Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on January 30, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--Medical Center Elevator Maintenance Huntington WV, VA Medical Center

Closed
36C24523Q0293Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 8 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 8 hours ago

DEADLINE

in about 2 months

General Info

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Dr., Huntington, WV, 25704, USA

Set-Aside

NONE

Documents

1

36C24523Q0293.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 245-NETWORK Contract Office 5 (36C245)
Contacts1 person available
OfficeLINTHICUM, MD, 21090, USA
Office AddressLINTHICUM, MD, 21090, USA
Contacts
Craig ArmagostContracting Officer

Full Description

Show more
36C24523Q0293 Huntington WV VA Medical Center Elevator Maintenance Sources Sought Notice DISCLAIMER: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. Neither unsolicited proposals nor any other kind of offers will be considered in response to this Sources Sought. Responses to this notice are not offers and will not be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this Sources Sought. All information received in response to this RFI that is marked Proprietary will be handled accordingly. Responses to the Sources Sought will not be returned. At this time, questions concerning the composition and requirements for a future Request for Quote will not be entertained. 2.0 SUBJECT: The Department of Veterans Affairs is conducting market research in order to provide Elevator Maintenance and Repair Services at the Huntington Veterans Affairs Medical Center in Huntington, WV. The Government anticipates awarding a Federal Supply Schedule / Firm Fixed Price single award contract that will provide the support services listed within the below Performance Work Statement. 3.0 OBJECTIVE: See attachment. 4.0 RESPONSE INSTRUCTIONS: 1. Subject Line: RFI Interest (36C24523Q0293) Elevator Maintenance 2. Name and Address of Company 3. Any small business designation as certified by the Small Business Administration 4. Capabilities Statement including a through description of experience in managing support requirements of this nature. 5.0 CONTACT INFORMATION: Any questions related to this Sources Sought shall be directed to Craig Armagost at contact@example.gov . All information regarding Capabilities Statements or any other proprietary information relative to this Sources Sought shall be submitted via email to contact@example.gov no later than 1:00 PM EST on Monday February 13th 2/13/2023. STATEMENT OF WORK HUNTINGTON WV ELEVATOR MAINTENANCE PART A GENERAL INFORMATION INTRODUCTION: The Hershel Woody Williams VAMC located at 1540 Spring Valley Drive, Huntington, WV, 25704 has a requirement to have a Federal Supply Schedule Five year contract to perform inspection and routine maintenance services on all elevators on campus. Additionally, we need to have after hour call outs, non-routine maintenance, replacement, and repair covered. BACKGROUND: Elevator repairs and inspections are costly and time consuming. A contract with an elevator company will help maintain cost, improve uptime, and ensure a robust preventive maintenance program. Due to unforeseen or unpredictable issues and problems, the cost for maintenance, upkeep, and repair continues to increase as does the usage demands and expectations for timeliness repairs and functionality. This contract will also help address those issues to maintain cost and improve uptime. NOTE: the word "elevator" in this solicitation shall include all elevators, Dumbwaiters, lifts, etc., to be serviced under this contract. SCOPE OF WORK: The Contractor shall furnish all material, labor, lubricants, hydraulic fluids, supervision, tools, shipping, travel and equipment necessary to provide full maintenance services, including all adjustments, tests, parts replacement and repairs necessary to keep the elevators in continuous use at their initial performance ability (same speed, capacity, safety and efficiency) as originally specified by the equipment manufacturer as modified thereafter. Provide full non-routine and after hour maintenance services, including all adjustments, parts replacement, and repairs necessary to keep the elevators in continuous use at their initial performance ability (same speed, capacity, safety and efficiency) as originally specified by the equipment manufacturer as modified thereafter Perform the five-year load test in calendar year 2023 as outlined below in testing . Perform annual test, including pressure testing, on elevators outlined below in testing . The contractor shall address all repairs to include the following, but not limited to: Repair or replacement necessary due to negligence or misuse of the equipment by persons other than the contractor to include power dips, flooding, fire, etc. Installation of new attachments, which may be required or recommended by insurance agencies or Government Authorities. Repairs or replacement of cab enclosure, hoist way enclosures, door frames and sills, machine room lighting, control panels/boards, cab tile, carpet, etc. Replacement of underground hydraulic piping or hydraulic cylinder and other misc. non-routine pit and elevator shaft work All adjustments, repairs and modifications, must be in conformance with the manufacturer guidelines and/or the following industry standards, as applicable, whichever is more stringent: ASME Al 7.1 Safety Code for Elevators and Escalators, latest edition ASME Al 7.2 Inspectors' Manual for Elevators and Escalators, latest edition ASME Al 7.3 Safety Code for Existing Elevators and Escalators, latest edition ANSI/NPA 70 National Electric Code, latest edition Manufacturer's requirements and specifications on inspection, maintenance, and operation of each elevator model. PART B REQUIRMENTS B.1 Vendor shall be on site for two (2) eight-hour days per week. The first day shall always be the first day of the week. This will typically be Monday, unless an observed holiday should fall on Monday. The second day will be agreed to by VA staff on Monday of that week. B.2 Vendor shall perform weekly Hydraulic Elevator Fluid Inspection for all hydraulic elevators. Hydraulic fluid levels will be checked and corrected once each week and done so in every hydraulic elevator maintenance room. The log inside each elevator room will be noted with at least the date and initials of the person performing the check. Other such items may be required to written down in the log, as noted. B.3 Vendor will provide emergency callback service 24 hours a day, seven days per week, as requested by the COR or designee for entrapment calls. B.4 Vendor will have the ability to be onsite in one hour or less for any callback or repair situation. PART C - SUPPORTNG NFORMATION C.1 Place of Performance: VA Medical Center, 1540 Spring Valley Dr., Huntington, WV. C.2 Period of Performance: Expected award on about (April 1, 2023) with four optional renewal periods of one (l) year each. C.3 Special Considerations C.3.1 Contractor Furnished Materials All labor, materials, equipment to perform the job. When furnish , provide , install , or similar term is used it shall mean a complete installation, ready for use. The vendor shall supply all parts, equipment, material and labor to conduct all work listed. The work will include all items as described in the Scope of Work listed above. C.3.2 Government Furnished Materials and Services. Government furnished property, if any, will be identified and will only be used for the performance of this contract unless otherwise authorized by the Contracting Officer. The Contractor shall, at all times, take any and all steps necessary for maintenance and preservation of all Government-furnished property. The Contractor shall comply with all reasonable requests of the Contracting Officer to enclose, or specifically protect, Government-furnished property. C.3.3 Qualifications of Key Personnel The vendor shall provide individuals that can perform work on site as a consultant, technician, and work planner of all elevator systems described. These individuals should be highly knowledgeable of the equipment and should have prior experience to provide service for the specified equipment. They should also be able to troubleshoot problems of unknown origin with the described equipment. May also need to evaluate existing equipment and be able to make appropriate determination of items or interfaces needed for these elevators. C.3.4 Supervision/Communications. At all times during the performance, the Contractor s Superintendent (if applicable) shall be available by cellular phone. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent. The Contractor s Competent Person that meets OSHA training guidelines, is capable of making decisions and acting on behalf of the Contractor shall be physically located on site at all times during performance of the contract. If the Contractor s Competent Person is absent from the job site for an extended period of time, the COR may send all Contractor/sub-contractor employees off the job. C.3.5 Security Requirements: Contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel entering the Medical Center. This does not apply to suppliers and delivery personnel making deliveries to the VA warehouse dock only. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be worn above the belt at all times while on Medical Center property. Contractor s employees shall return all I.D. badges to designated personnel at time designated in the task order. C.3.6 The Contracting Officer s Representative (COR) is responsible for the inspection of the work called for in this job. The Contracting Officer s Representative will be identified in the task order by name, telephone number and location. Inspections made by the COR are for the sole benefit of the Government and do not relieve the Contractor of any quality control responsibilities. C.3.7 The Safety Manger is responsible for safety inspections of all contract operations. The Safety Manager will be identified in the task order by name, phone number and location. C.3.8 Drawings General. Contract drawings (if applicable) will indicate the extent and location of work. If any departure from the contract drawings are deemed necessary by the Contractor, the details of such departure and the reasons therefore shall be submitted to the Contracting Officer for approval as soon as practical. No such departure shall be made without proper written permission of the Contracting Officer. The Contractor is responsible for all information and requirements in drawings and specifications that pertain to the task order. C.3.9 Verification of Dimensions The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen. C.3.10 Smoking Policy. The Contractor shall not allow smoking in any building or on medical center property. C.3.11 Parking/Traffic Regulations. The Contractor shall not park on grassy areas unless approved by the COR and the Contractor agrees to restore areas back to VA standards. Drivers should be particularly concerned with pedestrian traffic. Yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be observed by operators at all times. Seat belt use is mandatory on the VA grounds. CONSTRUCTION AND EXTENDED GUARANTEE PERIOD MAINTENANCE & REPAIR SERVICE The elevators involved are listed below: Item Location (Building) Car No. Type Capacity Make Drive 1 1 East E-4 Pass/Auto 4000 Canton Traction 2 1 E-5 Pass/Auto 4000 Canton Traction 3 2 F-8 Dumbwaiter 2500 Virginia Control Traction 4 4 E-1 Pass/Auto 4000 Murphy Traction 5 12 P-7 Pass/Auto 3500 Murphy Traction 6 1South P-1 Pass/Auto 4000 Montgomery Traction 7 1South P-2 Pass/Auto 4000 Montgomery Traction 8 1South P-3 Pass/Auto 4000 Montgomery Traction 9 1South S-1 Freight 5000 Montgomery Traction 10 1South S-2 Freight 5000 Montgomery Traction 11 1South CL-1 Cart lift 1000 Montgomery Hydraulic 12 1South CL-2 Cart lift 1000 Montgomery Hydraulic 13 1South DW1 Dumbwaiter 25 Matot Wind Drum 14 1West E2 Pass/Auto 4000 Montgomery Hydraulic 15 1West E3 Pass/Auto 4000 Montgomery Hydraulic 16 2 P-9 Freight 5000 Montgomery Hydraulic 17 5 Bldg. 5 Pass/Auto 2500 Murphy Hydraulic 18 6 Bldg. 6 Pass/Auto 2500 Murphy Hydraulic 19 23R S-3 Pass/Auto 5000 Dover Hydraulic 20 25 P-10 Pass/Auto 3000 Montgomery Hydraulic 21 25 P-11 Pass/Auto 3000 Montgomery Hydraulic 22 BRAC Bldg. 20 Pass/Auto 3500 DC Traction 23 RRTP Bldg. 9 Pass/Auto 2500 Murphy Hydraulic 24 Fisher House Bldg. 21 Pass/Auto 3000 Otis Hydraulic 1. The Contractor shall obtain all necessary licenses and/or permits required to perform the work. Contractor shall have in his possession throughout the term of the contract all diagnostic equipment necessary to fully maintain, test, repair, adjust or reprogram the systems. The Contractor shall post a check chart for each elevator in each machine room in a conspicuous place. This check chart shall list each elevator component-showing schedule of manufacturer's recommended frequency of inspection of each component on a weekly, semi-annually, annually or other frequency. Entries shall be to indicate the status of schedule items of maintenance work performed. The check chart shall be kept up to date at all times and must be initialed and dated by the Contractor's employee to indicate that the work has been accomplished. Check chart shall be available for review at the Contracting Officer Representative (COR)'s request and the Contractor shall physically show the COR the completed work on request. Safety tests and other tests and inspections shall be performed by the Contractor. Contractor shall perform all safety tests and other tests and inspections as recommended and required by ASME Al 7.1 LATEST EDITION AND ANSI/ASME Al 7.2 LATEST EDITION. Contractor shall be required to attach tags after testing as specified by Code, such as at the governor-releasing carrier, and oil buffer, etc. Any repairs or adjustments necessary to complete a test and return the elevator to service shall be performed by the Contractor at no additional expense to the Medical Center. After completion of the required tests and inspections, submit detailed documentation on these to the COR within 21 calendar days. All elevators provided with firefighters' service shall be subjected monthly to Phase I recall and a minimum of one floor operation on Phase Il to assure the system is maintained in proper operating order in accordance with Al 7.1 Code. A written record of findings on the operation shall be made by the Contractor and kept on the premises of said operation. (See Attachment C for firefighters' test log). Testing shall be done on weekend, holidays or the hours before 6:30 AM or after 6:30 PM, at no additional cost to the Medical Center. All tests or inspections that will remove the elevator from normal operation shall be scheduled in advance with the COR. An adequate supply of spare parts shall be maintained at all times to ensure prompt preventive maintenance and repair services. Contractor shall have all maintenance tickets signed by the COR. The following performance levels shall be maintained at all times: l . Contract speed and brake to brake flight time shall be maintained as originally installed and adjusted. Leveling accuracy shall be maintained at all times. Opening and closing times, door close torques of all cars shall at all times be maintained within the limits of ASME Al 7.1 Code with a minimum of stand open time consistent with traffic demands at each floor. Door reversal on all elevators equipped with mechanical safety shoes shall always be initiated with the stroke of the shoe. Ensure all electric eyes or door detectors are working at all times. Variable car and hall door open times shall be maintained in accordance with original field adjustments. Deviations from this shall not be permitted unless requested and/or approved by this COR. Upon satisfactory completion of this or subsequent readjustments, a computerized elevator analyzer or similar type event recorder shall be utilized to accurately record the hall waiting time at each landing and other data necessary to establish that the system is operating at peak efficiency. Results shall be submitted and be labeled as to floor, time, date and identification of all other data and shall be delivered together with an analysis of the tapes/disks to the COR. The Contractor shall furnish all labor and supplies, parts and materials necessary to regularly and systematically clean, examine, adjust, lubricate as required and if conditions warrant, repair or replace, as follows: l . Machine, worm, gear, thrust bearings, drive sheave, drive sheave shaft bearings, brake pulley, brake coil, brake contact, brake linings and component parts. Machine motor, motor generator, motor windings, rotating element, commutator, brushes, brush holders and bearings. Controller, selector and dispatching equipment, all relays, solid state components, resistors, condensers, transformers, contacts, leads, dashpots, time devices, computer devices, CRT devices, selector tape or wire and mechanical and electrical driving equipment. Governor, governor ropes, governor sheave and shaft assembly, bearings, contacts, and governor jaws. Deflector or secondary sheave, bearings, car and counterweight buffers, car and counterweight guide rails, top and bottom limit switches, governor tension sheave assembly, compensating sheave assembly, counterweight guide shoes including rollers or gibs. Hoist way door interlocks, hoist way door hangers, bottom door guides and auxiliary door closing devices. Automatic power operated door operator, car door hanger, car door contact, door protective devices, load weighing equipment, car frame, car safety mechanism, platform, wood platform flooring, car guide shoes including gibs and rollers. Car operating panel(s) and equipment, hall lanterns, hall buttons and signal devices. Cab Lighting Where applicable to hydraulic elevators include cylinder head, plunger exposed surfaces, plunger gland and packing, pumps, exposed piping, fittings and flexible pipe connections, operating controls, check and relief valves, valves, gages and tanks. 11. All parts and materials shall be of the original manufacturer's design and specification, or equal thereto. All lubricants shall be as recommended by the manufacturer. The Contractor shall also: l . Examine periodically all safety devices and governors and conduct an annual no load safety test and each fifth year perform a full load, full speed test of safety mechanism, overhead speed governors, car and counterweight buffers. If required, the governor shall be calibrated and sealed for proper tripping speed. Maintain an adequate factor of safety, to equalize the tension on all hoisting ropes, repair and replace conductor cables and hoist way and machine room wiring. Keep car emergency light units in an operable condition at all times, test special emergency (fireman's service) service and emergency power circuits, where provided in accordance with Code requirements. Furnish lubricants specified to the various lubrication needs. Perform a weekly inspection of hydraulic fluid levels in the elevators in buildings 5, 6, and 25. Inspection documentation shall be maintained in the respective elevator mechanical rooms, showing the date of each inspection. Maintain a supply of contacts, coils, leads, brushes, lubricants, wiping cloths and other minor parts in each machine room for the performance of routine preventative maintenance. Maintain a complete set of current, legible schematic wiring diagrams in each elevator machine room for each elevator contained therein. To the extent that any of the required schematic wiring diagrams are not available at the time of contract award, it will be the responsibility of the Contractor to provide same at no cost to the Medical Center. Maintain a full, legible service log in each machine room and a complete, orderly chronological file including drawings, complete part lists, and copies of all service reports. The log shall list the date and time of all maintenance service performed. Service file shall be made available for inspection upon request, and a copy of the complete file furnished to VAMC during the first week of the last month of the normal contract term. Maintain a separate maintenance record on each elevator and dumbwaiter. The maintenance record shall be kept in the elevator equipment room and shall be readily available for inspection by the COR or designee. The maintenance record is the property of the government and shall be turned over to the Government at the end of the contract. The maintenance record shall be a chronological file that includes the following information: Date. Nature of work (i.e. Preventative Maintenance Inspection (PMI). Description of work performed (contractor should be brief and concise). Any indication of problems experienced. Initial or signature of mechanics performing work. 10. Instruct his personnel that when they perform work under this contract, they shall comply with the following procedures: Upon arrival at the station, the Contractor shall check in with the M&O General Foreman or his designee so that the VAMC will be aware of the Contractor's presence at the facility at all times. Upon each departure, Contractor will serve notice of disposition of work to the M&O General Foreman or designee. In addition the contractor shall furnish the M&O General Foreman or his designee a copy of a work order, service sheet or other such written notification of services performed. Such reports shall include the following information: Name and address of contractor Name of contractor employee(s) performing the work Date(s) work performed and hours spent Brief description of work performed, including PMI's and identification of equipment worked on Signature of contractor's employee(s) and signature of M&O General Foreman or designee If the report is not submitted it will indicate that no inspection or maintenance was performed and payment may be withheld and/or delayed. 11. Periodically clean hoist way including all equipment located in or moving through the hoist way, car top, car sling, safeties, appliances, pits, sills, door tracks and hangers. Clean and paint as needed machine room floors. No device shall be acceptable that will not give full satisfaction without excessive maintenance and attention. If it becomes evident during guarantee period that device is not functioning properly or in accordance with manufacturer's or specification requirements, or if in the opinion of Contracting Officer, excessive maintenance and attention must be employed to keep device operational, device shall be removed and new device meeting all requirements shall be installed as part of work until satisfactory operation of installation is obtained. Period of guarantee shall start a new for such parts from date of completion of each new installation performed, in accordance with foregoing requirements. Any components which may have suffered substantial life cycle reduction or damage due to redundant failure shall also be provided with extended guarantees. Work excluded: The following work is specifically excluded from this contract: For the purpose of clarification, any item not specifically excluded shall be considered the Contractor's responsibility. All travel costs associated with the performance of this contract are the responsibility of the contractor and are provided at no additional cost to the Government as part of this contract. Travel costs are defined as but are not limited to time and vehicle costs for personnel in travel to and from job site for all duties outlined in this specification, normal shipping charges on any parts or materials covered by this contract, costs associated with the normal shipping of parts or equipment out for repair that are covered under this contract, etc. Contractor shall perform all work during regular working hours of regular working days 8:00 a.m. to 4:30 p.m. excluding Federal holidays, unless specifically instructed otherwise by the COR. l. Medical Center shall not be responsible for incidental charges including, but not limited to, parking, tolls, mileage, phone, etc., on straight time or overtime work. Contractor shall notify the COR or designee by telephone or in person after completion of each regular time service. Under no circumstances will any shutdown or breakdown last longer than five (5) working days (40 working hours), from initial notification to the Contractor, without prior approval of the COR. All tests, inspections, or maintenance repairs that will remove an elevator from service shall be scheduled in advance with the COR. The Contractor shall comply with the following procedures when an elevator is removed from service for any reason: l. Notify Facilities and Plant Management Service, M&O General Foreman or Designee, either by phone (304429-6741 x2374, 2384, or 2378), or in person, before removing elevator from service. If work requires more than one day, daily notification will be made. Notify Facilities and Plant Management Service when placing the elevator back in service. Contractor's employees shall turn in Elevator Report Forms, which will furnish the information to the M&O General Foreman, Facilities and Plant Management Service. The Contractor shall immediately notify the COR in writing of the existence or the development of any defects in, or repairs required to, the elevator, which the Contractor considers are not covered by the contract and shall furnish a written estimate, when requested, of the cost. Final determination of responsibility will be by mutual agreement between the COR and the Contractor. When planned work requires an elevator to be taken out of service, the Contractor is requested, when possible, to use the Federal holidays listed below. New Year s Day Martin Luther King Day President s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving-Day Christmas Day Inspection Periodic inspections of the elevators required by the National American Standard Safety Code for Elevators and Escalators (Latest Edition) will be performed under separate contract in accordance with existing Huntington VAMC Policy. Upon completion of a routine inspection, the Contractor will be furnished with an inspection report listing deficiencies for which he is responsible to repair within 30 days. Items marked emergency should be corrected immediately. Under no circumstances shall the Contractor allow reported deficiencies to go uncorrected beyond the contract period. The Contractor shall provide all labor and material to perform work in accordance with ASME Al 7.1, ASME Al 7.2, ASME Al 7.3, and ANSI/NPA 70 standards for annual, 6 months, and five year "full load" (traction only) tests. The Contractor shall perform tests at the date and time specified by the VAMC. Inspection of work shall be conducted by an independent inspector contracted by the VAMC. Maintenance contractor performs actual tests. Testing l . The following services will be performed at intervals specified in the American National Standard Safety Code for Elevators and Dumbwaiters. The maintenance Contractor will furnish personnel to perform the I (one) year, and the 5 (five) year safety load test, (including weights), at no additional cost to the Medical Center. Scheduling of all tests will be handled through the COR. A Medical Center's Contractor, authorized by the Huntington VAMC, will witness all tests for the Medical Center, Huntington VAMC personnel, as required, shall be available for the tests. The Contractor shall make available the uninterrupted services of at least one employee to accompany the inspector during the course of any inspection. The yearly car safeties, governor and oil buffer tests and inspections shall be complied with as per Al 7.1 and this specification, in the presence of the COR and his/her representative. The five-(5) year safety and buffer tests as required by the American National Standard Safety Code for traction Elevators and Dumbwaiters, (A 17.1 and Al 7.2) are to be performed by the Contractor. Within six (6) months prior to the termination of this contract, a representative of the COTR shall make a thorough inspection of all equipment covered under this contract. The Contractor shall correct all Defects found within thirty (30) calendar days. The Contractor shall notify t e COR in writing that the deficiencies have been corrected and that re-inspection can be made. The inspectors used by the Medical Center on this contract may or may not work for the Medical Center. An outside company may be used to perform inspections as a representative of the Medical Center if so desired by the COR. The following schedule for the five-year load test is required in the year 2023 Item Location Car No. Type Capacity Make Drive 1 Bldg. 1 E-4 East - Pass/Auto 4000 Canton Traction 2 Bldg. 1 E-5 East - Pass/Auto 4000 Canton Traction 3 Bldg. 2 F-8 Dumbwaiter 2500 Virginia Control Traction 4 Bldg. 4 E-1 Pass/Auto 4000 Mu h Traction 5 Bldg. 12 P-7 Pass/Auto 3500 Mu h Traction 6 Bldg. 1S P-1 Pass/Auto 4000 Montgomery Traction 7 Bldg. 1S P-2 Pass/Auto 4000 Montgomery Traction 8 Bldg. 1S P-3 Pass/Auto 4000 Montgomery Traction 9 Bldg. 1S S-1 Freight 5000 Montgomery Traction 10 Bldg. 1S S-2 Freight 5000 Montgomery Traction NOTE: THE WORD "ELEVATOR" IN THIS SOLICITATION SHALL INCLUDE ALL ELEVATORS, DUMBWAITERS, LIFTS, ETC., TO BE SERVICED UNDER THIS CONTRACT. The following schedule for the annual test (with pressure testing) year load test is required: Item Location Car No. Type Capacity Make Drive l. Bldg. 2 P-9 Freight 5000 Montgomery Hydraulic 2. Bldg. 23R S-3 Freight 5000 Dover Hydraulic 3. Bldg. 23 P-10 Pass/Auto 3000 Montgomery Hydraulic 4. Bldg.25 P-11 Pass/Auto 3000 Montgomery Hydraulic 5. Bldg. 1W E-2 Pass/Auto 4000 Montgomery Hydraulic 6. Bldg. 1W E-3 Pass/Auto 4000 Montgomery Hydraulic 7. Bldg. 1S CLI Cart lift 1000 Montgomery Hydraulic 8. Bldg. 1S CL2 Cart lift 1000 Montgomery Hydraulic 9. Bldg. 1S DWI Dumbwaiter 25 Matot Wind Drum 10. Bldg. 5 Pass/Auto Murphy Hydraulic 11. Bldg. 6 Pass/Auto Murphy Hydraulic 12. RRTP Bldg. 9 Pass/Auto 2500 Murphy Hydraulic 13. Fisher House Bldg. 21 Pass/Auto 3000 Murphy Hydraulic Scheduled Maintenance Requirements l . The Contractor shall be responsible for establishing an effective system for accomplishing scheduled and unscheduled maintenance, including a backlog listing of work to be accomplished. The scheduling system and backlog listing shall be available for inspection by the COR at any time. 2. Regular routine maintenance examination shall be performed at a frequency of not less than weekly for all equipment. 3. Preventative Maintenance Inspections (PMI) are to be performed during administrative hours on the same day of each week. The contractor shall submit, at the beginning of the contract, to the Electrical Shop Foreman, the day of the week he/she intends on performing the required PMI. If the day falls on a holiday the contractor shall perform the required PMI's on the next business day following the holiday. The contractor shall notify the Electrical Shop Foreman if he/she intends on changing the PMI day or if he/she cannot perform the PMI ON schedule. 4. PMI's should ensure a safe and efficient level of operation, and all work relative to cleaning, lubricating, adjustment or part replacement of equipment that is necessary for the desired level of operation shall be performed by the Contractor. Each contract year, all items which rely on cleaning, lubrication, or routine part replacement shall receive such service at least once as indicated by service report. Any PMI required by the Equipment Manufacturer, and/or applicable laws, regu...

More opportunities from Department Of Veterans Affairs → 245-NETWORK Contract Office 5 (36C245)

Same awarding agency

NAICS: 513210
New
Federal
7A21--CVI 42 Evolve Tier 1 License Subscription
Solicitation # 36C24527Q0045
The Department of Veterans Affairs, through the VA Maryland Health Care System, is soliciting a contract for CVI Evolve Tier 1 software licenses and support for the Cardiology department at the Washington DC VA Medical Center. The contractor is responsible for providing all necessary software licenses, parts, materials, labor, and training required to implement, maintain, and upgrade the system. The scope specifically includes two seats of the CVI 42 Evolve Tier 1 Subscription, covering advanced reporting and specialized modules such as 4D Flow, Aortic Valve, Cardiac MR, Circle Plaque, Core CT, Mitral Valve, Quantitative Perfusion, and Strain. The contract is structured with a base year running from January 1, 2027, to December 31, 2027, and four subsequent one-year option periods, extending the total potential duration to five years through December 31, 2031. Award will be granted to the responsible offeror whose proposal is most advantageous to the government, considering price and technical factors. Key requirements for offerors include providing a manufacturer's letter of authorization, detailed OEM implementation and training plans, and justification of compatibility with existing cardiovascular equipment. Administrative requirements specify that payments will be made in arrears upon receipt of a properly prepared invoice containing the contract and purchase order numbers, as well as the equipment serial numbers and model names. The contractor must comply with Buy American certifications, OSHA safety regulations, and Controlled Unclassified Information (CUI) protocols. Performance will take place at the Washington DC VA Medical Center, with the government retaining the right to inspect and test all services and supplies prior to acceptance.
Software Publishers

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 561210
New
Federal
J044--NOTICE OF INTENT TO SOLE SOURCE Baltimore VAMC Steam System Preventive Maintenance from Vicinity Energy Baltimore Corporation
Solicitation # 36C24527Q0048
The Department of Veterans Affairs is issuing a Notice of Intent to Sole Source for an open market award to Vicinity Energy Baltimore Corporation to provide annual steam system preventive maintenance at the Baltimore VA Medical Center. This requirement, classified under NAICS code 561210 and PSC J044, is driven by the fact that the facility's steam equipment is directly connected to the district steam distribution system owned and operated by Vicinity Energy. Due to this interconnected configuration and the proprietary operational data involved, the government identifies Vicinity Energy as the sole source capable of ensuring the reliable operation of the system without risking the broader distribution network. The scope of work requires a two-person crew to provide eight hours of service every two weeks, totaling 416 labor hours per year. Key responsibilities include steam trap surveys, cleaning pressure-reducing valves, inspecting heat exchangers, and ensuring proper water chemistry and meter operation. The contractor must supply all necessary parts meeting original manufacturer specifications and provide emergency call-back services with a technician on-site within five hours of notification. The anticipated period of performance is one year from the award date, with the possibility of option-year extensions. Interested vendors may submit capability statements to Contract Specialist Patricia Thai by 11:00 AM EST on November 10, 2026, referencing announcement number 36C24527Q0048. These submissions will be used solely to determine if the procurement will be conducted on a competitive basis. All work will be performed at the Baltimore VAMC, adhering to strict VA security, safety, and infection control requirements.
Facilities Support Services

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 423440
New
Federal
J072--JR/BP POTS AND PANS ROOM | WASHINGTON DC VAMC
Solicitation # 36C24527Q0043
The Department of Veterans Affairs is seeking a contractor for the emergency procurement, delivery, and factory assembly of commercial-grade kitchen equipment for the Nutrition and Food Services Pot and Pan Washing Room at the Washington DC VA Medical Center. This firm-fixed-price acquisition is driven by critical infection control and physical environment deficiencies identified during a June 2026 Joint Commission survey. The required equipment includes a custom Aerowerks two-compartment sink system with a drainboard, a Salvajor food waste disposer, and a Hobart TurboWash II pot scrubber. All equipment must be NSF listed, commercial grade, and compliant with Joint Commission, CMS Conditions of Participation, and FDA Food Code standards. The contractor is responsible for freight, uncrating, and delivery to the facility within 60 calendar days of award. A qualified Aerowerks technician must perform the on-site assembly within 14 days of delivery to preserve the manufacturer warranty. Strict safety and cleanliness protocols are in effect, including the requirement for hot work permits for welding and the immediate removal of all packaging and metal debris to prevent food service contamination. Payment will be issued via a single electronic invoice on a Net 30 basis following the COR's written acceptance of the installed and inspected equipment.
Other Commercial Equipment Merchant Wholesalers

POSTED

4 days ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
Federal
J061--INTENT TO SOLE SOURCE AWARD TO EATON CORP - BASE YEAR MAINTENANCE AND SERVICE CONTRACT FOR 8 UPS HERSHEL WOODY WILLIAMS VAMC
Solicitation # 36C24527Q0046
The Department of Veterans Affairs intends to award an open market sole source contract to Eaton Corporation (UEI: NP3NSFVMNUM3) for a one-year service and preventative maintenance agreement. The contract covers eight specific Eaton UPS systems located at the Hershel Woody Williams VA Medical Center in Huntington, West Virginia. The scope of work includes a Flex Plan consisting of two UPS and two battery preventive maintenance checks for all eight systems. This procurement is classified under NAICS code 238210 for Electrical Contractors and Other Wiring Installation Contractors and PSC J061 for the maintenance and repair of electric wire and power distribution equipment. The government is pursuing a sole source award because Eaton Corporation is the original equipment manufacturer and the only authorized provider of the proprietary service software, repair documentation, and materials required for 3-phase Eaton UPS products. As an ISO9001 certified supplier, Eaton does not certify or support third-party providers for these specific products. This notice is published in accordance with FAR 5.101(a) and FAR 12.102. Interested vendors may submit capability statements to Contracting Officer William Pratt by November 12, 2026, at 10:00 AM ET, referencing announcement number 36C24527Q0046 to determine if the requirement will be competed.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

4 days ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS