Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on November 3, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--VISN 21 MACC, Correct ATS System at Martinez

Closed
36C26123R0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
36C25627R0012_PRESOLICITATION_NOTICE_REPLACE PERIMETER SECURITY FENCE
Solicitation # 36C25627R0012
The Department of Veterans Affairs, Network Contracting Office 16, is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) for a firm-fixed-price construction project to replace the perimeter security fence at the Veterans Health Care System of the Ozarks (VHSO) Main Campus in Fayetteville, Arkansas. The scope of work involves a turn-key operation to replace the existing perimeter fence, replace one gate, and automate gates one through eight. The project includes general construction, architectural, mechanical, electrical, and structural repairs. The estimated magnitude of construction is between 5 million and 10 million dollars, with a performance period of 365 calendar days from the Notice to Proceed. This opportunity is a 100 percent SDVOSB set-aside under the Veterans First Public Law 109-461, requiring that at least 15 percent of personnel costs be spent on employees of the prime or other eligible SDVOSB concerns. Eligible offerors must be registered in the System for Award Management (SAM) and SBA VetCert under NAICS code 236220. The solicitation will be issued as a Request for Proposals (RFP) with documents expected to be available around November 5, 2026. Requirements for submission include a bid bond, a 90-day proposal acceptance period, and the subsequent provision of performance and payment bonds upon award. Technical requirements include a certified penetrating radar survey for underground utilities and adherence to OSHA, NEC, and NFPA 70E safety standards.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Federal
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Solicitation # W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
The U.S. Army Corps of Engineers, supporting the U.S. Air Force, is conducting market research via a Request for Information to identify qualified industry partners for seven construction and renovation projects at Wright-Patterson Air Force Base, Ohio. These projects range in scope from the renovation of sensitive Special Access Program spaces and the construction of a 90,000 square foot research laboratory to the modernization of compressor facility systems, the decentralization of heating plants, and the repair of military dormitories. The estimated acquisition magnitudes for these individual efforts vary significantly, with the largest project valued at approximately 160 million dollars. The government intends to utilize Other Transaction Agreements and a Progressive Design-Build delivery method, which splits the work into a collaborative design and pre-construction phase followed by a construction phase based on a Guaranteed Maximum Price. Interested firms must provide detailed company profiles, evidence of cybersecurity compliance through CMMC and SPRS, and experience with complex MEP infrastructure and secure facility standards. Responses are due by November 2, 2026, and should be submitted to the primary point of contact in PDF format.
W072 Endist Louisville

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 9 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 9 hours ago

DEADLINE

in 19 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CA

Set-Aside

NONE

Documents

7

36C26123R0003+-+Solicitation.docx

DOCX

Exhibit+A+-+B19+Panel+Layout.pdf

PDF

Exhibit+B+-+Martinez+Electrical+Drawings.pdf

PDF

Martinez+-+Campus+Map+Contractor+General+Parking+flag+pole.pdf

PDF

Pricing+Breakdown+TORFP+-+Correct+ATS+System+at+Martinez.docx

DOCX

REQUEST+FOR+INFORMATION+%28RFI%29+FORM.docx

DOCX

Specifications+-+Compiled+10252022.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 261-NETWORK Contract Office 21 (36C261)
Contacts1 person available
OfficeMATHER, CA, 95655, USA
Office AddressMATHER, CA, 95655, USA
Contacts
Carla M GrovesContract Specialist

Full Description

Show more
Correct ATS System At Martinez Project # 612A4-23-001 GENERAL INTENTION: Contractor shall furnish all labor and materials needed to perform all demolition, replacement, installation, and commissioning required by this scope located at the Martinez VA medical Center as required by specifications. After the contract is awarded site visits need to be coordinated through the Contracting Officer or Contracting Officer Representative for the project. The period of performance includes material lead times. The period of performance is 300 calendar days from notice to proceed. The contractor will dispose of all equipment components demolished or replaced as part of this project. The contractor will remove of all abandoned conduit conductors and hangers associated with work in this contract. All penetrations in energized pull boxes or cans shall be filled by the contractor in relation to the work performed in this scope. The contractor will be obligated to re-route all utilities as necessary to complete the installation. Contractor shall verify rotation prior to any work performed and confirmation once work is complete. The contractor will verify voltage of the cabling after energization to ensure the system is working correctly along with insulation testing of all newly installed conductors and grounding. The ATS Basis of design is based on the safety features and functions of the 4 pole ASCO 7000 series automatic transfer switch break before make system. All ATSs shall have separate handles to be utilized for manual bypass and isolation bypass function and those handles must be accessible from the exterior of the ATS enclosure. Each ATS shall have a metering system display to include rotation, amps per phase, volts per phase, Frequency and capable to monitor normal and emergency amperage and volts. The ATS must have voltage sensing on the busses to all sources for transferring of the switch only to energized busses. The manufacturer shall provide all training and commissioning of the ATS with its own technicians or manufactured certified technicians, this will be performed after hours and weekends. The contractor will provide short circuit analysis and arc flash coordination studies after work is complete along with installation of arc flash stickers per specification. All permanent splices shall be mechanical compressed connectors with cold shrink wrap installation over the top. All conduit, wire size and pull cans shall be sized per NEC unless otherwise noted. The contractor is expected to have available large staff of electricians available to support an aggressive installation schedule which will require multiple work groups working in different buildings that are able to and certified to complete splicing, wire pulls, and termination as appropriate during off hour shifts over weekends. All electrical panels to be provided shall be 600-amp 277V/480V MLO with a neutral bus. The Panel shall be a minimum of 42KAIC rated and each panel shall have an individual power meter installed as part of the panel which reads out, voltage per phase, amps, hertz, KVA, etc. Basis of design for VFDs are Toshiba Q9 models. The compact size and versatility of these VFD make them a preferred product. Contractor can provide equal type drives but they must be within size for the installation of the existing space. VFDs to be located near the equipment they are servicing. The phasing for this scope of work is difficult and temporary electrical connection will be completed by inhouse electrical staff once systems are established in the project to help with how the project is executed. For bidding purposes, the contractor shall assume night outages over weekends will occur for a minimum staff of (1) Journey man electrician, and (1) Apprentice Electrician per outage team. The VA will do our best to stay within or below this amount but do to the emergency system is being impacted these outages will be more difficult and scheduled at minimal impact times to the facility. SCOPE: Bldg. 19 Work: Contractor shall replace ATS 19-1A-ATS-EM-03 currently a 800 Amp 480V/277V ATS with a new 800 Amp ATS in its same location. The contractor will have 48 hours to complete the removal, replacement, and commissioning of the new ATS in that time frame. This work will only occur on one weekend. Please see specification and scope on ATS equipment requirements. Contractor shall provide and install a new 600 Amp 480/277V 3 phase electrical panel. This panel can be wall mounted or floor mounted as long as it has the 2 inch required housekeeping pad. The 600 Amp MLO panel shall include the following breakers: 3 Phase 400A breaker, (3) 3 phase 125A breaker, (2) 3 phase 225A breakers. The contractor will provide a new breaker in Normal power panel 19-1A-NHS-26 (HBDP) and new 600 rated cables including neutral and ground to the new ATS from this breaker. The contractor shall install a new 600 amp rated breaker in Panel 19-1A-EHS-25 (EMDP) and provide 600 amp rated cables including neutral and ground from that panel to the new ATS. The contractor shall create a minimum 2 housekeeping pad for the new ATS to sit on, please see specification and scope areas for ATS equipment requirements. The contractor shall connect the new 600A electrical panel downstream of the new ATS with 600 amp rated cables including neutral and ground wires. The contractor shall then connect the existing loads of the 2 manual ATSs; 19-1A-MTS-EQ-01 and 19-1A-MTS-CR-01 to the 400A breaker and the 125A breaker provided with the new 600A electrical panel. Contractor is responsible for manipulating the existing conductors and conduit as necessary for routing including pull boxes if necessary. The contractor shall demolish the existing 2 manual ATS switches and unnecessary wiring as needed from the facility including removal of conductors and cabling connections. This work shall occur over one weekend of duration. The contractor shall demolish out EMCC (19-1A-EHM-50) located in Bldg. 19 Electrical room. The contactor shall provide a new 600 Amp 277/480V 3 phase distribution board. This panel shall include the meter requirements as indicated in item M. The contractor shall cut back all existing conduits above the existing MCC and install a pull box sized at 12 x36 X12 . This pull box will provide the space needed to re-work the electrical feeds and splice as needed for all loads in the MCC. The contractor will re-feed the MCC from above with new 4 conduit and 350 MCM Conductors. See list below of motor starters, VFD and breakers to install for each load. B19 1st Floor Rm D118 EMCC (19-1A-EHM-50) Existing New Change Existing Loads AHU-1S Breaker Breaker & VFD 40 Amp AHU-2 Breaker Breaker & VFD 15 Amp P-9 Breaker SZ 1 Starter Breaker & VFD 30 Amp P-8 Breaker SZ 1 Starter VFD Breaker & VFD 50 Amp P-2 Breaker SZ 1 Starter VFD Breaker & VFD 15 Amp P-4 Breaker & SZ 1 Starter Breaker & VFD 7 Amp AHU-7 Breaker Breaker & VFD 70 Amp Spare B19 Rooftop Pump Room Existing New Change Existing Loads P-3 VFD VFD NA P-5 NA VFD NA Bldg. 20 Work: Contractor shall replace ATS 20-1C-ATS-EQ-01 currently 800 Amp 480V/277V ATS with a new 800 Amp ATS in its same location. The new equipment shall be installed with a new 2 housekeeping pad or equivalent. The contractor will have 48 hours to complete the removal, replacement, and commissioning of the new ATS in that time frame. This work will only occur on one weekend. Please see specification and scope on ATS equipment requirements. Contractor shall replace ATS 20-1C-ATS-EM-01 currently 225 Amp 480V/277V ATS with a new 400 Amp ATS in its same location. The new equipment shall be installed with a new 2 housekeeping pad or equivalent. The contractor will have 48 hours to complete the removal, replacement, and commissioning of the new ATS in that time frame. This work will only occur on one weekend. Please see specification and scope on ATS equipment requirements. The contractor will relocate or remove pull boxes to support the installation. Bldg. 12 Work (Exterior): Contractor shall replace ATS 12-1Z-ATS-EM-01 currently 600 Amp 480V/277V ATS with a new 600 Amp ATS in its same location. The current is ATS located with an outdoor enclosure, the new ATS shall located within this same enclosure. The contractor will have 48 hours to complete the removal, replacement, and commissioning of the new ATS in that time frame. This work will only occur on one weekend. Please see specification and scope on ATS equipment requirements. ATS Power monitoring and Control System: The contractor shall provide a system that will control the ATS remotely through the power monitoring system and also configure within the new and existing ATSs on the site. The communication will need to be tied through the VA OI&T system communication infrastructure. The contractor will need to provide a server so the system can be self-hosted at the VA facility. This power monitoring system shall the ability to be utilized for power monitoring meters within the new and current ATSs which includes status and position of each ATS and operation of each generator component. The system shall provide power trending logs and shall be utilized to provide automated reports to satisfy Joint Commission requirement for monthly generator testing events. This system will include alert communication by email and text message to staff for when events occur on the emergency electrical system. The contractor will need to install power meters for the generators to be able to track the systems operation. The contractor will be responsible for communication cabling required. The contractor shall provide one remote workstation in Building 19 electrical room which will include a 40 touchscreen display for remote monitoring and access. RECORDS MANAGEMENT OBLIGATIONS Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists. Definitions Federal record as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. The term Federal record: includes VHA records. does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their VHA contract. may include deliverables and documentation associated with deliverables. Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training. All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] Flow down of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor. ------- End of Statement of Work -------

More opportunities from Department Of Veterans Affairs → 261-NETWORK Contract Office 21 (36C261)

Same awarding agency

NAICS: 238210
New
Federal
H112--Secutron Fire Alarm testing and Maintenance at the VA Northern California Health Care System (VANCHCS)
Solicitation # 36C26127Q0075
The Department of Veterans Affairs, Network Contracting Office 21, intends to award a sole source firm fixed price contract for comprehensive fire alarm testing, maintenance, and repair services for the VA Northern California Health Care System. The contract covers proprietary Secutron Fire Alarm Systems across five facilities: Mather, Martinez, McClellan, Fairfield, and Mare Island. The intended award is for a base year plus four option years, with a specific repair line item valued at 100,000 dollars per annual period. All work must comply with NFPA 72 (2025 edition), The Joint Commission standards, OSHA regulations, and manufacturer operation manuals. Key deliverables include quarterly testing of water-flow and tamper switches, annual testing of smoke, duct, and heat detectors, and quarterly software maintenance with annual upgrades. The contractor must provide emergency call back services within four hours of notification and submit service reports to the Contracting Officers Representative within three days of completion. To be technically acceptable, the contractor must employ at least two fully trained field service technicians residing within a 100-mile radius of the Sacramento Medical Center in Mather, California. This requirement falls under NAICS code 238210 and Product Service Code H112.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Federal
Z1DZ--Project No. 640A0-27-104, Replace Roof at Building 347 - Menlo Park
Solicitation # 36C26127Q0082
Solicitation 36C26127Q0082 is a firm-fixed-price construction requirement for the Department of Veterans Affairs to replace the roof at Building 347 of the Palo Alto VA Medical Center in Menlo Park, California. This procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220. The successful contractor must provide all labor, materials, transportation, and engineering services necessary to complete the project within 180 calendar days from the Notice to Proceed. The government will award one contract based on a comparative analysis of price and non-price factors, including a review of relevant construction experience from the past five years, to determine the best overall value. Key requirements include the submission of a bid bond with the proposal, followed by performance and payment bonds within ten days of the award notice. Offerors must be current in the System for Award Management (SAM) and CVE verified. The project adheres to the Davis-Bacon Act with Wage Determination CA20260018 and includes Buy American requirements for construction materials. All requests for information must be submitted to Daniel Jhun by November 3, 2026, and final quotes are due by 2:00 P.M. PDT on November 19, 2026. A site visit is scheduled for October 27, 2026, and is highly encouraged to ensure offerors are aware of all local conditions affecting cost.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 623220
New
Federal
Residential Treatment Services for SFVAHCS
Solicitation # 36C26127Q0063
The Department of Veterans Affairs, Network Contracting Office 21, is soliciting quotes for a single-award, indefinite-delivery indefinite-quantity contract to provide residential treatment services for beneficiaries of the San Francisco VA Health Care System. The services are intended for Veterans who are homeless, at imminent risk of homelessness, or have urgent mental health needs, with placements generally not to exceed 60 days. The contract includes five ordering periods running from December 2026 through November 2031, with a maximum aggregate value of 1,600,000 dollars and a guaranteed minimum of 500 dollars. The primary NAICS code is 623220 for Residential Mental Health and Substance Abuse Facilities. The selected contractor must provide comprehensive therapeutic services, including group therapy, case management, and discharge planning, while ensuring facilities meet ADA accessibility and National Fire Protection Association Life Safety Code standards. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on room and board cleanliness, nutritional standards, and customer complaint thresholds. Award will be based on the best value, evaluating factors such as facility location in San Francisco, licensure, experience with homeless Veterans, the quality of the control plan, and total price. Offerors must be registered in the System for Award Management and submit their quotes electronically by October 28, 2026.
Residential Mental Health and Substance Abuse Facilities

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS