This Solicitation opportunity from Department Of Veterans Affairs was posted on December 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Department of Veterans Affairs, through its Central California Health Care System at the Fresno VA Medical Center, is conducting a market research effort for the planned design-build installation of permanent tieback roof anchors on Building 1. This notice is not a solicitation for a contract, nor does it guarantee future procurement; instead, it is intended to identify potential qualified contractors, particularly those classified under NAICS 236220 Commercial Building Construction, and gather information regarding their capabilities, business size and socio-economic status. The information collected will help the government determine the appropriate procurement strategy, including potential small business set-aside decisions.
The intended project requires full design and construction services to provide window-washing davit anchor systems, involving evaluation of the building's existing roof structures, engineering calculations, and preparation of construction documents compliant with relevant codes and VA specifications. The contract would include providing all necessary equipment, labor, supervision, and materials for both the design and construction phases, each scheduled for 120 calendar days, making for a total period of performance of 240 days. Respondents are required to demonstrate prior relevant experience, articulate their socio-economic status, and supply organizational identifiers. Only registered and certified businesses will be eligible for any future solicitation, which may be issued pending the results of this sources sought notice. No financial compensation will be offered for responses, and participation does not guarantee future engagement. Responses are due by October 15, 2025.
General Info
VA seeks qualified contractors for design-build permanent tieback roof anchor installation, responses due October 15.
HighAI Summary for 36C26126R0003 Amendment 0001: Amendment 0001 to solicitation 36C26126R0003 issued by the VA Sierra Pacific Network (NCO 21). The purpose of this amendment is to correct and affirm the Phase I proposal due date, extending it to December 3, 2025, at 2 PM PST, as it was previously erroneously published on SAM.gov as December 1, 2025.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for 36C26126R0003 Amendment 0002 - Install Tieback Roof Anchors: Standard Form 30 amendment 0002 to solicitation 36C26126R0003 for the installation of tieback roof anchors at Building 1 in Fresno (Project No. 570-26-611). The primary purpose of this amendment is to extend the Phase I Proposal due date from December 3, 2025, to December 11, 2025, at 2:00 PM PST to allow the Government additional time to respond to RFIs.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for 36C26126R0003 Amendment 0003: Amendment 0003 to solicitation 36C26126R0003, issued by the VA Sierra Pacific Network (NCO 21) on December 3, 2025. The primary purpose of this amendment is to correct the Phase I proposal due date from December 11, 2026, to December 11, 2025, at 2:00 PM PST.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for 36C26126R0003 Amendment 0004: Amendment 0004 to solicitation 36C26126R0003 issued by the VA Sierra Pacific Network (NCO 21). The primary purpose is to provide RFI responses and extend the Phase I proposal due date from December 11, 2025, to December 16, 2025, at 2:00 PM PST. It includes updated attachments: As-Build Drawings, Revised DB SOW for Fresno VA_B1 Tieback_R1, VA Fresno ACM Survey Asbestos Study, and RFI Responses.
XLSX
XLSX, High priority: read this firstpast-performance
HighAI Summary for 36C26126R0003 Attachment A - Phase 1 Factor 2 Experience: This document is a mandatory experience submission template (Attachment A) for solicitation 36C26126R0003. It outlines the basis of evaluation for Factor 2 (Experience), requiring offerors to provide up to six relevant design-build projects from the last five years. It includes specific definitions for relevancy, size ($500k+), complexity, and scope, as well as the adjectival rating scale used by the government to evaluate the proposals.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for 36C26126R0003 - Design-Build Service to Install Tieback Roof Anchors Building 1: Solicitation 36C26126R0003 issued on November 12, 2025, by the Department of Veterans Affairs (VISN 21) for a firm-fixed price design-build construction project to install tieback roof anchors at the Fresno VA Medical Center. This is a total SDVOSB set-aside with an estimated magnitude between $250,000 and $500,000. Proposals are due by December 3, 2025, at 2:00 PM PST. The project has a performance period of 240 calendar days after the Notice to Proceed.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for 36C26126R0003 - Install Tieback Roof Anchors Building 1, Fresno VA - RFI Responses: Issued 12/05/2025, this document provides VA responses to 14 Requests for Information (RFIs) regarding solicitation 36C26126R0003 for the installation of tieback roof anchors at the Fresno VA Building 1. Key clarifications include the design-build nature of the project, anchor spacing requirements (8'-0 to 10'-0 centers), and an increase in the design schedule from 120 to 165 days.
DOCX
DOCX, High priority: read this firstpast-performance
HighAI Summary for 36C26126R0003 - Past Performance Questionnaire: Past Performance Questionnaire for solicitation 36C26126R0003 (Project No. 570-26-611) regarding Design-Build Services to Install Tieback Roof Anchors Building 1 for the VA Central California Healthcare System – Fresno. The document provides instructions, a rating scale (Exceptional to Unsatisfactory), and a questionnaire to evaluate offerors on quality, schedule, customer satisfaction, and management. Responses are due by December 3, 2025.
DOCX
DOCX, High priority: read this firstpast-performance
HighAI Summary for Attachment C - Phase 2 Factor 4: Offerors Key Personnel: This document is a template for offerors to provide experience and qualifications for key personnel, specifically the Design-Build Prime Project Manager, Construction Superintendent, Civil Engineer, and Mechanical Engineer. It requires detailed professional history, educational background, certifications, and a list of up to five relevant projects completed within the past five years.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project 570-26-611: Install Tieback Roof Anchors Building 1: Statement of Work for a Design-Build project at the Fresno VA Medical Center to install permanent window-washing davit tieback roof anchors on Building 1. The scope includes full A.E. design services, structural calculations for a 5,000 lbs factored ultimate load, and construction services compliant with OSHA and VA Master Specifications. The document specifies quality assurance requirements, including a third-party review at 65% and a detailed QA/QC plan. Revision date: December 5, 2025.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project 570-26-611: Install Tieback Roof Anchors Building 1 - SOW: Statement of Work dated October 2, 2025, for the Fresno VA Medical Center. The project requires a Design Build (DB) contractor to provide professional A.E. services and construction for the installation of permanent window-washing davit tieback roof anchors on Building 1. Scope includes site investigation, structural engineering calculations, stamped design packages, and full construction services compliant with VA Master Specifications and OSHA standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 00 00 General Requirements - VA Central California Healthcare System: This document outlines the general requirements and technical specifications for the installation of fall protection at various buildings within the VA Central California Healthcare System in Fresno, CA. It details safety requirements, site preparation, security protocols for personnel and documents, vehicle restrictions, and operational guidelines for storage and site management.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination No. CA20250018: General Decision Number CA20250018, dated September 26, 2025, establishes minimum wage rates and fringe benefits for building, heavy, and highway construction projects across multiple California counties. The document includes specific labor rates for various trades (e.g., asbestos workers, boilermakers, bricklayers, carpenters) and outlines compliance with Executive Orders 14026 and 13658 regarding minimum hourly pay.
DOCX
DOCX, Low prioritypresolicitation
LowAI Summary for 36C26126R0003 - Install Tieback Roof Anchors, Building 1 - Fresno: Pre-solicitation notice for a Design-Build project to install tieback roof anchors at the Fresno VA Medical Center. The project is a total SDVOSB set-aside with an estimated magnitude between $250,000 and $500,000. The scope includes complete design services for window-washing davit anchor systems and subsequent construction, with a total estimated contract duration of 240 days.
ZIP
ZIP, Low priority6 pages · presolicitation
LowAI Summary for 36C26126R0003 - Pre-Proposal Site Visit Presentation: Presentation for a pre-proposal site visit dated November 19, 2025, regarding Solicitation No. 36C26126R0003. The project involves design-build services to install tieback roof anchors at the Fresno VA Health Care Center. Key details include a 100% SDVOSB set-aside, a construction magnitude between $250k and $500k, and a Phase I proposal deadline of December 3, 2025.
DOCX
DOCX, Low priorityrfi
LowAI Summary for RFP 36C26126R0003 - RFI Form: A standardized Request for Information (RFI) form for RFP #36C26126R0003, Project No. 570-26-611, regarding the Design-Build installation of Tieback Roof Anchors for Building 1. The document provides a template for contractors to submit technical queries to the VA Contracting Officers.
PDF
PDF, Low priorityother
LowAI Summary for VA Fresno ACM Survey - FSS Order VA261-12J-2620: A campus-wide asbestos survey report for the Fresno VA Medical Center, conducted by Millennium Consulting Associates under FSS Order VA261-12J-2620. The document identifies Asbestos Containing Materials (ACM) across multiple buildings (1-8, 15-19, 22, 24, 31, 32, 34, and OPC) to assist the VA in planning for repairs, renovations, and demolition.
PDF
PDF, Low priorityspecifications
LowAI Summary for Veterans Administration Fresno CA - Seventh Floor As-Built Drawings: As-built drawings for the seventh floor remodel of the Veterans Administration facility located at 266 E. Clinton, Fresno, CA. The document includes a symbols legend, a seventh floor plan, and a partial electrical plan dated October 1975.
Amendment 0004:
A. The purpose of this amendment 0004 is to provide response to the RFIs. Phase I proposal due date has been extended from December 11, 2025 to Tuesday, December 16, 2025 by 2:00 PM PST.
B. Attachments As-build Drawings Tiebacks Merged, Revised DB SOW Fresno VA_B1 Tieback_R1, VA Fresno ACM Survey Asbestos Study, and RFI Responses FRE Anchor Tie Downs 20251205 are attached to this amendment for reference.
C. Phase I Proposal is due on Tuesday, December 16, 2025 by 2:00 PM. PST.
D. All other terms and conditions remain unchanged and in full force and effect.
More opportunities from Department Of Veterans Affairs → 261-NETWORK Contract Office 21 (36C261)
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.