Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

6913G6 VOLPE NATL. TRANS. SYS CNTR

UEI: XST5KMM4VEH6CAGE: 08VR3

6913G6 VOLPE NATL. TRANS. SYS CNTR is a federal contractor, registered under UEI XST5KMM4VEH6 and CAGE code 08VR3. It has been awarded $4,922,623 across 13 federal contracts. Primary work spans All Other Professional, Scientific, and Technical Services, Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology), and Engineering Services. Top awarding agencies include Department Of Transportation, National Aeronautics And Space Administration (nasa), and Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

XST5KMM4VEH6

CAGE Code

08VR3

Entity Structure

U.S. Government Entity

Established

N/A

Business Classifications

2RNG

NAICS Codes

541330Engineering Services
541380Testing Laboratories and Services
541620Environmental Consulting Services
541990All Other Professional, Scientific, and Technical Services
926120Regulation and Administration of Transportation Programs(Primary)

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

6913G6 VOLPE NATL. TRANS. SYS CNTR specializes in human factors engineering and safety-critical systems analysis for transportation infrastructure, with a focus on mitigating runway incursions through advanced human-system design. Their technical expertise lies in applying cognitive engineering, erg...

6913G6 VOLPE NATL. TRANS. SYS CNTR specializes in human factors engineering and safety-critical systems analysis for transportation infrastructure, with a focus on mitigating runway incursions through advanced human-system design. Their technical expertise lies in applying cognitive engineering, ergonomics, and behavioral analysis to aviation safety challenges, particularly in developing human-centered solutions for air traffic control environments. The contractor integrates empirical research, simulation modeling, and usability testing to inform operational protocols and technology interfaces, ensuring alignment with FAA and international aviation safety standards. Their work emphasizes real-time decision-making under stress, crew-resource management, and error-prevention strategies in high-stakes operational contexts. The contractor maintains a focused relationship with the Department of Transportation, delivering engineering services that support national transportation safety objectives. Their engagements center on research-driven interventions to reduce systemic risks in aviation, particularly through human performance analysis and system design improvements. This long-standing partnership reflects a trusted role in supporting DOT’s mission to enhance the safety and efficiency of the national air transportation network. The primary industry focus is engineering services under NAICS 541330, where the contractor applies systems engineering principles to complex transportation environments. Their vertical specialization is in aviation safety engineering, distinguishing them as a niche provider of human factors solutions within the federal transportation sector. They operate at the intersection of behavioral science and infrastructure design, serving as a technical advisor on safety-critical human-machine interfaces. As a government entity structured under 2A, 6913G6 VOLPE NATL. TRANS. SYS CNTR is a federally funded research and development center based in Cambridge, Massachusetts. While no formal certifications are listed, its institutional structure and mission alignment with DOT underscore its role as a trusted, non-commercial research partner embedded within the federal transportation ecosystem.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Transportation$3.9M78.9%
National Aeronautics And Space Administration (nasa)$603.9K12.3%
Department Of The Interior$356.9K7.3%
Department Of Defense$80.0K1.6%
Awards by NAICS
Export
541990 - All Other Professional, Scientific, and Technical Services$3.6M72.9%
541712 - Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)$603.9K12.3%
541330 - Engineering Services$324.3K6.6%
- Unknown NAICS$150.0K3.1%
921190 - Other General Government Support$87.5K1.8%
541710 - Research and Development in the Physical, Engineering, and Life Sciences$80.0K1.6%
926120 - Regulation and Administration of Transportation Programs$76.0K1.5%
Others - Other NAICS codes (2 codes, <0.5% each)$10.5K0.2%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in 6913G6 VOLPE NATL. TRANS. SYS CNTR's top NAICS codes and agencies

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project, a municipal groundwater well initiative in California to replace and decommission the existing Corydon well. The project is divided into two phases: Phase 1 focuses on civil site design, technical specifications, line-bid items for drilling and abandonment, and full-time on-site construction management oversight compliant with Riverside County and California State Water Resources Control Board requirements; Phase 2 involves detailed architectural, structural, mechanical, electrical, and instrumentation and controls design for equipping, testing, and commissioning the new well. Key technical specifications require a 24-inch stainless steel Ful-Flo louvered screen matching the existing casing depth, vertical turbine pump equipment, and discharge piping tied to the Corydon Blend station and Malaga blending location, all in accordance with AWWA, SWRCB-DDW, DWR, and EVMWD standards. Proposals must include a Preliminary Design Report with up to 30% design effort, review of approximately 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and record drawing development along with commissioning and operator training support. The solicitation is structured as a Request for Proposals with evaluation weighted toward demonstrated competence and professional qualifications, where relevant experience and team qualifications account for 25%, understanding of project scope and approach for another 25%, scope and schedule feasibility for 20%, innovation for 10%, cost value for 10%, and overall proposal quality for 10%. Cost is not the sole determinant; the highest-ranked firm will be negotiated with for a mutually agreeable scope and fee, with a not-to-exceed dollar limit expected. Respondents must submit all required certifications and forms through Attachment “2”, including American Iron and Steel Certification, Debarment and Suspension Certification, System for Award Management (SAM) Information, Conflict of Interest Disclaimer, Insurance Acknowledgment, Public Works Registration, and Executive Order N-6-22 Certification for Russia sanctions compliance. Subcontractors must be identified and their DBE status documented, along with explanations if not selected. The proposal must conform to Build America Buy America Act requirements, including sourcing documentation and waiver procedures for non-compliant materials, and adhere to telecommunications restrictions under Section 889, prohibiting Huawei and ZTE equipment. Proposals must be submitted via the PlanetBids
Ardurra Group, Inc.

POSTED

about 8 hours ago

DEADLINE

in 26 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design, construction support, and comprehensive engineering services required to replace the existing Corydon groundwater production well with a new facility while permanently abandoning the old well in full compliance with California State Water Resources Control Board and Riverside County regulations. The scope includes hydrogeological evaluation, aquifer analysis, municipal well design, borehole geophysical logging, site civil and structural engineering, utility coordination, environmental permitting, water quality sampling, and full-time construction management during the drilling phase, followed by engineering oversight during the well equipping and commissioning phase. Technical specifications mandate a 24-inch diameter stainless steel Ful-Flo louvered well screen matching the existing casing depth, with sanitary seal placement consistent with AWWA standards. The project is divided into two phases: Phase 1 focuses on technical specifications, civil design, line-bid items, bidding support, and on-site construction management, while Phase 2 covers architectural, mechanical, electrical, instrumentation, and controls design for final facility equipping. All work must adhere to the Build America, Buy America Act and 2 CFR Part 184, requiring domestic sourcing of iron, steel, and manufactured products, along with rigorous certification and documentation of origin. The project is funded by a $400,000 Bureau of Reclamation grant and non-Federal cost share, subjecting it to the full scope of federal compliance requirements including 2 CFR Part 200, Davis-Bacon, Clean Air Act, and Federal Water Pollution Control Act provisions, which must be flowed down to subconsultants exceeding $150,000. Proposals must include detailed cost breakdowns by task, hourly rates, travel expenses, and a not-to-exceed total fee capped at $1,000,000, submitted via the PlanetBids portal by September 1, 2026, with mandatory certifications for debarment status, SAM registration, executive order N-6-22 compliance, lobbying restrictions, insurance, conflict of interest, and DBE subcontractor participation. Evaluation prioritizes demonstrated qualifications and project experience (25%), technical understanding and approach (25%), schedule and scope clarity (20%), innovation (10%), cost value (10%), and overall proposal quality (10%), with award based on competence rather than lowest price. Successful contractors must maintain accurate records for four years post-final payment, submit monthly itemized invoices with progress reports, and adhere to a project timeline running from November
GEI Consultants, Inc.

POSTED

about 8 hours ago

DEADLINE

in 26 days
View Details