
New
Federal
FHCC Satellite TV Installation and Programming
Solicitation # 36C25226Q0706
The Department of Veterans Affairs Great Lakes Acquisition Center is soliciting quotes for the installation and annual programming of a DirecTV COM3000 Advanced Entertainment Platform system at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves upgrading television services in Building 133 to provide high-quality linear satellite and broadband over-the-top content for patients, staff, and visitors. Key technical requirements include the installation of 100 Pro:Idiom converter boxes and a system capacity of 92 channels, consisting of 86 cable channels and 6 in-house channels. The programming package must include DTV Locals, a Regional Sports Package, and a VIP Service Plan, supporting a total of 263 units. The contract structure consists of a base year running from September 15, 2026, to August 31, 2027, with four optional one-year extensions through August 31, 2031. Installation must be completed within 60 calendar days of the award. This is a HUBZONE Small set-aside procurement, and the government will evaluate quotes based on technical capability and the best benefit to the government, with preference given to SDVOSB/VOSB entities. All work must comply with OSHA, NFPA, and VA safety and infection control standards. Payments are processed monthly in arrears via electronic funds transfer through the Tungsten Network e-Invoicing system.
Wired Telecommunications Carriers

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 238290
New
Federal
Z1DA--Construction of Ogden Elevator Cab Interiors Jesse Brown Medical Center
Solicitation # 36C25226B0033_1
Solicitation 36C25226B0033 is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform interior upgrades for four elevators—P-7B, P-8B, P-9B, and freight S-10B—located in Building 11B of the Ogden Pavilion at the Jesse Brown VA Medical Center in Chicago, Illinois. The project objective is to match the design of elevator cab P-6B, which features ViviGraphix Graphica Cairo Slate Blue panels, diamond finish stainless steel ceilings with 3,200K LED downlights, and Nurazzo tile flooring. The scope includes the potential raising of elevator sills and doors to ensure flush tile installation. The project magnitude is estimated between $250,000 and $500,000, with a total performance period of 154 calendar days from the notice to proceed. Award will be granted to the responsible bidder providing the lowest priced responsive bid. Bidders must provide a bid guarantee of at least 20 percent of the bid price and submit current Experience Modification Rate (EMR) data and OSHA 300/300a forms. The contractor is required to adhere to the Davis-Bacon Act wage determinations for Cook County and maintain compliance with ASME A17.1 safety codes for elevators and escalators. Strict infection control measures are required per the ICRA renewal permit, and all construction debris must be removed daily. Key administrative requirements include the submission of daily contractor production reports (VA Form 10101) and the provision of performance and payment bonds upon award.
Other Building Equipment Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS